Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on October 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

13400 South Mountain View Corridor Sewer Project

Closed
State & Local
Submission Closed
Solicitation #
974

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The 13400 South Mountain View Corridor Sewer Project, managed by the Jordan Basin Improvement District, involves the installation of new gravity sanitary sewer infrastructure in Riverton, Utah. The scope of work includes the construction of a 15-inch SDR 35 PVC sewer line, approximately 1,175 feet of deep open-cut construction ranging from 15 to 26 feet, and the installation of 8-inch PVC pipe. A critical component of the project is the trenchless installation of 36-inch steel casing pipes with carrier pipes beneath State Route 85 and 13400 South. Additional requirements include the construction of 60-inch diameter manholes, abandonment of existing sewer infrastructure, surface restoration of pavement and sidewalks, and traffic control within UDOT Region 2 right-of-way. Eligibility is strictly limited to contractors prequalified for the Multiple Mountain View Corridor Sewer Projects, specifically including Newman Construction, Nix Construction, Red Pine Construction, Silver Spur Construction, Spade Excavating, and Whitaker Construction. Bidders must hold a valid Utah contractor's license and demonstrate specific expertise, including 1,500 linear feet of tunnel or bore experience within the last 10 years. The contract will be awarded to the lowest responsive and responsible bidder. Substantial completion of the work is required by March 31, with final completion and payment readiness by April 30. Bids must be submitted via the Bonfire platform by November 10, 2026, and must include a bid bond, a notarized bidder qualification form, and evidence of workforce capacity to meet the project deadlines.

General Info

Jordan Basin Improvement District sewer installation in Riverton, Utah, for prequalified contractors.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

11
PDF, High priority: read this firstbid-schedule
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first1 page · prequalified-contractors-list
High
PDF, High priority: read this first4 pages · q-and-a
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstbid-bond
High
PDF, Low priority1 page · industry-day
Low

Read all 11 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

51 mandatory

51 requirements in 9 areas

  • Cost & Pricing14 · 14 must
    033

    Bid Price for Mobilization/Demobilization

  • Submission8 · 8 must
    001

    Bid Validity Period

  • Eligibility7 · 7 must
    009

    Prequalification Requirement

    Contract notice
  • 48 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 51 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 7 days
  • Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 17 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
ContactsNo contact information available

Full Description

Show more
Only those contractors that were prequalified for the Multiple Mountain View Corridor Sewer Projects may bid on this project.
This project includes installation of a gravity sanitary sewer with a trenchless crossing beneath SR‑85 (Mountain View Corridor) within UDOT Region 2 right‑of‑way. The Work includes, but is not limited to, installation of 15‑inch and 8-inch PVC gravity sanitary sewer pipe; trenchless installation of a 36‑inch steel (0.500 inch thick) casing pipe with carrier pipe beneath Mountain View Corridor (State Route 85); trenchless installation of a 36‑inch steel (0.500 inch thick) casing pipe with carrier pipe beneath 13400 South; excavation, construction, and backfilling of launch, retrieval, and intermediate shafts; installation of new 60‑inch‑diameter sanitary sewer manholes; connection to the existing sanitary sewer system; abandonment and removal of existing sewer infrastructure; surface restoration, including pavement, curb and gutter, sidewalk, and striping; traffic control within UDOT right‑of‑way; sanitary sewer bypass pumping as required; and all related appurtenances and incidental work necessary to complete the Project in accordance with the Contract Documents.

More opportunities from Utah

Same awarding agency

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS