Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oregon was posted on March 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

100315 - NW Walker Road - NW 185th Ave to NW 173rd Ave

Closed
2026.011-LUT CPSState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work encompasses site preparation, pipeline and utility installation, and surface improvements. Key activities include land surveying, site clearing, subsurface investigation, shoring, tunneling, boring, jacking, and micro tunneling. Additionally, the project requires the installation of steel casing, cathodic protection, valves, asphalt paving, landscaping, and the provision of traffic signs, signals, and lighting. Material requirements include ready mix supply, precast concrete, and manhole materials, alongside environmental support such as storm water pollution prevention. This solicitation is open to qualified subcontractors and suppliers, with a strong emphasis on Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise certified firms. To be considered responsive, bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for responses is November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 22 days
NAICS: 237310
New
SLED
Construction On State Highway In Riverside County In Desert Hot Springs From 0.3 Mile South To 0.4 Mile North Of Pierson Boulevard
Solicitation # 08-1N8804
Solicitation 08-1N8804 is a construction project issued by the California Department of Transportation for work on a state highway in Desert Hot Springs, Riverside County. The project scope covers the area from 0.3 mile south to 0.4 mile north of Pierson Boulevard and involves the installation of hot mix asphalt, imported borrow, and signal and lighting systems. Key technical deliverables include the deployment of IP67-rated Type 4 cameras with real-time analytics for vehicle detection and the integration of network equipment at the Inland Empire Transportation Management Center. The estimated cost of the project is 3,530,000 dollars, with bids required on a unit price basis. The contract mandates strict adherence to Buy America standards per 2 CFR 184.6, requiring all manufacturing processes to occur within the United States. Compliance includes providing manufacturer certificates of compliance and ensuring hardware meets NEMA TS-1/TS-2 and IEEE 802.3 standards. Environmental and safety requirements include MASH compliance for highway safety features and certifications from a registered civil engineer or professional geologist regarding pH and lead levels in local materials. Additionally, the project requires the payment of prevailing wages as determined by the California Department of Industrial Relations and includes specific submittal requirements for Disabled Veteran Business Enterprise quotes. Final acceptance is contingent upon the successful completion of physical, performance, and functional tests, including specific network metrics such as latency and packet loss.
California Department of Transportation

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
Construction On State Highway In Mendocino County About 8 Miles South Of Willits From 0.2 Mile North Of Ridgewood Ranch Road To 0.4 Mile South Of Black Bart Road
Solicitation # 01-OL3804
Solicitation 01-OL3804 is a cost-plus-time construction contract issued by the California Department of Transportation for work on State Highway Route 101 in Mendocino County. The project is located approximately 8 miles south of Willits, extending from 0.2 mile north of Ridgewood Ranch Road to 0.4 mile south of Black Bart Road. With an estimated project cost of 13.7 million dollars, the scope of work includes roadway excavation, the placement of Hot Mix Asphalt and High Friction Surface Treatment, and the installation of asphalt concrete pavement and concrete barriers. Additional deliverables include the construction of concrete curbs, sidewalks, railings, fences, and the implementation of a lead compliance plan and erosion control measures. The contract is governed by 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Key compliance requirements include adherence to Buy America/Build America standards for manufactured products, the use of LCPtracker Pro for electronic certified payroll records, and strict environmental regulations regarding aerially deposited lead. Performance is subject to specific time constraints, notably that work within drainage channels is only permitted from June 15 to October 15. Bidders must comply with California Department of Industrial Relations prevailing wage rates and provide certifications for off-road diesel-fueled vehicle compliance. The response deadline for this solicitation is December 8, 2026.
California Department of Transportation

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
Construction On State Highway In Santa Barbara County Near Santa Ynez From 0.1 Mile North Of Route 246 To 0.1 Mile South Of Route 246
Solicitation # 05-1R5704
Solicitation 05-1R5704 is a unit price basis contract issued by the State of California Department of Transportation for infrastructure upgrades on State Highway 154 in Santa Barbara County. The project scope focuses on lighting, striping, and signage improvements from 0.1 mile north to 0.1 mile south of Route 246. Key technical requirements include micro-surfacing, tack coat application, thermoplastic traffic striping, and the installation of pavement markers. The work also involves relocating and installing roadside signs, modifying flashing beacon systems, and implementing erosion control through hydroseed and compost application. Specialized construction tasks include the installation of Cast-In-Drilled-Hole concrete piles, requiring a contractor with a proven track record of at least three similar foundation projects in the last five years. The project has an estimated value of 820,000 dollars and must be completed within 50 working days. Bids are due by 2:00 p.m. on November 19, 2026, via the Bid Express website and must include bidder security of at least 10 percent of the bid. Compliance requirements are stringent, including adherence to Buy America/Build America standards, DIR general prevailing wage rates, and environmental product declarations for concrete and asphalt. Quality control is managed through specific survey accuracy standards for horizontal and vertical coordinates and requires personnel with ACI Concrete Field-Testing Technician Grade 1 certification. The contract also emphasizes diversity through submittal requirements for Disabled Veteran Business Enterprise quotes and small business preferences.
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION

POSTED

about 3 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The contract involves the construction and improvement of a segment of NW Walker Road in Washington County, specifically between NW 185th Ave and NW 173rd Ave. The primary scope of work includes widening the roadway to a 5-lane section complete with curbs, sidewalks, and lighting. Additional tasks consist of intersection widening, retaining and sound wall construction, and installing a comprehensive stormwater management system that features piped conveyance, water quality treatment, and detention facilities. The project also calls for the installation of signage, striping, illumination, traffic signals, and a new waterline, as well as any other incidental work as outlined in the specifications and plans. Issued by the Oregon LUT-CPS agency, the solicitation is identified as 2026.011-LUT CPS and was posted on March 9, 2026, with a response deadline set for March 25, 2026. The project is located in Washington County with the office address in Hillsboro, Oregon. Primary contacts for the project include Kira Furby, Engineering Associate, and Kiersten Vanderhoof, Senior Procurement Analyst. The contract represents a significant infrastructure upgrade aimed at enhancing traffic flow, safety, and stormwater management within this corridor in Washington County.

General Info

Construction of NW Walker Road widening to 5 lanes with sidewalks, lighting, stormwater, and traffic improvements.

Place of Performance

OR, USA

Set-Aside

NONE

Documents

9

Bid Documents for 100315 - NW Walker Road - NW 185th Ave to NW 173rd Ave

PDF, High priority: read this first28 pages · ifb
High

Bid Documents for NW Walker Road 185th Ave. to 173rd Ave. - Bid 2026.011-LUT CPS

PDF, High priority: read this first28 pages · rfb
High

Bid Guaranty Form for NW Walker Road Construction

PDF, High priority: read this first1 page · bid-guaranty
High

City of Beaverton Waterline Plans Schedule B

PDF, High priority: read this first29 pages · specifications
High

First-Tier Subcontractors Disclosure Form for NW Walker Road Project

PDF, High priority: read this first1 page · first-tier-subs-disclosure
High

Tualatin Valley Water District Waterline Plans Schedule C

PDF, High priority: read this first22 pages · specifications
High

Washington County Bid Document Book 2 - NW Walker Road 185th Ave to 173rd Ave

PDF, High priority: read this first336 pages · bid-document-book
High

Signature Page for Bid Acceptance and Contract Execution

PDF, Low priority1 page · signature-page
Low

100315_13_Walker_Phase_3_Bid_Set.pdf

PDF305 pages

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → LUT-CPS
Contacts2 people available
OfficeHillsboro, OR, 97124, USA
Organization / AgencyOregon → LUT-CPS
Office AddressHillsboro, OR, 97124, USA
Contacts
Kira FurbyEngineering Associate
Kiersten VanderhoofSenior Procurement Analyst

Full Description

Show more
The project name is: 'Project Title . The work to be done under this contract consists of the following in Washington County: Construct roadway widening and construction of a 5-lane section on NW Walker Road including curbs, sidewalks, and illumination. Construct intersection widening and improvements. Construct retaining walls and sound walls. Construct piped storm water conveyance system with water quality treatment and detention. Install signing and striping. Construct illumination and traffic signals. Construct waterline. Perform additional and Incidental Work as called for by the Specifications and Plans. The Project cost range is 'Project Cost Range .

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS