Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on January 25, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

12441923Q0014 - 081001 BSC-CON-VIC Blanchard Springs Booster Pumps and Control Panel Replacement (Project No. 608466)

Closed
12441923Q0014Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 14 hours ago

DEADLINE

in 20 days

General Info

Contract Value

$107,500

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Russellville, AR, 72801, USA

Set-Aside

SBA

Awardee

TECO, INC

Award Issued Date

Documents

8

ATTACHMENT+1-Blanchard+Spgs+Booster+Pumps+and+Control+Panel.pdf

PDF

ATTACHMENT+2-Schedule+of+Items+%28SOI%29-Pumps+and+Control+Panel.xlsx

XLSX

ATTACHMENT+3-WD+%28DBA%29+AR20230022+%2801-06-23%29.pdf

PDF

ATTACHMENT+4-Relevant+Experience+Questionnaire.doc

DOC

RFQ+12441923Q0014+%28Blanchard+Springs+Booster+Pumps+and+Control+Panel%29-AMEND+0001+%28SAM%29.pdf

PDF

RFQ+12441923Q0014+%28Blanchard+Springs+Booster+Pumps+and+Control+Panel%29-AMEND+0002+%28SAM%29.pdf

PDF

RFQ+12441923Q0014+%28Blanchard+Springs+Booster+Pumps+and+Control+Panel%29-AMEND+0003+%28SAM%29.pdf

PDF

RFQ+12441923Q0014+%28Blanchard+Springs+Booster+Pumps+and+Control+Panel%29.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseClosed
Posted

Presolicitation

Deadline changed

Response deadline changed from Dec 17, 2022 to Jan 17, 2023.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jan 17, 2023 to Jan 25, 2023. The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jan 25, 2023 to Feb 1, 2023. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service-Spoc East
Contacts2 people available
OfficeWashington, DC, 202500001, USA
Office AddressWashington, DC, 202500001, USA

Full Description

Show more
***AMEND 3 - EXTEND QUOTE DUE DATE AND DELIVERY DATE*** **AMEND 2 - INCORPORATE NOTES AND QUESTIONS AND ANSWERS (Q&As) THAT RESULTED FROM THE SITE VISIT, WHICH OCCURRED ON 18 JANUARY 2023 ** * AMEND 1 - INCORPORATE SF-1442 FORM, CHANGE THE PERIOD OF PERFORMANCE AND NUMBER OF DAYS TO COMMENCE WORK * THE REQUEST FOR QUOTE (RFQ) FOR THE SUBJECT PROJECT IS HEREBY ATTACHED, WHICH TAKES PRECEDENCE OVER THE SYNOPSIS, LAST UPDATED ON 5 JANUARY 2023. AS SUCH, BOTH THE PSC CODE AND BUSINESS SIZE STANDARD HAVE BEEN CORRECTED HEREIN. The RFQ is in accordance with the procedures set forth in Parts 13 and 36 of the Federal Acquisition Regulation (FAR). The quote due date and time is 25 January 2023 at 2:00 PM Eastern Time. All submissions must comply with the requirements set forth in the RFQ document along with all applicable attachments (4 total). This project consists of; but is not limited to; contractor shall provide all labor, tools, equipment, and materials to remove and replace existing Grundfos Variable Speed Packaged Pumping System (4-pumps) and Control Panel, demo and dispose of Peabody Pump and controls, associated piping, and appurtenances, to maintain water pressure. This will include demo (and disposal), electrical, plumbing, and controls. Upon completion of installation, testing and training will also be required as well as any and all tasks reflected in the attached Statement of Work/Specification document and/or Drawings. Project duration shall be approximately 180 calendar days from issuance of the Notice to Proceed (NTP). This procurement is set aside 100% for Small Business concerns. The applicable NAICS code is 237110 and the PSC code is Z2NE with a small business size standard of $36.5M. The magnitude of the construction estimated cost range is $25,000.00 - $100,000.00. A Pre-Bid Conference will be held on 18 January 2023 at 10:00 AM Central time at The Blanchard Springs Cavern Visitor Center, 704 Blanchard Rd, Fifty-Six AR, 72533. All interested bidders are strongly urged to attend and shall RSVP no later than COB 17 January 2023. The points of contact are Danny Sims at danny.sims@usda.gov and - Shane Mcclanahan at michael.mcclanahan@usda.gov. Offerors are encouraged to check this website frequently in order to be notified of any changes to the solicitation. All questions and answers resulting from the aforementioned Site Visit will be posted here by COB 19 January 2023. All offerors must be actively registered in the System for Award Management (SAM) database (https://www.sam.gov) at the time of submission of a quote or offer. It is highly encouraged for prospective quoters/offerors to begin the SAM registration process as early as possible. Any questions or concerns regarding this RFQ should be directed to Lashone Wallace at lashone.wallace@usda.gov.

More opportunities from Department Of Agriculture → USDA Forest Service-Spoc East

Same awarding agency

NAICS: 237110
Federal
Oconaluftee Waterline Replacement
Solicitation # 12441926Q0040
Solicitation 12441926Q0040 is a combined synopsis and request for quotation issued by the USDA Forest Service for waterline replacements at the Oconaluftee Job Corps Civilian Conservation Center in Cherokee, North Carolina. This is a total small business set-aside under NAICS code 237110, with a size standard of 19 million dollars. The project involves the replacement of 2 to 4 inch water services, including connections to the water main and building systems, and must be completed between November 6, 2026, and February 5, 2027. The contract will be awarded as a firm-fixed price purchased order based on the lowest priced technically acceptable criteria, evaluating technical requirements, project schedules using the critical path method, and past performance. Offerors must demonstrate at least one year of experience and provide three relevant projects completed within the last five years. The work is subject to the Davis-Bacon Act and requires adherence to ASTM, AASHTO, ICC, and NFPA standards. Key requirements include the provision of performance and payment bonds, strict material storage and marking specifications for HDPE piping, and the maintenance of building egress and water availability during construction. Proposals must be submitted via email to Arthur Courtney by October 30, 2026, at 12:00 PM EST, adhering to specific formatting and page limit requirements. A site visit is scheduled for October 16, 2026, with RSVPs required 72 hours in advance.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS