12600 South Mountain View Corridor Sewer Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The 12600 South Mountain View Corridor Sewer Project, solicitation number 972, is a specialized infrastructure project issued by the Jordan Basin Improvement District in Utah. The scope of work involves the installation of approximately 2,620 linear feet of 30-inch sanitary sewer pipeline and 10 sanitary sewer manholes. A critical component of the project is trenchless construction under the Mountain View Corridor, requiring a 225-foot and an 81-foot guided bore, both utilizing a minimum 42-inch steel casing. Additional requirements include landscaping, roadway restoration, and the installation of Geneva Perfect Manholes. Due to the technical nature of the site, which is characterized by highly collapsible soils and potentially gassy tunnel conditions, bidding is restricted exclusively to contractors prequalified for the Multiple Mountain View Corridor Sewer Projects. The contract will be awarded to the lowest responsible and responsive bidder. Bidders must submit a sealed bid including a bid bond, bid schedule, and a notarized sworn statement of information. Performance and payment bonds are required upon award. The project mandates that calculations for initial support thickness be signed and stamped by a Professional Engineer registered in Utah. Substantial completion of the work is required by June 1, 2027, with final completion and readiness for payment by July 1, 2027. Payment is processed monthly via certified applications, with funds becoming due thirty days after presentation to the Owner's Board of Trustees. Quality control is strictly monitored through various ASTM standards, and testing reports must be submitted within 24 hours of completion.
General Info
Place of Performance
UT, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The Work includes installation of approximately 2,620 linear feet of 30-inch sanitary sewer pipeline, 10 sanitary sewer manholes, 225-foot-long guided bore, 81-foot-long guided bore, both with a 42-inch minimum casing crossing under Mountain View Corridor (UDOT right-of-way), landscaping and roadway restoration, and associated pertinences to construct the new sewer lines in accordance with the Contract Documents.
Similar Contracts
Same NAICS industry code
More opportunities from Utah
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS