Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Michigan was posted on December 27, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

112 E. Wilkins St - Demolition (HOUSE)

Closed
546State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 15 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

This contract involves the comprehensive demolition of a residential property located at 112 E. Wilkins Street, Michigan, under the jurisdiction of the City of Jackson. The scope includes hazardous material abatement following MIOSHA and DEQ regulations, removal and replacement of sidewalks, curbs, and entry approaches, and site regrading to ensure proper drainage and integration with surrounding areas. The project requires careful handling of water and sewer services, with the contractor responsible for verifying service functionality post-demolition if records are unavailable. Tree and shrub removal is specified to facilitate site regrading, along with planting new street trees and main site trees as directed by the city. Additional tasks include removing driveways, concrete pads, fencing, retaining walls, and overgrowth along the alley to prepare the site for regrading and landscaping. The project is scheduled as a winter demolition effort, with a payment structure based on a 70% billable amount upon completion of major demolition activities, including debris removal and grading by March 14, 2025. The remaining 30% will be paid after final grading, topsoil placement, seeding, and straw application, with all work to be finalized by May 22, 2025. The contract is valued between $50,000 and $150,000, and responses are due by January 10, 2025. The project emphasizes environmental compliance, site cleanup, and ensuring the property is fully prepared for future development or landscaping as per city specifications.

General Info

Place of Performance

MI, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMichigan → City of Jackson
ContactsNo contacts available
OfficeN/A
Organization / AgencyMichigan → City of Jackson
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
112 E. WILKINS ST - DEMOLITION (HOUSE)Hazardous materials must be abated in accordance with MIOSHA and DEQ regulations and the attached Pre-Demolition Compliance Survey assessment. Compact all clean backfill material with a hoe-pack or vibrating roller compactor.Remove 1 curb(s) cut(s) and entry approach(s).  (16’ lineal feet) Install 20 lineal feet of curb and gutter.  Remove and replace 40 lineal feet of cracked, heaved and broken public sidewalks. (raise grade through walk to allow to cover tree roots and provide positive slope to ROW area) See enclosed water and sewer service records for approximate location and any special instructions for shared services.  If no service card is provided it is the contractor’s responsibility to ensure that neighboring water and sewer services are operational at the conclusion of the demolition.Trees/shrubs: Remove all trees to N. of property to allow for site regrade. Remove 5 marked trees to the NW corner of property.  Remove all brush to the N and E to the alley way to allow for removal of all debris.  Plant 2- 2 1/2” caliper street trees. Japanese Lilac, Cleveland Pear along E Wilkins ROW area. Plant 2 2 ½” Maple trees on main site to locations selected by City of Jackson.Miscellaneous:   Remove driveway and concrete pads to N. Remove chain link fencing to N and W. Remove N retaining wall extending to E alley to allow for full site regrade to blend with N. property. Remove all overgrowth along alley to allow for full regrade.  Remove all trash and debris from property and all debris that has extended to E alley.This will be a winter work demolition project with 70% billable upon completion of all demolitions, tree and brush removals, removal of all retaining walls and listed debris and providing a quality bladed winter grade completed no later than March 14th, 2025.  Final completion to bill remaining 30% for concrete, final grade/topsoil/seed/straw then completed no later than May 22, 2025.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS