Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

10th Street Reconstruction Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of Riverside Transportation Department is implementing the 10th Street Reconstruction Project (Project No. D1-0051) in the community of Lakeview. The project involves replacing approximately 0.74 miles of asphalt concrete pavement on 10th Street, a secondary highway, between Reservoir Avenue and Wolfskill Avenue. The scope of work includes pulverizing the existing pavement, moisture conditioning, mixing and recompacting materials, and paving with Hot Mix Asphalt. Additional requirements include reconstructing asphalt concrete dikes and driveways, installing energy dissipators with rip rap and cutoff walls, placing safety edges and shoulder backing, adjusting valve cans, hydroseeding, restriping the roadway with markers and reflectors, installing new signs, and performing utility adjustments. The project is managed under work order ZD40051C and task code Z1530, with Frances Segovia serving as the Environmental Project Manager. It is exempt from the California Environmental Quality Act under Section 15301(c) as it does not expand the roadway. Compliance with the Western Riverside County MSHCP is required. Environmental protections include mandatory pre-construction nesting surveys for migratory birds if vegetation removal occurs between February 1 and August 31, and a Burrowing Owl presence/absence survey conducted by a qualified biologist within 30 days prior to ground disturbance.

General Info

Reconstruct 0.74 miles of 10th Street with stabilized base, hot mix asphalt, safety upgrades, and utility adjustments.

Agency

California → Riverside County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

10th Street Reconstruction Project Notice of Exemption W.O.#ZD40051C

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Riverside County
Office AddressN/A
Contacts
Frances SegioviaEnvironmental Project Manager

Full Description

Show more
The County of Riverside Transportation Department is proposing to replace approximately 0.74 miles of existing asphalt concrete pavement on 10th Street from Reservoir Avenue to Wolfskill Avenue in the community of Lakeview. The County of Riverside General Plan classifies 10th Street as a Secondary Highway. This road is currently a two-lane road with a road width of 24 feet. The proposed work will consist of grinding in place (pulverize) the existing concrete asphalt pavement on 10th Street, perform moisture conditioning, mixing and recompacting grindings with existing native material, and paving back the new base with Hot Mix Asphalt (HMA). The project will include the following: • Reconstruction asphalt concreate dikes. • Reconstruction of asphalt concreate driveways • Construction of energy dissipator (rip rap installation and cutoff walls). • Placement of safety edge and shoulder backing. • Adjustment of valve can • Application of hydroseeding. • Restriping of roadway, including pavement markers and reflectors. • Salvage/removal and installation of new signs. • Utility adjustments

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 12 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 18 hours ago

DEADLINE

in about 2 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS