Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

WEDEL EXCAVATING LLC

UEI: DFHNM6YUFUC3

WEDEL EXCAVATING LLC is a federal contractor, registered under UEI DFHNM6YUFUC3. It has been awarded $220,365 in federal contracts. Primary work spans Support Activities for Forestry and Site Preparation Contractors. Top awarding agencies include Department Of Agriculture and Department Of The Interior.

Contact Information

Registration and classification details

Registration

UEI Code

DFHNM6YUFUC3

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

11

All time

Active

0

Currently performing

Completed

11

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with WEDEL EXCAVATING LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for WEDEL EXCAVATING LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in WEDEL EXCAVATING LLC's top NAICS codes and agencies

NAICS: 238910
New
Keystone Job Corps Building 14 Demo
Solicitation # keystone-job-corps-building-14-demo
The Keystone Job Corps Building 14 Demo project involves the complete demolition of the old security building and its foundation at the Keystone Red Rock Job Corps Center in Drums, Pennsylvania. The scope of work includes the removal of all debris, trees, and rocks, as well as the demolition of an old septic system. Following demolition, the contractor is responsible for backfilling, grading, and seeding the affected areas. Utility requirements include capping the sewer line and disconnecting power to Building 14 while ensuring uninterrupted power and communications for the guard shack, mountain pump house, and water tank, which may require the installation of new telephone poles. Additionally, the water shut-off valve must be replaced with a straight pipe within a single day, specifically between 8:30 AM and 3:00 PM, to minimize disruption to students. This small business set-aside solicitation requires the contractor to provide all necessary permits and implement traffic control, including flaggers on Foothills Drive. Compliance with the Davis-Bacon Act is mandatory, requiring the submission of certified payroll. Bidders must be active and registered in SAM.gov and are required to provide separate bids for labor and materials. The contractor must also provide chain of responsibility letters for all hauled-off debris and garbage.
Keystone Job Corps

POSTED

about 9 hours ago

DEADLINE

in 2 days
View Details
NAICS: 115310
New
SLED
San Poil Forest stocking Survey 2027
Solicitation # Stocking Survey 2027
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for five stocking survey contracts (SP-01-SSUR-27 through SP-05-SSUR-27) to be performed on the Colville Indian Reservation. The scope of work covers approximately 1,443 acres and 2,241 plots across the .30 mile, Swawilla, Summit North, and Williams Flats areas. Contractors are required to conduct survival and stocking surveys, submitting a detailed work plan that includes estimated daily acreage and completion schedules. Performance is measured by a Contract Officer's Representative (COR) who inspects at least 20 percent of plots; an accuracy rate of 85 percent or greater is required for acceptance, while full payment is tied to an accuracy rate of 95 percent and above. A 20 percent holdback will be withheld from all payments until all contract requirements are fulfilled. Award evaluations are based on technical qualifications and price reasonableness, with a strong preference given to certified Indian preference eligible firms. Bidders must submit a comprehensive packet including a Debarment Form, Title ID Certification, Bid Evaluation Form, and a TERO Compliance and Utilization Form. Additionally, contractors must provide liability insurance and adhere to tribal Occupational Safety Health Administration (IOSHA) standards. Those utilizing subcontractors or employees must submit a contracting and training plan to the TERO office. Failure to meet quality standards requires the contractor to rework the affected unit at no cost to the Tribe within two days of notification.
Confederated Tribes of the Colville Reservation

POSTED

about 17 hours ago

DEADLINE

in 9 days
View Details
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 17 hours ago

DEADLINE

in 17 days
View Details