10-1V390-DO Culvert and Sinkhole Repair

Forecast
10-1V390State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation, through District 10 in Stockton, is initiating a project to address critical infrastructure failure at post mile 11.38 on State Route 99 in Ceres, Stanislaus County. The work centers on replacing a compromised culvert that has led to the formation of two sinkholes on the northbound onramp, threatening the structural integrity of the roadway. The scope encompasses full excavation, removal of the damaged culvert, installation of a new drainage system, stabilization of the sinkholes, and restoration of the pavement surface. This effort is essential to prevent potential loss of life, damage to property, or disruption of essential public services by ensuring the long-term stability and functionality of the transportation corridor. The project is officially designated as 10-1V390-DO Culvert and Sinkhole Repair and has been posted as a forecast with a public notice date of June 5, 2026. While no solicitation number or set-aside details are currently available, the work is being managed by Caltrans and coordinated through the agency’s environmental planning team. Primary point of contact for inquiries is Ishnav Guleria, Associate Environmental Planner (Generalist), who can be reached via phone or email. The project site is located in Ceres, California, and all work will be conducted in accordance with state transportation and environmental standards to mitigate risks and restore safe, reliable highway operations.

General Info

Caltrans to repair culvert and sinkholes on SR-99 in Ceres to restore roadway safety and stability.

Agency

California → Caltrans, District 10 - Stockton

Place of Performance

Ceres, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 10 - Stockton
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 10 - Stockton
Office AddressN/A
Contacts
Ishnav GuleriaAssociate Environmental Planner (Generalist)

Full Description

Show more
The California Department of Transportation (Caltrans) proposes a Director’s Order project to replace a culvert at post mile 11.38 on State Route (SR) 99 in Stanislaus County. Two sink holes were discovered on the single lane northbound onramp and further investigation revealed that the drainage system was compromised. The scope of work includes excavation, culvert replacement, sinkhole stabilization and pavement repair. The purpose of this project is to replace the damaged and failing culvert system. The project is needed to prevent the loss or impairment of life, property, or essential public services.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of subcontractors and suppliers for underground construction, including tunneling, boring, jacking, and micro tunneling, as well as the installation of steel casing, valves, and cathodic protection. Additional requirements encompass site preparation and civil works such as land surveying, site photography, clearing, shoring, subgrade roadbed work, asphalt paving, and the implementation of storm water pollution prevention measures. Deliverables include the completed collector line infrastructure, manholes, traffic signs, signals, lighting, and landscaping. This solicitation is open to small businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Kiewit emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested parties must submit their quotes by November 18, 2025, via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237310
New
International
Conservation Work and Access Road Improvement of Shahr-e Gholghola to Chehel Dukhtaran Ancient Qalah and Access Road Improvement of Zargaran Bala and Zargaran Payeen Valley in Bamiyan, Afghanistan Aziz Ur Raman Tanha - [email hidden]
Solicitation # AFG26ITB009
UNESCO is soliciting bids for a large-scale works project in Bamiyan province, Afghanistan, focused on preserving heritage properties and upgrading informal settlements in Sayed Abad, Zargaran Bala, and Zargaran Payeen villages. The scope of work includes the conservation of the Ancient Qalahh of Chehel Dukhtaran, improvement of access roads from Shahr-e Gholghola to the Qalahh, and the installation of drainage systems. Key construction activities involve stone masonry, Plain Cement Concrete (PCC), boulders, and Reinforced Cement Concrete (RCC). The project is supported by the government of Italy and implemented through UNESCO and UN-Habitat. The contract will be awarded to the lowest priced technically qualified bidder based on criteria including technical capacity, experience, and compliance with specifications. The performance period requires commencement within 45 days of site access, with substantial completion expected within four months. Financial terms include a potential 20% advance payment, with progress payments submitted monthly and final payment processed 30 days after the issuance of a Certificate of Substantial Completion. Contractual obligations include a 10% performance guarantee valid for 12 months post-completion and a 12-month defects liability period. Liability insurance must cover the contract value plus 10%. For delays, liquidated damages are set at 0.35% of the contract price per calendar day, capped at 10%. Bidders must submit their proposals in PDF format via email by November 29, 2026, ensuring all files are under 10MB per email and avoiding third-party file-sharing tools.
UNESCO

POSTED

about 22 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Salem Twp- T-16 Culvert Washout Replacement
Solicitation # 49913
The Salem Township T-16 Culvert Washout Replacement project involves the emergency repair of a culvert washout on Duck Creek Road in Whipple, Ohio. The scope of work requires the contractor to provide all labor, equipment, and materials to replace the existing washout with a pre-cast concrete four-sided box culvert. The project is governed by the 2023 Ohio Department of Transportation Construction and Materials Specifications and the requirements of the Washington County Engineer. The estimated project cost is $91,527.00, and the contract will be awarded to the lowest and best bidder, provided the bid does not exceed the estimate by more than 10 percent. All work must be completed by April 1, 2027, with a one-year guarantee against defects following final payment. Contractors must adhere to strict regulatory requirements, including Ohio Prevailing Wage Laws, the Ohio Bureau of Worker’s Compensation Drug-Free Workplace Program, and Ohio preference for local products and labor. Required deliverables for the pre-construction meeting include a subcontractor list, a construction schedule, and road closure estimates. The contractor must provide a bid guaranty and, if necessary, a performance bond. Additionally, the project mandates compliance with various federal non-discrimination acts and requires the submission of certified payrolls and proof of Ohio workers' compensation coverage. The Township serves as the sole judge of the quality of materials and workmanship, and the pre-cast box culvert must be installed within a single day after coordinating with the county.
Washington County, OH - Engineer

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 237310
New
SLED
KTA 8297
Solicitation # 8297
KTA Contract 8297, managed by the Kansas Turnpike Authority, involves the installation of an Ultrathin Bonded Asphalt Surfacing (UBAS) overlay on I-35, including interchanges, from mile marker 112 to 132 in Lyon County. The scope of work encompasses UBAS, commercial grade asphalt patching and surfacing, patching of the I-35 mainline, and the milling and inlaying of the outside shoulder. Key deliverables include the installation of specific pavement markings, such as 12-inch white chevron lines and 6-inch yellow edge lines, and the implementation of comprehensive work zone traffic control. Performance is scheduled in phases, with asphalt patching and commercial grade paving starting no earlier than April 12, 2027, and UBAS and remaining work commencing after May 31, 2027. The contract will be awarded to the lowest responsible bidder based on the summation of unit prices multiplied by approximate quantities. Bidders must provide a statement of financial condition unless pre-qualified by the Kansas Department of Transportation or the Authority, and must submit a bid bond of 5 percent of the bid. The contractor is required to provide certificates of insurance for Workers' Compensation, Employer's Liability, and Comprehensive Public Liability and Property Damage Insurance. All work must adhere to the 2015 Standard Specifications for State Road and Bridge Construction and KDOT Construction Manual standards, with strict prohibitions against making turnarounds through the barrier wall.
Kansas Turnpike Authority

POSTED

1 day ago

DEADLINE

in 2 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement