Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Market Intelligence Notice – Child Development Centers (CDC) - Volumetric modular housing, Kit-of-Parts facilities, 3-D Printed

Active
W912HN26MICDCFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Savannah District, is conducting a market intelligence effort to identify industry capabilities for the construction of permanent Child Development Centers (CDC) across multiple military installations. The government is specifically seeking information on modern industrialized construction methods, including volumetric modular housing, Kit-of-Parts facilities, 3-D printing, and hybrid solutions, to improve project schedules, costs, and lifecycle outcomes. All facilities must comply with Department of Defense Unified Facilities Criteria 1-200-01. Forecasted projects include several facilities at Fort Bragg, North Carolina, ranging from a 26,900 square foot center for older children to large centers up to 54,000 square feet, as well as a 41,000 square foot facility at Robins Air Force Base, Georgia. These centers will require comprehensive supporting infrastructure, including outdoor play areas with safety surfacing, commercial kitchens, administrative spaces, and advanced security and energy monitoring systems. This request for information is for planning purposes and does not constitute a formal solicitation. Interested parties must submit a capability statement in PDF format and complete an online survey by November 20, 2026. The government is requesting detailed information on corporate experience, commercial best practices, supply chain logistics for long-lead items, and the ability to integrate complex structural and utility designs across different construction types.

General Info

US Army Corps of Engineers seeking industry capabilities for modular Child Development Centers.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Savannah, GA, USA

Set-Aside

NONE

Documents

1

Market Intelligence Notice - Child Development Centers (CDC)

DOCX, High priority: read this firstrfi
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Savannah
Contacts2 people available
OfficeSAVANNAH, GA, 31401-3604, USA
Office AddressSAVANNAH, GA, 31401-3604, USA

Full Description

Show more

Market Intelligence Notice – Child Development Centers (CDC) - Volumetric modular housing, Kit-of-Parts facilities, 3-D Printed


Disclaimer: This RFI is issued solely for information and planning purposes. It does not constitute a solicitation or a commitment to issue a solicitation in the future. The Government will not pay for any information or administrative costs incurred in response to this RFI.


1.0 Objective


The U.S. Army Corps of Engineers (USACE), Savannah District (SAS) is seeking market intelligence to identify and assess industry capabilities relevant to Volumetric modular housing, Kit-of-Parts facilities, 3-D Printed and hybrid industrialized construction solutions for child development centers located on multiple military installations. The Government is pursuing modern industrialized construction approaches intended to improve schedule, cost, and lifecycle outcomes for this facility type.


For purposes of this RFI, respondents should clearly identify whether they view these features as:


  • Fully compatible with their standard commercial or industrialized building system;
  • Achievable with modifications; or
  • Better addressed through an alternative technical solution that provides equal or better performance.

Where respondents recommend alternatives, the response should explain how the proposed approach would satisfy or improve upon the Government's desired performance outcomes for schedule; cost; capacity/readiness; child safety and program functionality; quality and durability; energy consumption; repeatability/scalability; site and installation impact; and compliance/turnover.


Information provided by respondents will be used to help the Government understand available market participants, solution types, and industry interest, and will inform future industry engagements, acquisition planning, and assessment of potential use of 10 U.S.C. § 2808a, Facility Construction or Repair: Transactions Other Than Contracts and Grants.


2.0 Forecasted Project(s) Overview


The following projects are currently projected for potential industrialized construction applications.  The work will be performed on multiple military installations.  Solutions may be scaled for additional facilities identified later.


Child Development Center – All facilities will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01, General Building Requirements.


Fort Bragg North Carolina


REQUIREMENT


A. Construct  a 26,9000 SF standard design child development center (CDC) with outdoor playground for children ages 6-10 years. The facility will include a computer lab, homework center, activity rooms, demonstration teaching kitchen, and a multi-purpose room for fitness and sports, a controlled entry area, administrative area, training space, staff lounge work room, kitchen, laundry, storage, supply rooms, information systems, fire protection and alarm systems, Intrusion Detection System (IDS) installation, and Energy Monitoring Control Systems (EMCS) connection. In addition, the outdoor play area will include age-appropriate child development equipment, safety surfacing and fencing. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Heating and air conditioning will be provided by a self-contained system.


B. Construct a 31,906 SF medium standard design child development center with adjacent outdoor playground for children between the ages 6 weeks - 5 years of age.  The facility will include developmental learning modules, activity areas, an isolation room, changing areas, patron visitor waiting area, administrative support space, staff lounge work room, kitchen, laundry, storage, supply rooms, information systems, fire protection and alarm systems, Intrusion Detection System (IDS) installation, and Energy Monitoring Control Systems (EMCS) connection. In addition, the facility will include an outdoor play area with age-appropriate child development equipment, safety surfacing and fencing. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Work will include installation of video monitoring, alarm and intercom systems for safety. Heating and air conditioning will be provided by a self-contained system.


Demolish 1 building at Fort Bragg, NC (21,476 Total SF).


C. Construct a 54,000 SF large standard design Child Development Center for children six weeks to five years of age with adjacent outdoor play areas for children and supporting facilities at Fort Bragg, North Carolina. The Child Development Center facility includes developmental learning modules, activity areas, an isolation room, changing areas, patron visitor waiting area, administrative support space, staff lounge, work rooms, commercial kitchen, laundry storage, supply room, information systems, fire protection and alarm systems, Electronic Security Systems (ESS),


Fire and Life Safety (FLS) systems, and Utility Monitoring and Control Systems (UMCS) connection. Additionally, the facility includes outdoor play areas with age-appropriate child development equipment, safety surfacing, and fencing.  Sustainability and energy enhancement measures are included.


D. Construct a 43,043 SF large standard design Child Development Center with adjacent outdoor playground for children six weeks to five years of age.  The Child Development Center facility includes developmental learning modules, activity areas, an isolation room, changing areas, patron visitor waiting area, administrative support space, staff lounge, work rooms, commercial kitchen, laundry storage, supply room, information systems, fire protection and alarm systems, Electronic Security Systems (ESS), Fire and Life Safety (FLS) systems, and Utility Monitoring and Control Systems (UMCS) connection. Additionally, the facility includes outdoor


play areas with age-appropriate child development equipment, safety surfacing, and fencing. Supporting facilities for the Child Development Center include site development, utilities and connections, lighting, paving, parking, sidewalks, curbs and gutters, bioretention areas, information systems, landscaping, and signage. Work will also include installation of video monitoring, alarm, and intercom systems for safety.


Robins Air Force Base, Geogia


REQUIREMENT


Construct a 41,000 SF large-sized Child Development Center to include 22 activity rooms, kitchen, laundry, administration and four fenced outdoor play areas. The construction will consist of reinforced concrete foundation, waterproof concrete floor slab with floor drains, and a cool roof system. The project includes all utilities, site improvements, pavements, and other supporting work necessary to make a complete and usable facility. The project will demolish buildings 942, 943, and 946 (30,770 SF). 


3.0 Requested Information & Market Intelligence Questionnaire


Section - General Information


Provide responses to the survey linked herein. 


https://forms.osi.apps.mil/r/cj3NNgMY4a


Section - Capabilities


Respondents are asked to structure Capability Statements to include the following elements:


  1. Corporate Overview - A brief summary of your firm's core capabilities, relevant experience, and capacity to perform the type of work contemplated under this RFI.  
  2. Commercial Best Practices. To the extent available, provide information regarding commercial best practices applicable to the contemplated construction delivery method, including:

  • Typical pricing/payment structures
  • Geographic coverage
  • Typical project schedule timelines, long lead items, and key decision points
  • Key considerations and risk associated with  permitting, logistics, staffing/labor availability, and construction execution.
  • Supply Chain and Logistics: Describe your supply chain for long lead items such as HVAC and electrical components; chillers, air handling units, computer room air conditioning (CRAC) units, transformers, etc.  What are your typical lead times for material and fabrication?

  1. Survey Responses – Please provide detailed responses to Survey Questions 10 through 13 (listed below and on the survey form). Respondents are asked to integrate these responses directly into their capability statements; separate or stand-alone survey responses are not required. Additional Information – Respondents may include other information that demonstrates their relevant capabilities, experience, and capacity.

Survey Questions 10-13


10.   Describe your experience or capability in designing and constructing childcare facilities that could innovate and accelerate construction.


11.  Describe your firm’s practical experience with collaborative delivery models, such as Design-Build, Progressive Design-Build or Construction Manager at Risk (CMAR), where your team was integrated into the design phase. What specific pre-construction services did you provide?



12.  For the projects listed in response to Q11, identify the major subcontractor(s) used and describe their qualifications. Detail the teaming relationship and contract structure between the construction contractor, the owner, and the Designer of Record. Explain how your team's involvement improved the final design quality, accelerated the delivery schedule, and reduced overall project cost.


13.  How does your team fully coordinate and integrate structural, envelop, and utility designs between different interfacing construction types (such as stacked volumetric modules and traditional stick-built or foundation systems)? What engineering models do you utilize to analyze structural settlement or consolidation across these interfaces?


4.0 Response Submission Instructions


  • Format: Responses to the survey must be submitted via the link provided.  The capability statement must be submitted in PDF format, single-spaced, using 11-point font or larger.
  • Submission Deadline: November 20, 2026, 5:00 PM EST
  • Submission Channel: Complete the survey at  https://forms.osi.apps.mil/r/cj3NNgMY4a
  • Submit capability statement via email to the Agreement Officer (AO) at contact@example.gov and copy contact@example.gov with the subject line: "USACE OTA Market Intelligence Response CDC - [Company Name]".
  • Proprietary Information: Any proprietary, sensitive, or business-confidential information must be clearly marked as such on each page to ensure proper handling by USACE  SAS.





Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262 and associated buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring and electrical distribution to support classroom needs, implementing simple dimming controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems and lighting controls. The project also requires the installation of new signage and the correction of plumbing deficiencies. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using a best suited negotiate methodology, with price, past performance, and corporate relevant experience weighted with equal importance. Offerors must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict material handling and labeling standards, particularly for wood products and electrical wiring. Compliance with the Americans with Disabilities Act, Buy American requirements, and prevailing wage rates for Glynn, Brantley, and McIntosh counties is mandatory. Proposals must be submitted electronically in separate price and technical volumes to the Contracting Officer by the specified deadline.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires hazardous materials abatement and site improvements, including paving, drainage upgrades, and repairs to water, sanitary, and storm systems. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. The award will be based on the lowest price, with evaluation factors including compliance with the Buy American Act. Bidders must provide pricing for two specific exhibit line items: building renovation and paving removal and replacement. Bonding requirements are tiered, with proposals of 150,000 dollars or more requiring bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act and requires adherence to ADA accessibility guidelines and specific cybersecurity standards for facility-related control systems. Quality assurance is managed through a multi-stage inspection process involving punch-out, pre-final, and final acceptance inspections. Monthly invoicing must be submitted via Wide Area Work Flow with required NAVFAC certifications and supporting documentation.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 25 days
View Details
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 29, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Efforts (GFE) to secure project financing. Bidders must comply with six specific GFEs, with several mandatory requirements for a bid to be deemed responsive. Specifically, proof of online solicitation postings for 30 consecutive calendar days and a print newspaper posting for at least one day, as well as proof of utilizing the Small Business Administration and Minority Business Development Agency, must be included in the bid package. Documentation for outreach efforts may be submitted up to three business days after the bid closing date. Failure to meet these specific GFE requirements will result in the bid being deemed non-responsive.
RT CONTRACTOR CORP

POSTED

about 1 hour ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This solicitation issued by J&J Contractors, Inc. seeks pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site work is required, including landscaping, parking, exterior lighting, telecommunications, and an underground stormwater retention system. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The scope of work is extensive, covering demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevators, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside project subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with NFPA-101 life safety codes, ADA, OSHA, and EPA regulations, with Massachusetts state regulations prevailing if they are more stringent than federal requirements. The contract is a small business set-aside and requires a single lump sum bid with a detailed cost breakdown for labor, materials, and equipment. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a Massachusetts contractor's license, a W9, a completed vendor questionnaire, a wage rate certification, and a minimum 90-day bid guarantee. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 1 hour ago

DEADLINE

in 18 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, along with the temporary disconnection and re-installation of HVAC equipment, furnaces, and water heaters. The contractor is responsible for all labor, materials, equipment, and supervision, and must provide a minimum one-year workmanship warranty upon final acceptance by CSD. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing by room and trade. Additionally, the selected contractor must provide payment and performance bonding for the full project value within ten days of award and maintain general liability insurance of at least one million dollars per occurrence. Pricing submitted in proposals must remain firm for 60 calendar days.
Career Systems Development Corporation

POSTED

about 1 hour ago

DEADLINE

in 21 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. Site preparation involves rock excavation, grading, and mitigation for impacted wetlands, as well as the installation of access roads, paving, and telecommunications infrastructure. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid invitations and documents.
J & J Contractors, Inc

POSTED

about 1 hour ago

DEADLINE

in 1 day
View Details

More opportunities from Department Of Defense → W074 Endist Savannah

Same awarding agency

NAICS: 236220
New
Federal
Infantry Platoon Battle Course (IPBC) Fort Bragg, North Carolina
Solicitation # W912HN26BA005
The U.S. Army Corps of Engineers Savannah District is soliciting bids for the construction of a standard Automated Infantry Platoon Battle Course (IPBC) at Fort Bragg, North Carolina, under solicitation W912HN26BA005. This is a Full and Open Competition for a single Firm-Fixed-Price contract under NAICS code 236220, with an anticipated construction magnitude between $10 million and $25 million. The project scope includes the construction of the IPBC, a small control tower, a small arms range operations control area, an operations and storage building, covered bleachers, a covered mess, an ammunition breakdown building, and latrine pads. Supporting infrastructure requirements encompass electric service, site improvements, information systems, cybersecurity measures, and sustainability energy measures. The period of performance is 720 calendar days following the notice to proceed. Technical requirements are extensive, covering underground electrical distribution, telecommunications outside plant infrastructure, and specific structural standards for metal roof and wall panels, unit masonry, and concrete. Key deliverables include the installation of fiber optic cabling, grounding and lightning protection systems, and the emplacement of various infantry and armor targets. Bids must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. Following several amendments to revise drawings and specifications, the final bid opening date is established as October 30, 2026, at 2:00 PM local time. Offerors must maintain active registration in the System for Award Management (SAM) to be eligible for award.
Commercial and Institutional Building Construction

POSTED

about 11 hours ago

DEADLINE

in about 16 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS