Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on July 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

127EAW26Q0042 - Tropical Storm Hilary Road Damage

Closed
127EAW26Q0042Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 12 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 18 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The contract 127EAW26Q0042 is a sealed bid solicitation for road damage repair following Tropical Storm Hilary in Angelus Oaks, California, with a strict Total Small Business Set-Aside under NAICS code 237310, requiring all offerors to self-certify as small businesses meeting the $45 million size standard. Performance is site-specific and must be completed within a mandatory 60-calendar-day window starting 10 days after receipt of the Notice to Proceed, estimated to begin on August 17, 2026. The solicitation mandates comprehensive technical proposals including a detailed CPM or Gantt schedule, Site-Specific Safety Plan, Quality Control Plan, Capability and Subcontracting Plan, and resumes of key personnel, all evaluated under a highest technically rated framework where technical excellence is the primary award criterion, provided price is fair and reasonable and past performance is rated acceptable or neutral. RFI submissions are required by July 16, 2026, using a specified form and emailed to the Contracting Officer, with official responses incorporated into the final award; a mandatory site visit is scheduled for July 7, 2026, led by Transportation Engineer Chris SooHoo at coordinates 34.170611, -116.829511, and RSVPs must be sent to Gregory.Cunningham@usda.gov. All quotes must be submitted electronically by July 23, 2026, via email to the same address, and require an active SAM.gov registration. Contract administration is governed by FAR clauses addressing differing site conditions, inspection standards, accident prevention, and suspension of work, with adherence to AASHTO, ASTM, and CRSI standards, and requires California Class C-12 contractor licensing. Payment is processed exclusively through the Invoice Processing Platform, with no WAWF usage permitted, and the Contracting Officer’s Representative, Chris SooHoo, provides technical oversight. Special requirements include a virtual post-award conference within ten days of award, strict adherence to material certification protocols, return of government-furnished keys, and compliance with executive orders on free speech and equal opportunity, with violations potentially triggering termination for default or False Claims Act liability. Packaging and marking follow civilian standards, with reinforcing steel labeled by bar marks per CRSI guidelines and protected from corrosion during storage and transport, while bar-coding and military standards are not applicable.

General Info

Small business set-aside for road repairs in Angelus Oaks, CA, due to Tropical Storm Hilary, USDA Forest Service, quote due July 23, 2026.

Agency

Department Of Agriculture → Csa Southwest 6 Usda-FsView Agency

Contract Value

$799,030

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Angelus Oaks, CA, 92305, USA

Set-Aside

SBA

Awardee

JEREMY HARRIS CONSTRUCTION, INC.View Profile

Award Issued Date

Documents

(16)

2023 CA FS Tropical Storm Hilary Road 1N17 Special Project Specifications

PDFspecifications

2023 CA FS Tropical Storm Hilary Road 1N17 Plans

PDFroad-plans

Fire Plan for Contract Area

PDFfire-plan

4.3+ERFO+Map.pdf

PDF

2023 CA FS Tropical Storm Hilary Roads Special Project Specifications 1N02 & 1N05

PDFspecifications

Statement of Work for Forest Service Roads Repair - Tropical Storm Hilary

PDFsow

3.1 Road Plans - 1N02 & 1N05 Reconstruction Project

PDFroad-plans

Amendment A00002 to Solicitation 127EAW26Q0042 - RFI Responses

PDFamendment

Davis-Bacon Act Wage Determination CA20260026 May 18, 2026

PDFwage-determination

USDA Contract Administration Information

PDFcontract-administration

Amendment A00001 to Solicitation 127EAW26Q0042 - Site Visit Information

PDFamendment

Schedule of Items for Tropical Storm Hilary Damage Repair Mounatintop San Bernardino

DOCXschedule-of-items

Amendment A00003 to Solicitation 127EAW26Q0042 - RFI Responses

PDFamendment

FP-14 Standard Specifications for Construction of Roads and Bridges

PDFspecifications

127EAW26Q0042 - Tropical Storm Hilary Road Damage Repair RFI

XLSXrfi

Solicitation 127EAW26Q0042 - Tropical Storm Hilary Road Damage Repair

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Southwest 6 Usda-Fs
Contacts1 person available
OfficeAlbuquerque, NM, 871023498, USA
Organization / Agency
Department Of Agriculture → Csa Southwest 6 Usda-Fs
View Agency Profile
Office AddressAlbuquerque, NM, 871023498, USA
Contacts
Greg Cunningham

Full Description

Show more

127EAW26Q0042 - Tropical Storm Hilary Road Damage Repair - A00003: RFI Responses


The purpose of this amendment is to post RFI responses.



Attached are "RFI Official Responses" which are hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive.


/////////////////////////////////////////////////////////////////////////////////////////////////////////


127EAW26Q0042 - Tropical Storm Hilary Road Damage Repair - A00002: RFI Responses


The purpose of this amendment is to post RFI responses.



Attached are "RFI Official Responses" which are hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive.


/////////////////////////////////////////////////////////////////////////////////////////////////////////


127EAW26Q0042 - Tropical Storm Hilary Road Damage Repair - A00001: Site Visit Information


1) The purpose of this amendment is to post the Forest Service led site visit information.  See attached amendment.



      a) Organized Site Visit Details:
          i) Date / Time: Tuesday, July 7th, 2026. 0900 Pacific Time
          ii) Meeting Location: 34.170611, -116.829511. Large turnout across SR-38 from South Fork Campground.



     b) FS personnel leading Site Visit Contact Info
          i) Title: Transportation Engineer
          ii) Name: Chris SooHoo
          iii) Phone #:909-893-0648
          iv) Email: Christopher.soohoo@usda.gov


/////////////////////////////////////////////////////////////////////////////////////////////////////////


127EAW26Q0042 - Tropical Storm Hilary Road Damage Repair



Set Aside: Total Small Business Set Aside



IMPORTANT NOTES:
- See Section "Required Quote Submission Documents" for the Documents to Submit with Your Proposal - An organized site visit will be held. Information will be forthcoming via solicitation amendment.
PLEASE RSVP TO THE SITE VISIT BY EMAILING: GREGORY.CUNNINGHAM@USDA.GOV



- Requests For Information (RFI’s) are required to be submitted on attachment “8. RFI Form” and are due to the Contracting Officer (Gregory.Cunningham@usda.gov) via email no later than July 16th, 2026, 10:00 AM Pacific Time. No questions will be accepted after this date and time.



- All quotes shall be emailed to the Contracting Officer (Gregory.Cunningham@usda.gov) no later than July 23rd, 2026, 10:00 AM Pacific Time.

More opportunities from Department Of Agriculture → Csa Southwest 6 Usda-Fs

Same awarding agency

NAICS: 236220
Federal
GAOA Red Rock Lookout Renovation, Plumas National Forest
Solicitation # 127EAW26Q0028
Solicitation 127EAW26Q0028 is a total small business set-aside for the Red Rock Lookout Renovation on the Plumas National Forest in Quincy, California. Managed by the USDA Forest Service, the project focuses on deferred maintenance upgrades, including roofing, a lightning protection system, off-grid solar infrastructure, utility piping, and both interior and exterior finishes. The scope also encompasses lead paint remediation, demolition, and the installation of new doors, hardware, and casework. The contract is governed by FAR Part 12 and requires the contractor to provide all necessary personnel, equipment, and supervision to complete the work within a mandatory performance period of 150 calendar days. The award is based on the best value to the government, evaluated through a comparative methodology focusing on technical approach, project management, specialized experience, and past performance. Bidders must be registered in SAM.gov and adhere to NAICS code 236220. Key requirements include the submission of a bid guarantee of 20 percent for quotes exceeding 150,000 dollars, compliance with Davis-Bacon Act prevailing wage rates, and adherence to the 2010 ADA Standards for Accessible Design. Performance is expected to occur between October 2026 and March 2027, with all invoicing processed electronically via the Department of Treasury's Invoice Processing Platform.
Commercial and Institutional Building Construction

POSTED

16 days ago

DEADLINE

in 25 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS