13200 South Mountain View Corridor Sewer Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The 13200 South Mountain View Corridor Sewer Project, managed by the Jordan Basin Improvement District in collaboration with the Utah Department of Transportation, involves expanding sewer infrastructure in Riverton, Utah. The scope of work includes the installation of an 18-inch diameter gravity sewer line along 13200 South, featuring approximately 900 feet of deep open-cut construction and a 549-foot trenchless crossing beneath State Route 85. Key technical requirements include the installation of a 36-inch steel casing, 60-inch diameter lined manholes, and various surface restorations such as pavement, curb, gutter, and striping. The project is subject to strict UDOT compliance for all work within the right-of-way and requires adherence to specific geotechnical standards due to the presence of highly collapsible soils and potentially gassy tunnels. Bidding is restricted to a specific list of prequalified contractors, including Newman Construction, Nix Construction, Red Pine Construction, Silver Spur Construction, Spade Excavating, and Whitaker Construction. The contract will be awarded to the lowest responsible and responsive bidder. Bids must be submitted by October 13, 2026, and must include a bid bond for 5 percent of the bid amount and a notarized sworn statement. The project timeline requires work to commence within ten days of the Notice to Proceed, with substantial completion due by June 1, 2027, and final completion by July 1, 2027. Payment is administered through monthly applications for payment based on an approved schedule of values.
General Info
Agency
Place of Performance
UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
This project includes installation of a gravity sanitary sewer with a trenchless crossing beneath SR‑85 (Mountain View Corridor) within UDOT Region 2 right‑of‑way. The Work includes, but is not limited to, installation of 10-inch and 18‑inch PVC gravity sanitary sewer pipe; trenchless installation of a 36‑inch‑diameter steel casing with carrier pipe beneath Mountain View Corridor (State Route 85); excavation, construction, and backfilling of launch, retrieval, and intermediate shafts; installation of new 60‑inch‑diameter lined sanitary sewer manholes; connection to the existing sanitary sewer system; abandonment and removal of existing sewer infrastructure; surface restoration, including pavement, curb and gutter, sidewalk, and striping; traffic control within UDOT right‑of‑way; sanitary sewer bypass pumping as required; and all related appurtenances and incidental work necessary to complete the Project in accordance with the Contract Documents.
More opportunities from Utah
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS