Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

01-0L590 Middletown Safety South Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Caltrans, District 1 - Eureka

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(3)

Middletown Safety South Project Initial Study with Negative Declaration

PDFenvironmental-assessment

Caltrans Middletown Safety South Notice of Determination 2025

PDFnotice-of-determination

2025 Environmental Document Filing Fee Cash Receipt - 2025070290

PDFreceipt

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 1 - Eureka
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 1 - Eureka
Office AddressN/A
Contacts
Nicole AlberEnvironmental Scientist

Full Description

Show more
The California Department of Transportation (Caltrans) proposes the Middletown Safety South Project on State Route 29 between Post Miles 5.0 and 5.9 in Lake County. The proposed project work includes shoulder widening to accommodate standard shoulder widths (8’ width), left turn channelization, two way left turn lane (TWLTL), new and modified curb ramps, bulbouts, approximately 1,200 feet of new sidewalk, lighting, installation of two pedestrian-activated rectangular rapid flashing beacons (RRFB), and extending two existing culverts to maintain drainage (PM 5.24 and the system at PMs 5.37–5.45). Additional drainage system improvements include replacement of 1 culvert and repair to 1 drainage inlet.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS