Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

THE MISSION ESSENTIAL GROUP, LLC

Parent1 subsidiaryUEI: VYSKHCEJKX47CAGE: 3QKA8

THE MISSION ESSENTIAL GROUP, LLC is a federal contractor, registered under UEI VYSKHCEJKX47 and CAGE code 3QKA8. It has been awarded $4,362,063,000 in federal contracts. Primary work spans Translation and Interpretation Services, All Other Professional, Scientific, and Technical Services, and Engineering Services. Top awarding agencies include Department Of Defense and Other agencies (6 agencies, <0.5% each).

Contact Information

Registration and classification details

Registration

UEI Code

VYSKHCEJKX47

CAGE Code

3QKA8

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit Organization

NAICS Codes

236220Commercial and Institutional Building Construction
541330Engineering Services
541511Custom Computer Programming Services
541512Computer Systems Design Services
541513Computer Facilities Management Services
+22 more

Subsidiaries

1 company rolls up into THE MISSION ESSENTIAL GROUP, LLC, sized by each one's own awards

See all

Compete with THE MISSION ESSENTIAL GROUP, LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for THE MISSION ESSENTIAL GROUP, LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in THE MISSION ESSENTIAL GROUP, LLC's top NAICS codes and agencies

NAICS: 541330
New
International
Field coordinator services
Solicitation # RFP 25048
The British Columbia Hydro and Power Authority (BC Hydro) is soliciting proposals under RFP 25048 for Field Coordinator Services to support the installation of new substation and generation equipment, station one-line updates, and substation capital projects within the Lower Mainland and Bridge River region. The selected consultant will provide an expert in electric utility commissioning procedures responsible for verifying that all required tests are performed and signing the Construction Notification of Energization (CNE) to confirm equipment is ready for initial energization. The contract is expected to run from approximately December 2026 to December 2028, with an optional one-year extension for a total duration of three years. Compensation is based on time spent by personnel, and all invoicing must be processed through the Ariba system with a 30-day payment term. Proposals must be submitted by November 16, 2026, via the BC Bid e-service or physical delivery to the Burnaby, BC bid station. Evaluation is based on the highest weighting of criteria, including mandatory compliance with the Freedom of Information and Protection of Privacy Act (FOIPPA). Proponents must provide comprehensive documentation, including health, safety, and cybersecurity questionnaires, as well as relationship disclosure statements. Key requirements include strict adherence to environmental packaging standards, such as the use of PVC-free and recyclable materials, and the assignment of qualified personnel who cannot be changed without prior approval from BC Hydro. The award process allows BC Hydro to reject any proposal that presents a material risk regarding financial resources, safety records, or cybersecurity.
British Columbia Hydro and Power Authority

POSTED

1 day ago

DEADLINE

in 23 days
View Details
NAICS: 541330
New
International
Village of Valemount Engineering for Accessiblity Impromvements at Cranberry Marsh
Solicitation # 2480-95-26
The Village of Valemount is seeking proposals under solicitation 2480-95-26 for engineering services to implement accessibility improvements at the Cranberry Marsh Boardwalk in British Columbia. The objective is to develop a shovel-ready planning package that includes a preferred concept plan, concept design drawings, and a Class C cost estimate. Additionally, the selected proponent must provide documentation and recommendations to support future grant applications, specifically for SHORE Stream 2. The total available budget for this project is up to 55,000 dollars, excluding GST, which must cover all professional fees, travel, and disbursements. The project must be completed by April 30, 2027, with a start date to be negotiated. All work must strictly adhere to the DWB Environmental Management Plan, requiring a qualified Environmental Monitor for sensitive phases and ensuring machinery is clean and leak-free to protect the wetland. Technical specifications require compliance with CAN/CSA-56-06 for design, CSA164 for galvanizing, and CSA G40.21M for structural steel. Proponents must submit a fixed-fee budget by phase, a work program, and a letter of introduction. This process is a request for proposals rather than a formal tender, and the Village reserves the right to negotiate a separate contract independently of the RFP process.
Village of Valemount

POSTED

1 day ago

DEADLINE

in 23 days
View Details