Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on March 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

127EAW26R0001 - Brush Creek Work Center Construction

Awarded
Federal
Submission Closed
Solicitation #
127EAW26R0001

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 involves the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project requires site improvements such as paving, drainage upgrades, and hazardous materials abatement. The estimated contract value is between $10 million and $25 million, with a completion period of 730 days. The contract is a fixed-price award based on the lowest price, with pricing required for building renovation and paving replacement. Proposals are due by December 2, 2026. Bonding requirements vary by proposal value, with those $150,000 or greater requiring bid, payment, and performance bonds. Key personnel requirements specify that the Quality Control Manager must be a stand-alone position, though the Superintendent and Site Safety and Health Officer roles may be combined. The project must adhere to ADA accessibility standards, Buy American requirements, and specific cybersecurity protocols for facility-related control systems. Invoicing is managed through Wide Area WorkFlow (WAWF) using standard NAVFAC forms.
Bristol Alliance of Companies

POSTED

30 minutes ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
This Design-Build contract, designated as an 8(a) Multiple Award Construction Contract, focuses on repairing fire sprinkler deficiencies at Building 290 and the adjoining covered loading dock platform, Building 719, at the Puget Sound Naval Shipyard in Bremerton, Washington. The contractor is responsible for producing final design documentation per FC 1-300-09N Navy and Marine Corps Design Procedures and providing all necessary construction materials and labor. Key technical objectives include resolving a Risk Assessment Code Level 4 (RAC-4) deficiency by extending sprinklers to the loading dock platform, ensuring elevator pit sprinkler control valves are locked in the open position and monitored by the fire alarm system, and installing missing backflow preventers on the north and south 6-inch diameter wet pipe sprinkler system risers in the basement. The project is a Firm Fixed-Price effort with an estimated magnitude between $1 million and $5 million and a period of performance of 440 days from the date of award. Evaluation is based on price and MACC past performance, with a single CLIN (0001) covering all labor, materials, and equipment. The scope is governed by Unified Facilities Guide Specifications and requires strict adherence to safety and security protocols, including cybersecurity standards for facility-related control systems and restrictions on the use of personal electronic devices near classified information. Proposals are submitted via the PIEE portal, with the final deadline extended to December 16, 2026.
Bristol Alliance of Companies

POSTED

30 minutes ago

DEADLINE

in 6 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a design-build project for the renovation and modernization of Facility #6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. The project is estimated between $10 million and $25 million and is structured as a firm-fixed-price contract. The scope involves a critical two-phase execution to ensure the facility remains operational and mission-capable throughout the process. Phase 1 encompasses all initial design and construction work, while Phase 2 focuses on the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. Key requirements include the provision of all construction documents during Phase 1, compliance with NAVFAC, UFC, and cybersecurity standards, and the implementation of multiple mobilization and demobilization cycles. The project requires strict adherence to security protocols and technical standards, including the installation of new panel boards with surge protection and the construction of a 400 sq ft forklift battery charging facility. Evaluation is based on price and MACC past performance. Proposals must be submitted via the PIEE portal by December 7, 2026, at 11:00 am local time. The contractor must comply with various FAR and DFARS clauses, including Davis-Bacon Act regulations, CMMC Level 1 requirements, and the Buy American Act. No set-aside status is specified for this solicitation.
Bristol Alliance of Companies

POSTED

30 minutes ago

DEADLINE

in 8 days
NAICS: 236220
New
Federal
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
Solicitation 26-141 is for the removal and replacement of damaged fire-rated doors and frames at the Atterbury Job Corps Center cafeteria in Indiana. The project requires the installation of new fire-rated doors while reusing existing closure systems and push bars. All work must comply with local, state, and federal building codes, as well as EPA and OSHA regulations, with Indiana regulations taking precedence if they are more stringent. The contract is a small business set-aside, open to SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Prospective bidders must attend a mandatory site visit on December 1, 2026, and submit a single lump sum proposal with a detailed cost breakdown by December 11, 2026. Award selection is based on best value, evaluated through a 100-point system covering price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Required documentation includes a valid Indiana Contractor's License, Davis-Bacon Act wage rate certification, a 90-day bid guarantee, and proof of insurance naming Adams and Associates, Inc. as an additional insured. Once accepted, the contractor must start work within 14 days and provide a sequenced construction schedule within 10 days of the Notice to Proceed. Payment terms are Net 30, and a one-year guarantee of workmanship is required upon substantial completion.
Atterbury Job Corps – Adams & Associates

POSTED

36 minutes ago

DEADLINE

in 14 days

AI Contract Overview

Show more

This contract, identified as 127EAW26R0001, involves the construction of the Brush Creek Work Center located in Berry Creek, California, under the Department of Agriculture’s Forest Service Southwest office. The project is a total small business set-aside with an estimated value exceeding $10 million and falls under NAICS code 236220, which covers commercial and institutional building construction. The solicitation was posted on January 27, 2026, with proposals due by March 26, 2026. Prospective contractors must submit all required documents as outlined in Section L, paragraph L.3 of the solicitation. An organized site visit is scheduled for February 18, 2026, with attendance requiring an RSVP to the contracting officer, Greg Cunningham, who also serves as the primary point of contact for all Requests for Information, which must be submitted by February 27, 2026. The construction scope includes comprehensive tasks typical to large-scale building projects such as mobilization, excavation, soil erosion control, asphalt removal, and pavement marking, with quantities provided as estimates subject to field verification. Contractors must submit bids encompassing all listed items, with a bid bond required for proposals over $150,000. The contract emphasizes contractor accountability for protecting existing facilities, managing waste disposal, and providing employee amenities throughout the project. A performance period consistent with similar USDA construction projects is anticipated, with detailed deliverable schedules, including project plans, submittals, warranties, and status reports. The solicitation encourages thorough site inspection, clarifying that failure to inspect will not be grounds for claims post-award. Overall, this contract represents a significant opportunity aimed exclusively at small businesses, requiring careful attention to proposal documentation and adherence to the project timelines and specifications detailed in associated statements of work and schedules of items.

General Info

Construction of Brush Creek Work Center, CA; small business set-aside; bids due March 26, 2026.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Berry Creek, CA, 95916, USA

Set-Aside

SBA

Documents

22
PDF, High priority: read this first22 pages · ifb
High
PDF, High priority: read this first22 pages · ifb
High
DOCX, High priority: read this first2 pages · rfi
High
PDF, High priority: read this first16 pages · rfi
High
PDF, High priority: read this firstrfi
High
PDF, High priority: read this firstrfi
High
PDF, High priority: read this first1 page · amendment
High
PDF, High priority: read this first8 pages · amendment
High
PDF, High priority: read this first2 pages · amendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this first839 pages · specifications
High
PDF, High priority: read this first44 pages · wage-determination
High
PDF, High priority: read this first8 pages · sow
High
DOCX, High priority: read this first2 pages · schedule-of-items
High
DOCX, High priority: read this first2 pages · schedule-of-items
High
DOCX, High priority: read this firstschedule-of-items
High
PDF, High priority: read this first6 pages · sow
High
PDF, High priority: read this first237 pages · sow
High
ZIP
ZIP

Read all 22 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 21 days
  • Building 262 Renovations FLETC GlyncoOpen now, due in 6 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

6 updates
PhaseAwarded
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Mar 26, 2026 to Apr 2, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Southwest 6 Usda-Fs
Contacts1 person available
OfficeAlbuquerque, NM, 871023498, USA
Office AddressAlbuquerque, NM, 871023498, USA

Full Description

Show more

127EAW26R0001 - Brush Creek Work Center - A00006: Proposal Due Date


The purpose of this amendment is to confirm proposal due date / time.  Amendment A00005 erroneously had block 11 "is extended" checked when the proposal due date was not extended.


Proposal due date and time remains April 2nd, 2026 at 1:00 PM Pacific Time.


////////////////////////////////////////////////////////////////////////////////////////////////


127EAW26R0001 - Brush Creek Work Center - A00005: RFI Responses 3 & SOI


The purpose of this amendment is to post RFI responses, and other applicable documentation. 


////////////////////////////////////////////////////////////////////////////////////////////////


127EAW26R0001 - Brush Creek Work Center - A00004: Time Extension and RFI Responses


The purpose of this amendment is to extend the proposal due date, post RFI responses, and other applicable documentation. 


////////////////////////////////////////////////////////////////////////////////////////////////


127EAW26R0001 - Brush Creek Work Center - A00003: Time Extension and RFI Responses


The purpose of this amendment is to extend the proposal due date, post RFI responses, and other applicable documentation. 


////////////////////////////////////////////////////////////////////////////////////////////////


127EAW26R0001 - Brush Creek Work Center - A00002: Site Visit Roster


The purpose of this amendment is to post the sign in sheet from the Forest Service led site visit held on 25 February 2026.


////////////////////////////////////////////////////////////////////////////////////////////////


127EAW26R0001 - Brush Creek Work Center - A00001: Site Visit Reschedule


This purpose of this amendment is to cancel and reschedule the current site visit due to inclement weather, and extend RFI submission due date.


Forest Serivce led site visit on 18 Feb 2026 is hereby canceled.  Site visit is rescheduled for 25 Feb 2026 at 12:00 PM PST. 


RFI due date is hereby extended to 6 March 2026 at 1:00 PM PST. 


////////////////////////////////////////////////////////////////////////////////////////////////


127EAW26R0001 - Brush Creek Work Center



Disclosure of Magnitude of the Construction Project: More than $10,000,000
Set Aside: Total Small Business Set Aside



IMPORTANT NOTES:
See Section L, Paragraph L.3 for the Documents to Submit with Your Proposal



All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, February 27th, 2026.



An organized site visit will be held on Wednesday Feb 18th, 2026, 1:00 PM PST. See page attachment "1. Statement of Work" for full details. In no event shall failure to inspect the site constitute grounds for a claim after contract award.



PLEASE RSVP TO THE SITE VISIT BY EMAILING: Sign up to see this detail

More opportunities from Department Of Agriculture → Csa Southwest 6 Usda-Fs

Same awarding agency

NAICS: 238210
Federal
Forest Service - Solar Batteries Frenchman Work Center
Solicitation # 127EAW27Q0002
Solicitation 127EAW27Q0002 is a Request for Quotation issued by the USDA Forest Service for the Solar Batteries Frenchman Work Center project located in Plumas National Forest, California. The project involves the removal and recycling of 14 failed lithium-ion batteries and the installation of a new 2,100Ah 48V lithium-ion system compatible with existing Outback equipment. The system must be capable of handling air compressor surges and operating in unconditioned temperatures between 15°F and 100°F. Key deliverables include the installation of the battery system, the setup of local and remote monitoring, and the provision of system training for Forest Service personnel. The project is estimated to have a magnitude between $25,000 and $100,000, with a performance period of 30 calendar days from the Notice to Proceed. This acquisition is a Total Small Business Set Aside under NAICS code 238210. Award will be based on best value, prioritizing the highest technically rated offeror provided the price is fair and reasonable and past performance is acceptable or neutral. Contractors must provide a work plan not exceeding five pages and a list of three similar projects completed within the last three years. Mandatory requirements include compliance with the Davis-Bacon Act, a 100% performance bond, and the submission of all invoices via the Invoice Processing Platform. Due to the location, contractors must adhere to strict fire prevention and suppression standards during the Fire Precautionary Period.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

10 days ago

DEADLINE

in about 16 hours
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS