Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

07-0Y520 VEN-23 Highway Maintenance Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 7 is proposing a Highway Maintenance Project on Route 23 in Ventura County, spanning from post-mile 17.7 to 24.2, to preserve and extend the life of the existing pavement through a combination of surfacing and safety improvements. The work includes a gap-graded RHMA overlay and grinding of non-compliant guardrails from PM 17.7 to 20.99, followed by a Type II slurry seal from PM 20.99 to 24.2. Additional work involves crack treatment, shoulder backing, digouts to a maximum depth of six feet, installation of high-visibility crosswalks, and placement of new roadside signs as part of Complete Streets enhancements. The project aims to address pavement deterioration, improve safety for pedestrians, and provide a right edge line on a short segment without requiring new right-of-way acquisition or utility relocation. All work will be conducted within the existing roadway corridor using hand excavation where necessary, with no plans for major earthmoving or infrastructure relocation. The project is forecasted to be released on November 24, 2025, and inquiries can be directed to Caltrans Environmental Scientists Hannah Tram and Lillian Cai.

General Info

Caltrans to repair Route 23 pavement with RHMA, slurry seal, crack treatment, crosswalks, and signs from PM 17.7 to 24.2.

Agency

California → Caltrans, District 7 - Los Angeles

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 7 - Los Angeles
Office AddressN/A
Contacts
Hannah TramEnvironmental Scientist
Lillian CaiEnvironmental Scientist

Full Description

Show more
Caltrans proposes a Highway Maintenance Project which includes the following scope of work: 1) RHMA (Gap graded) overlay (and grind at old/non-compliant guardrails) in both directions from post-mile (PM) 17.7 to R20.99, 2) slurry seal type II in both directions from R20.99 to 24.2, 3) crack treatment, shoulder backing, digouts, 3) high visibility crosswalks, and 4) roadside signs throughout Route 23 from PM 17.7 to 24.2 in Ventura County. The purpose of this project is to preserve the existing pavement and extend the service life of the project segment through slurry seal and overlay, digouts, crack treatment, and shoulder backing. The need for the project is to address pavement deterioration, maintenance of segments in good condition, crosswalk upgrades to improve safety, providing a right edge line for a short segment, and installation of roadside signs as part of Complete Streets enhancements. Excavation (hand digging) is proposed to a maximum depth of 6 feet. No public utilities will be relocated, and no new right-of way will be acquired for the project.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center in Illinois, is seeking bids for a fixed-price, single lump sum subcontract for road and parking lot repairs. The project scope includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, west side of dorms, kitchen/BCT, and dumpster/maintenance areas. Additionally, the contractor must perform repairs on five storm sewer drain structures and five potholes. The estimated contract value ranges from $100,000 to $250,000, with a performance period of 90 consecutive business days following a written Notice to Proceed. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Bids are due by October 21, 2026, and must include a detailed cost breakout, a bid bond guarantee of 20% for bids over $25,000, and proof of a mandatory site visit. Award decisions will be based on overall best value. The project is subject to Construction Wage Rate Requirements, necessitating weekly certified payroll and compliance with prevailing wage determinations. Performance and payment bonds are required for awards exceeding $25,000 from a surety company with at least an A- rating. Final payment is contingent upon a successful final inspection, submission of a Notice of Final Completion, and a 10% retainage held until substantial completion.
Joliet Job Corps

POSTED

about 4 hours ago

DEADLINE

in 15 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS