Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements

Closed
W912HN24B5004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237990
New
International
CT4692 Programme Support Works Framework
Solicitation # CT4692
The East West Railway Company is procuring a multi-lot Programme Support Works Framework (CT4692) to deliver enabling, survey, and early-stage works necessary to prepare the route for main construction. The framework is designed to accelerate programme readiness and reduce delivery risk through six specialized lots: Lot 0 for a single Principal Contractor/Integrator to manage site safety and coordination; Lot 1 for historic environment and archaeological works; Lot 2 for ground investigation and monitoring; Lot 3 for environmental and ecological surveys; Lot 4 for environmental and ecological mitigation; and Lot 5 for enabling works. The estimated total value is up to 450 million pounds excluding VAT, though this figure is indicative and not a committed spend. The contract is structured with a four-year core term starting February 1, 2028, and optional extensions of two, one, and one year, totaling a potential eight-year duration ending January 31, 2036. Awards will be made using a competitive flexible procedure, with multiple suppliers appointed to most lots to encourage SME and Tier 2/3 participation, except for Lot 0. Evaluation is based on a 30 percent weighting for commercial price, with specific adjustments for social value and technical quality for SMEs. To maintain independence and avoid conflicts of interest, strict award restrictions and ethical wall agreements are implemented to prevent the excessive concentration of services within a single organization.
East West Rail Company Limited

POSTED

about 5 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

GA

Set-Aside

SBA

Documents

5

W912H24B5004 - Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements

PDF, High priority: read this firstifb
High

SHEP 144 Dike Raising and Weir Improvements Sign-in Sheet - 26 June 2024

PDF, Low priorityother
Low

SHEP 14A Dike Raising and Weir Improvements Site Visit Sign-in Sheet

PDF, Low priorityother
Low

SHEP 14A Dike Raising and Weir Improvements Site Visit Sign-in Sheet

PDF, Low priorityother
Low

W912HN24B5000 Abstract of Offers - Sewnah Harbor Expansion Project

PDF, Low priorityaward
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

9 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Jul 17, 2024 to Jul 24, 2024. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 24, 2024 to Jul 25, 2024. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Savannah
Contacts2 people available
OfficeSAVANNAH, GA, 31401-3604, USA
Office AddressSAVANNAH, GA, 31401-3604, USA

Full Description

Show more
The abstract is posted as of 31 July 2024. Amendment 4 amends the specifications and extends the date bids are due from 24 July 2024 at 12:00 pm to 25 July 2024 at 1200 pm. Amendment 3 amends specifications and drawings. Amendment 0002 extends the date bids are due from 17 July 2024 at 12:00 pm to 24 July 2024 at 12:00 pm. Amendment 0001 to include a site visit on 20 June 2024 at 10:00 am. Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements - The existing back dike currently spans a length of approximately 11,000 feet and has a crest elevation ranging from about 27 to 29 feet mean lower low water (MLLW). The back dike will be raised to a uniform elevation of 33 feet MLLW. The existing front dike currently spans a length of approximately 6,400 feet and has a crest elevation ranging from about 25 to 27 feet MLLW. The front dike will be raised to a uniform elevation of 31 feet MLLW to gain additional capacity for containment of Savannah Harbor dredged material. Approximately 231,000 cubic yards of borrow material from the adjacent 14B DMCA will be required for the raising of the back dike and approximately 65,000 cubic yards for the front dike. Additional borrow materials from the adjacent 14B DMCA may be needed. Weir modifications for weirs 14A1, 14A2, and 14A3 are anticipated, as well as resetting the abutment on cross-dike weir 14A/B. The borrow material consists of dredge materials from the Savannah River. The dike construction will be performed to the inside of the existing dike crest and slope. Additional project requirements include clearing, grassing, and erosion control provisions.

More opportunities from Department Of Defense → W074 Endist Savannah

Same awarding agency

NAICS: 236220
New
Federal
Market Intelligence Notice – Child Development Centers (CDC) - Volumetric modular housing, Kit-of-Parts facilities, 3-D Printed
Solicitation # W912HN26MICDC
The U.S. Army Corps of Engineers, Savannah District, is conducting a market intelligence effort to identify industry capabilities for the construction of permanent Child Development Centers (CDC) across multiple military installations. The government is specifically seeking information on modern industrialized construction methods, including volumetric modular housing, Kit-of-Parts facilities, 3-D printing, and hybrid solutions, to improve project schedules, costs, and lifecycle outcomes. All facilities must comply with Department of Defense Unified Facilities Criteria 1-200-01. Forecasted projects include several facilities at Fort Bragg, North Carolina, ranging from a 26,900 square foot center for older children to large centers up to 54,000 square feet, as well as a 41,000 square foot facility at Robins Air Force Base, Georgia. These centers will require comprehensive supporting infrastructure, including outdoor play areas with safety surfacing, commercial kitchens, administrative spaces, and advanced security and energy monitoring systems. This request for information is for planning purposes and does not constitute a formal solicitation. Interested parties must submit a capability statement in PDF format and complete an online survey by November 20, 2026. The government is requesting detailed information on corporate experience, commercial best practices, supply chain logistics for long-lead items, and the ability to integrate complex structural and utility designs across different construction types.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 22 days
View Details
NAICS: 236220
New
Federal
Market Intelligence: JDWC Progressive Design-Build OTA
Solicitation # W912HN27SA001
The U.S. Army Corps of Engineers Savannah District is seeking market intelligence for the design and construction of the Joint Deployment Warfighting Complex (JDWC) at Fort Bragg, North Carolina. This project will be executed using a Progressive Design-Build delivery method under 10 U.S.C. 2808a Other Transaction authority, with an estimated construction budget of 350 million dollars. The scope involves creating a high-security facility for approximately 750 personnel, featuring secure administrative areas, an operations center, a network operations center, and Sensitive Compartmented Information Facility spaces meeting ICD 705 requirements with RF shielding. Critical infrastructure requirements include advanced wired and wireless networks and fully redundant electrical and mechanical systems capable of providing 14 days of backup power generation. Additionally, the project includes major civil site modifications, such as secure vehicle parking, an antenna pad, and a 0.65-mile extension of the All-American Parkway. The acquisition strategy will utilize a streamlined two-step Qualifications-Based Selection process, beginning with the submission of white papers to shortlist up to three firms, followed by pitch meetings to select the most qualified design-builder. This current notice is for informational and planning purposes only and is not a formal Request for Proposal. Interested parties must submit a capability statement of no more than five pages detailing their bonding capacity and experience with Progressive Design-Build and secure SCIF construction. Electronic submissions in PDF format are due by October 29, 2026, at 4:00 PM Eastern Standard Time to the designated points of contact.
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in about 4 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS