This Solicitation opportunity from Department Of Agriculture was posted on August 1, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

127EAX24R0001 - WILLOW CREEK HABITAT RESTORATION

Closed
127EAX24R0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Three Lakes G111 Replacement
Solicitation # FWC 26/27-10C
The Florida Fish and Wildlife Conservation Commission is soliciting competitive lump-sum pricing for the Three Lakes G111 Replacement project in Osceola County, Florida. The scope of work involves replacing an existing five-barrel CMP culvert structure and control gates with a new cast-in-place five-barrel reinforced concrete box culvert structure. Key deliverables include the installation of reinforced concrete headwalls and rip-rap blankets both upstream and downstream, as well as the implementation of a temporary steel sheetpile cofferdam and dewatering system to facilitate construction in dry conditions. The estimated budget for this project is 3.5 million dollars. Bidders must be registered in the MyFloridaMarketPlace and SunBiz systems and submit sealed bids by October 13, 2026, at 4:00 PM ET. Requirements for the award include a bid bond of at least five percent for bids exceeding 100,000 dollars, and the successful contractor must provide 100 percent performance and labor and material payment bonds. Additionally, contractors must hold a current State Contractor license, provide a Unique Entity Identifier, and ensure compliance with the Build America, Buy America provision and Chapter 255 of the Florida Statutes. Work is generally restricted to weekdays between 7:00 AM and 7:00 PM, and final completion is defined as 30 days after the issuance of a Certificate of Substantial Completion.
Florida Fish and Wildlife Conservation Commission

POSTED

about 2 hours ago

DEADLINE

in 3 days
NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 7 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 7 hours ago

DEADLINE

in about 23 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 7 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 12 hours ago

DEADLINE

N/A
NAICS: 237990
New
SLED
Coloma Canal Tide Gate System
Solicitation # 04.01.026
The City of Sausalito is soliciting bids for the Coloma Canal Tide Gate System project, identified as solicitation 04.01.026. The scope of work involves the installation of a concrete tide gate structure and the installation of tide gates, including clearing and grubbing the canal and providing structural concrete and reinforcement. The project requires the use of 4,000 PSI concrete and epoxy-coated reinforcement steel. The selected contractor is responsible for inspecting, picking up, and delivering the tide gates from the City's Corporation Yard to the jobsite. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price. The project must be completed within 84 calendar days from the date of the Notice to Proceed. Bidders must submit sealed bids by 10:00 AM on October 30, 2026, to the Office of the City Clerk in Sausalito, California. Required submissions include bid forms, a noncollusion declaration, proof of DIR registration, workers' compensation certification, and CARB compliance certificates. Financial security requirements include a bid bond of at least 10% of the total bid price, with the successful awardee providing performance and payment bonds for 100% of the construction price. The City will withhold 5% of each progress payment as retention. Compliance with Marin County prevailing wage rates and ADA regulations is mandatory.
City of Sausalito

POSTED

about 12 hours ago

DEADLINE

in 10 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Reserve, NM, 87830, USA

Set-Aside

SBA

Documents

18

127EAX24R0001 Amendment III - Willow Creek Habitat Restoration

PDF, High priority: read this first4 pages · amendment
High

127EAX24R0001 Amendment I - Willow Creek Habitat Restoration

PDF, High priority: read this first3 pages · amendment
High

127EAX24R0001 Willow Creek Habitat Restoration

PDF, High priority: read this firstrfp
High

A2+ FR 28 Willow Creek Emergency Stabilization

DOCX, High priority: read this first13 pages · sow
High

Amendment II - RFI Response and Handouts

DOCX, High priority: read this first1 page · amendment
High

Drawing A - Rock Clusters and Toe Rock

PDF, High priority: read this firstspecifications
High

Drawing C - Cross Vane Weir and J-Hook Vane

PDF, High priority: read this firstspecifications
High

General Decision Number NM20230010 - New Mexico Wage Determination

DOCX, High priority: read this first5 pages · wage-determination
High

Gila National Forest Industrial Fire Precaution Guidelines 2023

DOCX, High priority: read this first5 pages · specifications
High

Vertical Bundles and Willow Plantings Conceptual Drawings

PDF, High priority: read this firstspecifications
High

Willow Creek Restoration Project Map

PDF, High priority: read this first1 page · specifications
High

Willow Creek Restoration Project - Upstream of Private Reach SOW

DOCX, High priority: read this first4 pages · sow
High

Willow Creek Watershed-Based Plan - Appendix C Detail Drawings

PDF, High priority: read this firstspecifications
High

Willow Creek Watershed Plan - Recommended Measures and Locations

PDF, High priority: read this firstspecifications
High

127EAX24R0001 Willow Creek Habitat Restoration Notice of Award

PDF, Low priority1 page · award
Low

Site Visit Attendees - 12/12/2023

DOCX, Low priority1 page · other
Low

A2+-Source+Rock.JPG

JPG

A2+-Wilderness+boundary+picture.PNG

PNG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

8 updates
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jan 9, 2024 to Jan 18, 2024.

Deadline changed

Response deadline changed from Jan 18, 2024 to Jan 9, 2024.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jan 9, 2024 to Jan 18, 2024.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Region 3 Southwestern Regional Office
Contacts2 people available
OfficeALBUQUERQUE, NM, 87102, USA
Office AddressALBUQUERQUE, NM, 87102, USA
Contacts
Michelle Bahr
Michael E. Carico

Full Description

Show more
127EAX24R0001 - Willow Creek Habitat Restoration Description of Work: Construction The intent of this contract is to secure services to complete final design and construct aquatic habitat restoration structures to restore the natural stream morphology of a reach of Willow Creek. High burn severity within Willow Creek's watershed (from the 2012 Whitewater-Baldy fire) departed the hydrograph from natural conditions immediately following the fire and for several years afterwards. Loss of ground cover, loss of riparian vegetation, and temporary hydrophobicity in soils resulted in increased flows, which negatively altered the channel's geometry, causing aquatic habitat to decline for the listed Gila trout. Proposed treatments to improve aquatic habitat and stabilize the stream channel include construction of rock clusters, J-hook vanes, cross vane weirs, bank sloping, willow bundle installations, brush revetment installations, and native seeding. Completion expected prior to 9/30/2024. Design Final design for this project is required for the work prior to implementation. This includes an estimate of materials required, exact locations of erosion control structures, and engineering designs for these structures. Location: The project is located on the Gila National Forest, Reserve Ranger District. To reach Willow Creek: From Reserve, NM take State Highway 435 going south for 6.5 miles until you reach FSR 141. Follow FSR 141 for approximately 30 miles going east until you reach FSR 28. Follow FSR 28 going south for approximately 15 miles to reach County Road 073. Follow County Road 073 for approximately 3.5 miles until the end of the road. The project area is about .10 miles long from where County Road 073 ends to the wilderness boundary. Under normal conditions the project area is accessible with a 2-wheel drive vehicle. It shall be the responsibility of the contractor to determine the most suitable route to the project area. All of the transportation of equipment, personnel, and supplies will also be the responsibility of the contractor. Basis for Award: The Government Anticipates awarding a Firm Fixed-Price Contract using RFP Best Value-Tradeoffs: Award will be made to the offer that meets or exceeds the requirements contained herein. This process permits tradeoffs among price and non-price technical factors and allows the Government to accept other than the lowest priced quote. The government will evaluate quotes based on the technical evaluation factors specified in this solicitation. The evaluation factors other than cost or price, when combined, are more important than cost or price. The Price reasonableness will be determined by using competitive solicitation process. Site Visit has been scheduled: Date: December 12, 2023 Time: 1:00 pm MT Location: Meet in the parking lot next to the public restroom by the 2 cabins and a set of corrals. Directions: To reach Willow Creek: From Reserve, NM take State Highway 435 going south for 6.5 miles until you reach FSR 141. Follow FSR 141 for approximately 30 miles going east until you reach FSR 28. Follow FSR 28 going south for approximately 15 miles to reach County Road 073. Follow County Road 073 for approximately 3.5 miles until the end of the road. The project area is about .10 miles long from where County Road 073 ends to the wilderness boundary. Contact: Contracting Officer Representative (COR): Harley Allsup - harley.allsup@usda.gov or 575-388-8261 General Technical Manager (GTM) Carolyn Koury - carolyn.koury@usda.gov or 575-388-8378 This project is a 100% Small Business Set-Aside. NAICS CODE 237990 45M Magnitude of project is between $100,000 and $250,000. Davis-Bacon wages apply. Payment and Performance bonds are required. Send questions to: michelle.l.bahr@usda.gov no later than December 15, 2023, at 1:00 pm MT. In order to be eligible for award of a Federal Contract, potential vendors need to be registered in the System for Award Management (SAM) www.sam.gov at the time of offer submission. Offer Submissions: Offerors shall submit the Return Packet - including a Business Proposal and a Technical Proposal. The required information SF1442, Section B and K (business proposal) and Section M (technical proposal) of the solicitation. Offers or responses to the solicitation (include the solicitation number in the name of the document - 127EAX24R0001 may be sent to the Contracting officer by email: michelle.l.bahr@usda.gov before the deadline. The Deadline for receipt of responses to the RFP shall be January 9, 2024 @ 1:00 pm MT. No Further information is available at this time. The complete solicitation package will be attached and made available only through SAM.gov, https://sam.gov/content/home on or within 15 days of this notice (November 30, 2023). Anyone wishing to participate in this proposed procurement must obtain their copy from SAM.gov. Copies will not be mailed from the Contracting Office. All amendments will be posted on SAM.gov.

More opportunities from Department Of Agriculture → Region 3 Southwestern Regional Office

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS