Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oregon was posted on March 7, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

100461 - Precast Culvert Solicitation for NW Springville Road

Closed
2024.040-ITQState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 19 days
NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)
Solicitation # CIP 20083
The Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083) is a public works solicitation by the City of Tustin, California, for the construction of park infrastructure. The scope of work includes site excavation, plumbing, electrical, instrumentation, street improvements, and the installation of a 12-foot multi-modal path and a 6-foot walking trail. The project has an engineer's estimate of 11,100,000 dollars and a project schedule of 190 contract days. Bidders must hold a Class A contractor's license and submit their proposals via the OpenGov portal by December 10, 2026, at 2:00pm. A critical requirement for responsiveness is the submission of the bid bond both as an electronic upload and as a hard copy delivered to the City Clerk. The contract will be awarded to the low bidder based on the total sum of correctly calculated unit prices. The successful contractor must provide a project baseline schedule within 15 calendar days of execution and adhere to strict safety and quality standards, including Cal-OSHA requirements for qualified persons working near utilities and 2008 ADA Standards for Accessibility. Payment is structured as monthly progress payments at 95 percent of the work value, with the final 5 percent retained until 60 days after the recordation of the Notice of Completion. Liquidated damages are set at 8,800 dollars per calendar day for delays. Required post-award documentation includes payment, faithful performance, and guaranty bonds, as well as a compensation insurance certificate.
Public Works

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
CITB 2026C045
Solicitation # 2026C045
Invitation to Bid No. 2026C045 is issued by the Municipality of Anchorage for the Old Seward Highway Surface Rehabilitation project, Phase 2, spanning from International Airport Road to Tudor Road. With an estimated construction cost between 3 million and 5 million dollars, the scope of work includes asphalt pavement rehabilitation, sidewalk and curb replacement, storm drain improvements, and the treatment of contaminated soils. The project requires the contractor to provide all labor, equipment, and materials, adhering to the 2024 Municipality of Anchorage Standard Specifications and various state and national traffic and electrical codes. Key deliverables include the installation of inlaid traffic markings, flexible delineators, and the coordination of access for adjacent businesses and school bus routes. The bidding process requires the submission of sealed paper bids to the MOA Purchasing Department by 2 PM local time on November 5, 2026, as electronic submissions are not accepted. Bidders must provide a bid bond, valid state and municipal contractor licenses, and a SAM report. The contract will be awarded to the responsible bidder who submits the lowest responsive bid, with preferences available for local and veteran bidders. Awardees must comply with a Community Workforce Agreement and prevailing wage requirements. Environmental compliance is critical, as work in Campbell Creek requires a Fish Habitat Permit and is subject to inspection by the U.S. Army Corps of Engineers, while soil testing must follow specific EPA and ADEC protocols for lead contamination.
Municipality of Anchorage

POSTED

about 12 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Parking Lot E8 Repairs
Solicitation # CSULBSOQ80
The Parking Lot E8 Repairs project (Project Number PE825PK023) at California State University, Long Beach, involves the complete removal of existing four-inch asphalt pavement and the upper 18 inches of soil, including cement-treated soil. The scope of work requires the installation of new asphalt over non-expansive fill compacted to at least 95 percent relative compaction, as well as the installation of one new EV charging station and the conversion of nine EV-ready stalls to full charging capability. The owner's construction estimate for this public works project is 3,700,000 dollars, with anticipated construction occurring between April 1 and July 30, 2027. Bidders must hold a valid California contractor's license in either the C-12 or B classification and must be prequalified through the PlanetBids portal. A mandatory site walk was scheduled for November 16, 2026, and sealed bid proposals are due by 2:00 p.m. on December 16, 2026. The project is subject to prevailing wage rate laws, requiring all contractors and subcontractors to be registered with the Department of Industrial Relations. Additionally, the project will be enrolled in the CSU Builders Risk Insurance Program and potentially the Owner-Controlled Insurance Program. Award will be based on the lowest responsive and responsible bid, with specific incentives provided for Disabled Veteran Business Enterprise (DVBE) participation. While a minimum of 3 percent DVBE participation is required, incentives ranging from 1 to 3 percent are available for participation levels between 4 percent and 6 percent or more, subject to a 50,000 dollar cap when combined with Small Business Preferences and a total cumulative adjustment limit of 100,000 dollars.
Purchasing Office Department of California State University, Long Beach

POSTED

about 14 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

This contract involves the manufacture, storage, and delivery of a single precast reinforced concrete box culvert, with the solicitation identified as 2024.040-ITQ, posted on March 7, 2024. The project is managed by the Oregon Department of Land, Water & Conservation (LUT-CPS) and is targeted towards suppliers capable of providing precast concrete products under NAICS code 237310. The response deadline for interested vendors is March 15, 2024, emphasizing the need for timely submission. The contract is part of a procurement process open to qualified entities, with the primary point of contact being Kira Furby, who can be reached via email or phone for further inquiries. The work is to be performed within Oregon, and interested parties can access additional details through the provided online portal.

General Info

Place of Performance

OR, USA

Set-Aside

NONE

Documents

4

100461 - Precast Culvert Solicitation for NW Springville Road

PDF, High priority: read this firstrfq
High

Springville Road Widening Improvements Geotechnical Engineering Report

PDF, Low prioritygeotechnical-engineering-report
Low

100461_-_West_Culvert_plans_and_details.pdf

PDF

2023-GOODS-SAMPLE_CONTRACT.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → LUT-CPS
Contacts1 person available
OfficeN/A
Organization / AgencyOregon → LUT-CPS
Office AddressN/A

Full Description

Show more
This quote will be for the manufacture, storage, and delivery of one precast reinforced concrete box culvert.

More opportunities from Oregon → LUT-CPS

Same awarding agency

New
SLED
Early Tree Removal for Capital Project Services
Solicitation # 2026.099-ITQ
Washington County, Oregon, is soliciting bids for Early Tree Removal (ETR) capital project services under solicitation 2026.099-ITQ. The scope of work involves the removal of designated trees within the public right-of-way across multiple locations, specifically including SW Kinnaman Road, NW Thompson Road, and SW Denney Road. Key deliverables include the removal of specific tree quantities, such as 41 trees for the Denney Road project, with a completion deadline of January 15, 2027. Contractors are required to implement strict tree protection measures, including the use of orange plastic mesh fencing and specific erosion control methods like straw wattles or compost socks to avoid root damage. Site restoration requires covering ground surfaces with topsoil and arborist rich mulch. The project demands high technical standards, requiring crown pruning to be performed by licensed and insured providers following ISA Best Management Practices and ANSI A300 standards. All work must comply with OSHA standards and ORS 92.044(7) regarding utility infrastructure. Administrative requirements include a thirty-day payment term following invoice approval and strict contractor certifications regarding debarment, tax compliance in Oregon, and non-discrimination laws. The solicitation is managed by the LUT-CPS agency, with primary contact Kira Furby and secondary contact Kiersten Vanderhoof, and responses are due by November 6, 2026.

POSTED

3 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS