Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on March 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

127EAW26Q0003 - Plumas NF Bear Boxes

Awarded
127EAW26Q0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. Managed by Ranger Pipelines Incorporated, the work involves the rehabilitation of covered and open concrete structures, relining and replacement of small and large diameter steel and ductile iron pipes, and the installation of valves and piping appurtenances. The scope further includes the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to electrical and instrumentation systems, replacement of motor control center components, and modifications to sluice and slide gates. Additional tasks include installing platforms for access, rerouting sump pump discharge lines, excavation, trench work, and surveying. The project has an estimated contract value between $18.5 million and $19.5 million, with a bid opening date of December 2, 2026. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). The solicitation specifically seeks certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and electrical work, requiring all participants to comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 6 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

This contract, identified as 127EAW26Q0003, involves the installation or provision of bear boxes within the Plumas National Forest, located near Portola, California. It is a total small business set-aside, meaning only small business entities are eligible to submit proposals. The solicitation was posted on March 11, 2026, and the deadline for quote submission is April 8, 2026, at 1:00 PM Pacific Time. Interested offerors must submit their quotes via email to the designated Contracting Officer, Gregory Cunningham, at the USDA Forest Service office in Albuquerque, New Mexico. No formal site visit will be organized, as the project locations are publicly accessible for independent inspection. Failure to inspect these sites will not be grounds for claims post-award. Any Requests for Information must be submitted using a specific RFI form and sent to the Contracting Officer by March 30, 2026, no later than 1:00 PM Pacific Time; questions submitted after this deadline will not be considered. Offerors are directed to review the "Required Quote Submission Documents" section carefully to ensure complete proposal packages. The contract falls under NAICS code 238990, which typically covers specialty trade contractors, and is managed by the USDA Forest Service's Southwest Region office.

General Info

Small business set-aside for bear box installation in Plumas National Forest, quotes due April 8, 2026.

NAICS

238990 - All Other Specialty Trade Contractors

Place of Performance

Portola, CA, 96122, USA

Set-Aside

SBA

Documents

10
PDF, High priority: read this firstamendment
High
PDF, High priority: read this first8 pages · fire-plan
High
DOCX, High priority: read this first2 pages · rfi
High
DOCX, High priority: read this first1 page · schedule-of-items
High
PDF, High priority: read this first21 pages · rfq
High
PDF, High priority: read this first13 pages · sow
High
PDF, High priority: read this first6 pages · contract-administration
High
PDF, High priority: read this first27 pages · wage-determination
High
PDF, Low priorityrfi
Low
PDF, Low priorityother
Low

Read all 10 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 11 days
  • EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2Open now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Southwest 6 Usda-Fs
Contacts1 person available
OfficeAlbuquerque, NM, 871023498, USA
Office AddressAlbuquerque, NM, 871023498, USA

Full Description

Show more

127EAW26Q0003 - Plumas NF Bear Boxes - A00001: RFI Resposnes


The purpose of this amendment is to post RFI responses.



Attached is "RFI Official Responses" and which are hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive.


///////////////////////////////////////////////////////////////////////////////


127EAW26Q0003 - Plumas NF Bear Boxes



IMPORTANT NOTES:


- Set Aside: Total Small Business Set Aside



- See Section "Required Quote Submission Documents" for the Documents to Submit with Your Proposal



- A FS organized site visit will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the site constitute grounds for a claim after contract award.



- Requests For Information (RFI’s) are required to be submitted on attachment “7. RFI Form” and are due to the Contracting Officer (Sign up to see this detail) via email no later than March 30th, 2026, 1:00 PM Pacific Time. No questions will be accepted after this date and time.



- All quotes shall be emailed to the Contracting Officer (Sign up to see this detail) no later than April 8th, 2026, 1:00 PM Pacific Time.

More opportunities from Department Of Agriculture → Csa Southwest 6 Usda-Fs

Same awarding agency

NAICS: 238210
New
Federal
Forest Service - Solar Batteries Frenchman Work Center
Solicitation # 127EAW27Q0002
Solicitation 127EAW27Q0002 is a Request for Quotation issued by the USDA Forest Service for the Solar Batteries Frenchman Work Center project located in Plumas National Forest, California. The project objective is to disconnect, remove, and recycle 14 failed lithium-ion batteries and install a new 2,100Ah 48V lithium-ion system compatible with existing Outback components. The system must be capable of handling air compressor surges and operating in unconditioned temperatures between 15°F and 100°F. Key deliverables include the installation of the battery system, the setup of local and remote monitoring, and the provision of system training for Forest Service personnel. The period of performance is 30 calendar days from the Notice to Proceed, with work expected to commence within 10 calendar days of that notice. This acquisition is a Total Small Business Set Aside under NAICS code 238210, with a project magnitude estimated between $25,000 and $100,000. Award will be based on best value, prioritizing the highest technically rated offeror provided the price is fair and reasonable and past performance is acceptable or neutral. Contractors must adhere to Davis-Bacon Act wage determinations and provide a 100% performance bond. Administrative requirements include mandatory electronic invoicing via the Invoice Processing Platform (IPP) and the assignment of key personnel, including a Project Manager, Quality Control Manager, and Project Safety Manager. Due to the location, contractors must also comply with specific fire prevention and suppression standards during the Fire Precautionary Period.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

4 days ago

DEADLINE

in 6 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS