Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

WHITAKER CONSTRUCTION GROUP, INC

UEI: RFBKXHF9ZH81CAGE: 5M7G1

WHITAKER CONSTRUCTION GROUP, INC is a federal contractor, registered under UEI RFBKXHF9ZH81 and CAGE code 5M7G1. It has been awarded $56,950 in federal contracts. Primary work spans Water and Sewer Line and Related Structures Construction and Unknown NAICS. Top awarding agencies include Department Of The Interior and Department Of Agriculture.

Contact Information

Registration and classification details

Registration

UEI Code

RFBKXHF9ZH81

CAGE Code

5M7G1

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationSubchapter S Corporation

NAICS Codes

237110Water and Sewer Line and Related Structures Construction(Primary)
237310Highway, Street, and Bridge Construction
237990Other Heavy and Civil Engineering Construction
238910Site Preparation Contractors
562211Hazardous Waste Treatment and Disposal

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Whitaker Construction Group, Inc. specializes in civil infrastructure construction, with core capabilities centered on heavy and civil engineering projects under NAICS 237110. The firm delivers turnkey solutions for public works including roadways, bridges, water conveyance systems, drainage infrast...

Whitaker Construction Group, Inc. specializes in civil infrastructure construction, with core capabilities centered on heavy and civil engineering projects under NAICS 237110. The firm delivers turnkey solutions for public works including roadways, bridges, water conveyance systems, drainage infrastructure, and site development, utilizing heavy equipment operations, earthmoving, grading, and concrete placement techniques. Their technical expertise includes compliance with federal and state civil engineering standards, subsurface utility coordination, erosion and sediment control, and construction management under stringent environmental and safety regulations. While specific project details are not available, their operational focus suggests deep proficiency in public infrastructure lifecycle delivery, from preliminary grading to final paving and utility integration. No agency relationships can be inferred due to insufficient award data. The contractor’s experience with federal, state, or local entities cannot be confirmed based on available records. The primary NAICS classification of 237110 indicates a focused market position in heavy and civil engineering construction, serving public infrastructure markets such as transportation, water resources, and public works. This vertical requires precise execution of earthwork, structural foundations, and large-scale earth-moving operations, often under tight regulatory oversight. The firm’s positioning is that of a regional civil contractor capable of executing complex, publicly funded infrastructure projects requiring adherence to engineering specifications and permitting frameworks. Whitaker Construction Group, Inc. is structured as a small business under the 2L entity classification and is headquartered in Paso Robles, California. The company holds no federal certifications such as 8(a), HUBZone, or WOSB. Its geographic presence is localized to California, with operations likely serving regional public works agencies and infrastructure programs. The firm’s market positioning reflects a niche role as a regional civil contractor with hands-on expertise in ground-up infrastructure development, though its federal engagement profile remains undetermined due to lack of publicly available contract history.

Key Performance Metrics

Awards Count

2

All time

Active

0

Currently performing

Completed

2

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with WHITAKER CONSTRUCTION GROUP, INC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for WHITAKER CONSTRUCTION GROUP, INC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in WHITAKER CONSTRUCTION GROUP, INC's top NAICS codes and agencies

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified DBE, MBE, and WBE firms across a wide range of NAICS codes related to heavy and civil engineering construction, including specialty trades for electrical, plumbing, and paving. Interested parties must submit their responses by October 21, 2026, directing all inquiries to the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 3 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational station, including the installation of pumps, a generator, odor control equipment, and new gravity sewers and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding MWBE documentation and the submission of Good Faith Efforts forms. Bids are due by November 12, 2026. The project requires the successful bidder to provide performance and payment bonds, as well as proof of insurance. Performance is monitored by Willis Engineers on behalf of the City of Belmont, and the contract stipulates liquidated damages of 1,000 dollars per day for failure to achieve substantial completion. Payments are processed via applications for payment and become due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project is located in California and seeks quotes from subcontractors and suppliers for various scopes of work, including electrical, paving, pipe supply, and aggregate supply. The solicitation is set aside for SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Bids must be submitted via email or fax to Veronica Garcia by October 28, 2026, at 2:00 PM and must remain valid for 120 days. Qualified bidders must possess a valid California contractor license and be registered with the California Department of Industrial Relations in accordance with Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance requirements. Additionally, the contractor reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursable up to a maximum of 3 percent of the contract value. All bonds must be issued by a surety authorized to operate within the State of California.
Flatiron Dragados Constructors, Inc.

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility in CA
Solicitation # purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility project in San Jacinto, California, for the Eastern Municipal Water District. The project aims to recharge the San Jacinto groundwater basin using a blend of recycled and advanced treated water. The comprehensive scope of work includes civil and site work, construction of a process building, installation of underground utilities, process piping, and advanced membrane treatment equipment, specifically UF and RO systems. Additionally, the project involves the development of brine ponds, including site preparation, civil improvements, the installation of lined evaporation ponds, and all necessary mechanical, electrical, instrumentation, and control systems to ensure a fully operational facility. All subcontractors must utilize union labor and provide a current DBE certification from the U.S. Small Business Administration, U.S. Department of Transportation, or an approved tribal, state, or local government entity. Bidders must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company and must include their bond rate with their quote for reimbursement. Subcontractors intending to further subcontract any portion of their scope are required to document steps one through five of the Six Good Faith Efforts. Quotes and required certifications must be submitted by October 20, 2026, at 10:00 AM PT.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 4 days
View Details