Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on January 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

12-inch Ductile Iron Pipeline Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 7 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Eastern Municipal Water District in California is seeking a subcontractor for the installation of 120 linear feet of 12-inch ductile iron water pipeline. The scope of work encompasses all necessary trenching, jointing, testing, and final restoration to ensure the pipeline is fully operational and the site is returned to its original condition. This project falls under NAICS code 237110 and was posted on January 30, 2025. Interested parties must submit their responses by the deadline of March 18, 2025.

General Info

Subcontractor needed for 120ft water pipeline installation in California by March 18, 2025.

Documents

This scope was carved out of 1528W.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

State Street Water Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Eastern Municipal Water District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of 120 linear feet of 12-inch ductile iron water pipeline including trenching, jointing, testing, and restoration.

More opportunities from California → Eastern Municipal Water District

Same awarding agency

NAICS: 541330
SLED
RFP 3956 Wastewater Collections System Closed- Circuit Television Condition Assessment Phase 3
Solicitation # RFP-3965
The Eastern Municipal Water District (EMWD) is soliciting proposals under RFP 3965 to select qualified contractors for the Phase 3 Wastewater Collections System Closed-Circuit Television (CCTV) Condition Assessment. The project involves performing CCTV inspections of approximately 467 miles of sewer pipeline across five service areas in California, including Moreno Valley and Menifee, to verify and validate previous analytical results. The work is structured over five fiscal years, beginning in FY 2026/27 and continuing through FY 2030/31. Phase 3A focuses on 47 miles of truss and old vitrified clay pipes, while Phases 3B through 3E each cover 105 miles of sewer pipe. The approximate agreement start date is February 17, 2027. Award selection is based on best value rather than the lowest price, with evaluation factors focusing on the firm's experience, personnel qualifications, and organizational structure. Contractors must provide a comprehensive work plan including safety protocols, quality control measures, and a Cal/OSHA compliance history. Mandatory requirements include a signed Insurance Affidavit, Department of Industrial Relations (DIR) registration for prevailing wages, Confined Space Entry Training Certification, and a Non-Disclosure Agreement. Additionally, the contract requires both payment and performance bonds. Proposals must be submitted electronically via the EMWD e-Procurement portal by December 11, 2026, with any hard copy, fax, or email submissions resulting in disqualification.
Engineering Services

POSTED

8 days ago

DEADLINE

in 23 days
View Details
NAICS: 237110
SLED
Menifee and Watson Road II Booster Pump Station and Matthews Transmission Pipeline ProjectThe Eastern Municipal Water District is initiating the Menifee and Watson Road II Booster Pump Station and Matthews Transmission Pipeline Project in Menifee, Riverside County. The project scope involves the construction of two new booster pump stations, the Watson Road II BPS and Menifee BPS, which will be housed in a new 12,600-square-foot building on a 1.96-acre vacant parcel west of the Antelope Road and Watson Road intersection. Additionally, the project requires the decommissioning and removal of the existing Romoland BPS located at the intersection of Ethanac Road and Antelope Road. Infrastructure development includes the installation of approximately 1.85 miles of transmission pipeline. Key components consist of a new 36-inch diameter pipeline connecting the facility to the Perris Valley North/South Pressure Zone, a 30-inch diameter transmission main in Watson Road connecting the Watson Road II BPS to the existing Watson BPS, and a 300-foot long, 36-inch steel pipeline connecting the new stations to the Romoland Feeder. The project has undergone environmental review under CEQA, including a Mitigated Negative Declaration, to address potential impacts on special-status species, cultural resources, and noise. Coordination with agencies such as the California Regional Water Quality Control Board and the South Coast Air Quality Management District is required, and compliance with Cal/OSHA standards is mandatory.
Water and Sewer Line and Related Structures Construction

POSTED

6 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS