Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on September 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

13200 South Mountain View Corridor Sewer Project

Closed
973State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter, as well as 24-inch diameter trenchless crossings with associated launch and receiving shafts. Key deliverables include the installation of standard and doghouse manholes, a CSO regulator fit-out, outfall work, and the abandonment of existing pipes and manholes. Site restoration requirements include clearing and grubbing as well as seeding and fine grading for 5,130 square yards of wooded areas. Contractors must adhere to specific compliance and safety standards, including the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP) and the provision of geotechnical instrumentation and monitoring. Notably, the project requires specialized railroad insurance. The bid schedule includes various general base bid items, sewer base bid items, and contingent items to cover mobilization and extra depth excavation.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 28 days
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and adherence to bid requirements, including the submission of MWBE Good Faith Efforts and Table A documents. The project is governed by EJCDC standard forms and specifications, requiring the use of Class 250 ductile iron pipe with Protecto 401 lining. Contract administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Bidders must provide a bid bond, evidence of authority to sign, and proof of insurance. Payment is processed via applications for payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 4 days
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project in Virginia. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, adhering to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. Bids are due by 2:00 pm on November 12, 2026, and must be submitted exclusively through the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. Bidders must be registered in the Commonwealth of Virginia and provide a bid bond or certified check, along with three references for similar projects. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract amount and comply with Davis-Bacon wage determinations, OSHA safety standards, and ADA accessibility requirements. WG Construction is currently seeking MBE/WBE subcontractor participation for several scopes, including paving, material supply, site development, fencing, MEP, roofing, and carpentry. The project emphasizes socioeconomic compliance, incorporating federal mandates such as Executive Orders 12138 and 11625 regarding the utilization of minority and women-owned business enterprises, as well as the American Iron and Steel requirements under Section 436 of P.L. 113-76.
WG Construction Co., Inc.

POSTED

about 4 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The 13200 South Mountain View Corridor Sewer Project, managed by the Jordan Basin Improvement District in collaboration with the Utah Department of Transportation, involves expanding sewer infrastructure in Riverton, Utah. The scope of work includes the installation of an 18-inch diameter gravity sewer line along 13200 South, featuring approximately 900 feet of deep open-cut construction and a 549-foot trenchless crossing beneath State Route 85. Key technical requirements include the installation of a 36-inch steel casing, 60-inch diameter lined manholes, and various surface restorations such as pavement, curb, gutter, and striping. The project is subject to strict UDOT compliance for all work within the right-of-way and requires adherence to specific geotechnical standards due to the presence of highly collapsible soils and potentially gassy tunnels. Bidding is restricted to a specific list of prequalified contractors, including Newman Construction, Nix Construction, Red Pine Construction, Silver Spur Construction, Spade Excavating, and Whitaker Construction. The contract will be awarded to the lowest responsible and responsive bidder. Bids must be submitted by October 13, 2026, and must include a bid bond for 5 percent of the bid amount and a notarized sworn statement. The project timeline requires work to commence within ten days of the Notice to Proceed, with substantial completion due by June 1, 2027, and final completion by July 1, 2027. Payment is administered through monthly applications for payment based on an approved schedule of values.

General Info

Sewer infrastructure expansion in Riverton, Utah, with bids due by October 13, 2026.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

3
PDF, High priority: read this firstitb
High
PDF, High priority: read this first1 page · prequalified-contractors-list
High
PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
ContactsNo contact information available

Full Description

Show more
Only those contractors that were prequalified for the Multiple Mountain View Corridor Sewer Projects may bid on this project.
This project includes installation of a gravity sanitary sewer with a trenchless crossing beneath SR‑85 (Mountain View Corridor) within UDOT Region 2 right‑of‑way. The Work includes, but is not limited to, installation of 10-inch and 18‑inch PVC gravity sanitary sewer pipe; trenchless installation of a 36‑inch‑diameter steel casing with carrier pipe beneath Mountain View Corridor (State Route 85); excavation, construction, and backfilling of launch, retrieval, and intermediate shafts; installation of new 60‑inch‑diameter lined sanitary sewer manholes; connection to the existing sanitary sewer system; abandonment and removal of existing sewer infrastructure; surface restoration, including pavement, curb and gutter, sidewalk, and striping; traffic control within UDOT right‑of‑way; sanitary sewer bypass pumping as required; and all related appurtenances and incidental work necessary to complete the Project in accordance with the Contract Documents.

More opportunities from Utah

Same awarding agency

NAICS: 561720
New
SLED
Sandy City- Amphitheater Janitorial Services
Solicitation # RA27-135
Sandy City Corporation is soliciting proposals for janitorial services at the Sandy Amphitheater for the seasonal window from May to October. The scope of work includes ensuring the venue is clean and presentable for events, with options for bidders to provide either backstage cleaning only or a combination of backstage cleaning and an on-site event custodian. Additionally, the city is seeking optional monthly power washing services for guest chairs, stairways, and main walkways. The on-site custodian must be proficient in English, capable of using a walkie-talkie, and physically able to lift heavy bags and navigate stairs. While Sandy City provides basic cleaning supplies, vendors may bring their own additional materials. The contract will be awarded to the most responsive and responsible vendor based on a 100-point weighted scoring system. Evaluation criteria include experience and qualifications (30 points), cost (25 points), references and client feedback (20 points), staffing plan and availability (15 points), and proposed cleaning procedures and equipment (10 points). Additional points may be awarded following a vendor presentation or interview. Proposals must include company background, cleaning procedures, and a staffing plan, but must not include cost information. All questions are due by November 12, 2026, and final bids must be submitted via the designated online portal by November 16, 2026.
Janitorial Services

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 561621
New
SLED
IFB - Open Options Connect Care Plus 2-Year Software Support for Security System
Solicitation # 27TH10
Jordan School District is soliciting bids for a two-year software support renewal for its security system through the Open Options Connect Care Plus plan. The contract covers a 24-month period from November 1, 2026, to October 31, 2028, and requires a one-time upfront payment. The scope of work includes support for over 2,000 readers and locks, providing email, phone, and live chat support, software upgrades, and remote assistance. Specific deliverables include various Connect Care licenses for clients, photo-ID stations, DVR and video management system integrations, intrusion detection, and DNA Fusion web client seats. Bidders must be authorized resellers and quote exact part numbers, as no substitutions or alternate software will be accepted. The procurement process follows the State of Utah Procurement Code and is conducted via a three-stage evaluation: a pass/fail determination of mandatory requirements, a verification that the bid meets or exceeds the scope of work, and the selection of the lowest responsive bidder. Bids must be submitted electronically through the U3P Bonfire portal by November 13, 2026. Required documentation includes a declaration of debarment or suspension and a Public Contract Boycott Restrictions Statement for contracts exceeding $100,000 or vendors with 10 or more employees. Additionally, if the software collects student data, the awarded bidder must sign the district's Student Data Privacy Agreement.
Security Systems Services (except Locksmiths)

POSTED

1 day ago

DEADLINE

in 8 days
View Details
NAICS: 237110
New
SLED
DFCM Construction - VBS Construction Stage I - UDC - USCF Water Pump Station Modification & Fire Storage Tank- Project #26032100
Solicitation # MP27006
The State of Utah Division of Facilities Construction and Management is seeking proposals for project 26032100 to modify the water pump station and install a fire storage tank at the Utah State Correctional Facility in Salt Lake City. The primary objective is to separate the campus culinary water and fire water systems, which involves constructing a 290-square-foot valve control building and implementing piping modifications and new connections between the pump station, the valve building, and the new tank. The estimated construction cost for this project is 2,500,000.00, with a required substantial completion date of November 15, 2027. The selection process is a two-stage evaluation based on best value. Stage I utilizes a point-based system where contractors must score at least 80 points to be short-listed for Stage II bidding. Scoring is based on a Statement of Qualifications (50 points), a Management Plan (35 points), and Past Performance References (15 points). Mandatory requirements for eligibility include attendance at a mandatory meeting and the submission of a DFCM Termination or Debarment Form. Because the project is located at an active correctional facility, proposals must specifically detail the firm's approach to site security and project safety. All submissions must be uploaded via the U3P portal as a PDF, adhering to a strict six-page limit for the main proposal sections.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS