Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

WICKHAM PIPELINE CONSTRUCTION 18039 HWY 30 Hagerman ID 83332-5625 USA

UEI: SLED_3B0082C63B75E0B9

WICKHAM PIPELINE CONSTRUCTION 18039 HWY 30 Hagerman ID 83332-5625 USA is a federal contractor, registered under UEI SLED_3B0082C63B75E0B9. It has been awarded $1,092,731 across 3 federal contracts. Primary work spans Water and Sewer Line and Related Structures Construction and Commercial and Institutional Building Construction. Top awarding agencies include Fws Midwest Regional Office and Construction A/e Team 3 Fws.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_3B0082C63B75E0B9

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with WICKHAM PIPELINE CONSTRUCTION 18039 HWY 30 Hagerman ID 83332-5625 USA

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for WICKHAM PIPELINE CONSTRUCTION 18039 HWY 30 Hagerman ID 83332-5625 USA

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in WICKHAM PIPELINE CONSTRUCTION 18039 HWY 30 Hagerman ID 83332-5625 USA's top NAICS codes and agencies

NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project, estimated between 1 million and 5 million dollars, involves the purchase and erection of the steel building and concrete slab, installation of underground utilities, and the implementation of specialized systems including desiccant dehumidifying equipment and a dry pipe fire suppression system. The facility will also be solar-ready, featuring conduit installed below the roof structure for future photovoltaic panels. All work must be completed within 365 calendar days of the notice to proceed, with work commencing within 10 days of that notice. The government will award a Firm Fixed Price task order based on a balanced evaluation of technical capability and price. Technical submissions must include a task-oriented project schedule and qualifications for key personnel. The project is subject to the Davis-Bacon Act for prevailing wages in Pierce County and requires both performance and payment bonds for awards exceeding 150,000 dollars. Construction must adhere to strict technical standards, including UFC, NFPA, and IBC codes, with specific requirements for cybersecurity of facility control systems and ADA accessibility. Invoices are to be processed via Wide Area Workflow (WAWF).
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is set aside for small businesses, including certified DBE, MBE, and WBE firms, across a wide range of NAICS codes related to heavy and specialty construction. Interested parties must submit their responses by October 21, 2026. Primary coordination for this solicitation is handled by Christina Pauls at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 8 hours ago

DEADLINE

in 18 days
View Details