02-2K000 Whiskey Creek Bridge Emergency Repair Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Caltrans, District 2 - Redding

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

SR 299/Whiskeytown Creek Rd, Redding, CA, 96001

Set-Aside

NONE

Documents

(5)

Whiskey Creek Bridge Emergency Repair Project Initial Study and Proposed Negative Declaration

PDFinitial-study-negative-declaration

Whiskey Creek Bridge Emergency Repair Notice of Completion

PDFnotice-of-completion

Whiskey Creek Bridge Replacement Project Notice of Intent 10-20-25

PDFnotice-of-intent

CDFW Comment on Whiskey Creek Bridge Emergency Repair Project IS/ND

PDFcomment

Whiskey Creek Bridge Emergency Repair Project Summary Form

PDFsummary-form

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 2 - Redding
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 2 - Redding
Office AddressN/A
Contacts
Nicole AlberEnvironmental Scientist

Full Description

Show more
The California Department of Transportation (Caltrans) proposes the Whiskey Creek Bridge Emergency Repair Project to replace Whiskey Creek Bridge, including the bridge deck and superstructure. The project is located on State Route 299 in Shasta County between Post Miles 13.55 and 14.58. The scope of work would include: - Widening State Route 299 from 33 feet to 66 feet to include a 15-foot-wide bike and pedestrian path on the bridge portion only - Excavating and constructing part of the existing abutments - An embankment reinforcement geogrid would be placed for road widening - Placement of 0.1-feet of Hot Mix Asphalt (HMA) and base quantities for widening and conforming earthwork to the new structure - Trestles would be installed temporarily for construction - Extending existing drainages and installing new drainage systems - Install new guardrail – Midwest Guardrail System (MGS) - Install new concrete barriers - Install new fencing along edge of pavements - Clearing and grubbing - Demolish the existing bridge superstructure - Construct a new raised island, with stamped concrete, at the Whiskeytown Creek Road intersection at PM 13.87 to better accommodate truck turns Proposed staging areas would utilize existing roadside pullouts within the project limits. No additional right of way would be acquired. The Whiskeytown National Recreation Area and road connection at Post Mile 14.50 would be utilized during construction for staging and would be paved after construction is finalized. Drainage improvements would involve upsizing two existing culverts at Post Miles 13.76 and 13.85 from 18-inch-diameter to 24-inch diameter and extending them to accommodate roadway widening. Overside drains impacted by the widening would also be replaced. New drainage systems would be added to accommodate drainage impacts due to the installation of new concrete barriers to protect pedestrians with drainage inlets of 18-inch-diameters and overside drains of 12-inch-diameters

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Peninsula Avenue And Delaware Street Traffic Signal Modification Project
Solicitation # 46R031
The Peninsula Avenue and Delaware Street Traffic Signal Modification Project (Project No. 46R031) is a public works solicitation issued by the City of San Mateo, California. The project involves modifying the street lighting system to ensure full functionality and operational capacity, with a scope of work that includes mobilization, temporary traffic and pedestrian control, asphalt paving and base removal, and the installation of various concrete structures, pavement markings, and electrical components. The estimated construction cost is 533,325 dollars, and the project must be completed within 45 working days. Bids are due by 2:00 p.m. on October 15, 2026, and must be submitted as sealed bids to the City Clerk. The contract will be awarded to the lowest responsive and responsible bidder who possesses a Class A contractor's license and the necessary capacity to perform the work. Award criteria include the bidder's experience, the quality of previous work and materials, and the ability to meet the project timeline. Requirements for the winning contractor include providing a bid bond of at least 10 percent of the aggregate bid, as well as performance and payment bonds equal to the full contract price. Additionally, the contractor must comply with California Prevailing Wage Law, ADA accessibility standards, and provide a one-year warranty against latent faults or defective materials. All work must adhere to the 2018 Caltrans Standard Plans and the April 15, 2022, Caltrans Revised Standard Specifications.
CITY OF SAN MATEO, CALIFORNIA

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS