This Solicitation opportunity from Illinois was posted on October 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
1269498A: AUBURN GRESHAM CORRIDOR IMPROVEMENTS Section 1: 79th Street, Sangamon
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation 77412, Specification 1269498A, is a construction project issued by the Chicago Department of Transportation for the Auburn Gresham Corridor Improvements, Section 1. The scope of work focuses on infrastructure enhancements at 79th Street, from Sangamon Street to Fielding Avenue, and Halsted Street, from 78th Street to 80th Street. Key deliverables include the installation of combination concrete curb and gutter, Portland cement concrete sidewalks and ADA ramps, pavement removal and patching, and the application of hot-mix and warm-mix asphalt. The project also involves electrical and site work, including the installation of LED signal heads, removal of existing street lighting equipment, and the placement of litter receptacles and temporary chain link fencing. The contract will be awarded to the responsible bidder with the lowest Award Criteria Figure, determined by a canvassing formula that adjusts the base bid based on proposed minority and female employee utilization goals. Bidders must comply with Buy America requirements, prevailing wage rates, the Chicago Minimum Wage Ordinance, and the Illinois Human Rights Act. Required submissions include a 5 percent bid deposit, a notarized Bid Execution Page, and an Economic Disclosure Statement, with all proposals submitted electronically via the iSupplier system. Performance and payment bonds are required at 100 percent of the total base bid upon notification. Technical specifications mandate strict quality control for asphalt and concrete, with final acceptance overseen by the Engineer and the Commissioner. Specific packaging and marking standards are required for poles, split pedestal bases, and sign panels to ensure durability and traceability. Administrative requirements include the weekly submission of certified payrolls and the maintenance of a detailed field diary. Payments are city-funded and processed through the Bureau of Administration and Planning.
General Info
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownSolicitation requirements
57 mandatory57 requirements in 9 areas
- Compliance15 · 15 must014
Binding Terms and Conditions
- Cost & Pricing11 · 11 must036
Electronic Price Schedule
- Submission8 · 8 must001
Proposal Submission Deadline
- 54 more requirements, each with its source quote
Read every requirement with its source and proposal context.
Read all 57 requirementsThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 2 days
- North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1Open now, due in 17 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Organization & Contact Information
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
