Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

12-0W190 Minor B

Forecast
0W190State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project, designated as Minor B 0W190, aims to eliminate a sidewalk gap along southbound Beach Boulevard in Westminster, Orange County, by constructing a new sidewalk segment within the existing State Route 39 right-of-way at postmiles 7.8 to 8.0. This initiative is designed to ensure pedestrians have a continuous, accessible pathway, improving safety and compliance with ADA standards. Work will involve clearing and grubbing, limited roadway excavation to a depth of four inches confined to the sidewalk footprint, installation of ADA-compliant curb ramps, concrete curb and gutter, utility poles, cabinets, signage, and traffic control systems, as well as hazardous waste remediation in the area between 21st and 23rd Streets. No additional right-of-way is needed, as all activities occur within the current state-owned corridor. The project is funded entirely by state resources and is managed by Caltrans District 12 – Orange. The planned work is forecasted, with the solicitation posted on May 28, 2026, and no set-aside provisions or NAICS code specified. Primary points of contact for environmental and planning inquiries are Danielle O Adili, Environmental Planner, and Smita Deshpande, Senior Environmental Scientist, both reachable through their official Caltrans email addresses and phone numbers. All project details and documentation are accessible via the California CEQA Net portal.

General Info

Construct ADA-compliant sidewalk segment in State Route 39 right-of-way, no new right-of-way needed, Caltrans District 12 manages.

Agency

California → Caltrans, District 12 - Orange

Place of Performance

Westminster, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 12 - Orange
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 12 - Orange
Office AddressN/A
Contacts
Danielle O AdiliEnvironmental Planner
Smita DeshpandeSenior Environmental Scientist

Full Description

Show more
Minor B project 0W190 will close the sidewalk gap on southbound Beach Blvd by installing a new sidewalk on State Route 39 (SR-39) in the City of Westminster, in Orange County. The purpose of the project is to close the sidewalk gap new on southbound of Beach Blvd. This is necessary in order to provide pedestrians with a safe walkway on southbound of Beach Blvd. Project activities include clearing and grubbing, roadway excavation, installing ADA curb ramps, concrete curb and gutter, poles, cabinets, signage, traffic control systems, and hazardous waste cleanup along southbound Beach Blvd between 21st and 23rd Streets. The project is financed with state funds and the proposed work lies within the State right-of-way (ROW) at postmiles (PM) 7.8/8.0. Excavation is estimated to be 4 inches deep and is limited to the sidewalk area. No new ROW is required.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil and utility construction services, including underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, shoring, subsurface investigation, and site clearing. Additional requirements include surface improvements like asphalt paving, traffic signals, and landscaping, along with environmental support services such as storm water pollution prevention (SWPPP) and quality control. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must hold a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Certified DBE, MBE, WBE, or OBE firms must provide certification from an approved agency prior to the bid opening. Quotes will be considered from bidders who can maintain labor harmony on the project. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237310
New
SLED
803_2027 PLANT MIX - PRIMARY
Solicitation # CM827PMA129935
The Virginia Department of Transportation (VDOT) is soliciting bids for contract CM827PMA129935, titled 2027 Plant Mix - Primary, which involves the production and placement of Thin Hot-Mix Asphalt Concrete Overlay (THMACO) and Balanced Mix Design (BMD) surface asphalt concrete across various locations, specifically including Route 42. The scope of work includes the application of tack coat, sinusoidal asphalt rumble strips, and pavement markings, as well as flexible pavement planing. Contractors must be prequalified to bid and are required to submit a Job Mix Formula (JMF) for approval at least two weeks prior to production. Key technical requirements include meeting Performance + Volumetric Optimized criteria for specific mix types and ensuring a minimum film thickness of 9 microns. The contract is subject to several federal and state regulations, including the Davis-Bacon Act, the Buy America Act, and the Build America, Buy America Act (BABA). Contractors must comply with non-discrimination and equal opportunity provisions and are encouraged to partner with Small, Women-owned, and Minority-owned (SWaM) businesses. Administrative requirements include the use of a VDOT-approved inventory tracking system and the submission of performance test results via the PLAID website within 48 hours of sampling. Payment is structured through monthly progress estimates based on the contractor's name, with interest accruing at one percent per month. Liquidated damages for violations of the Contract Work Hours and Safety Standards Act are set at $33 as of January 15, 2025.
Virginia Department of Transportation

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS