Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

0V530 PAVEMENT PRESERVATION

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Caltrans, District 12 - Orange

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Laguna Beach, CA

Set-Aside

NONE

Documents

(1)

Caltrans Pavement Preservation EA 0V530 Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 12 - Orange
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 12 - Orange
Office AddressN/A
Contacts
Bahar HeydariAssociate Environmental Planner

Full Description

Show more
The Caltrans proposed maintenance project includes removal of a depth of 0.10’ of existing asphalt pavement by cold plane and replacement with Rubberized Hot Mix Asphalt (RHMA) along Northbound State Route 73 (NB SR-73) off-ramp and loop on-ramp at State Route 133 (SR-133) Laguna Canyon Road, and SR-133 from the SR-73/SR-133 Separation to Laguna Lakes Trail Bridge, in the city of Laguna Beach, County of Orange. Work includes grinding, detours, a temporary 8-hour ramp night closure, ground disturbance and soil disturbance for temporary sign-post installations of 4” by 6” post and 4.5’ embedment depth. The purpose of the project is to preserve the roadway by repairing distressed pavement along SR-133 mainline and SR-73 loop on/off ramps. The need of the project is due the current condition of the concrete pavement on SR-133 and SR-73 exhibits surface distresses that require repairs; if left uncorrected, will deteriorate to a major roadway rehabilitation need. No vegetation removal is anticipated. Disturbed soil area is anticipated to be less than 1.0 acre. The project has state funding. The project will require approximately 80 working days. All work will occur within paved travel way within State right of way. No new right of way is anticipated.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS