This Solicitation opportunity from Utah was posted on September 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
13800 South Mountain View Corridor Sewer Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The 13800 South Mountain View Corridor Sewer Project, solicitation number 971, is a construction contract issued by the Jordan Basin Improvement District for work located in Herriman and Riverton, Utah. The scope of work involves installing approximately 500 linear feet of 18-inch sanitary sewer pipeline, three sanitary sewer manholes, and a 434-foot-long guided bore with a minimum 36-inch casing crossing under the Mountain View Corridor within the UDOT right-of-way. Bidding is strictly limited to prequalified contractors, specifically Newman Construction, Nix Construction, Red Pine Construction, Silver Spur Construction, Spade Excavating, and Whitaker Construction. Bids must be submitted in a sealed envelope to the District office in Bluffdale, Utah, by 2:00 pm local time on October 13, 2026. Required submission materials include a formal bid proposal, a bid bond for 5 percent of the bid price, and a notarized Information Required of Bidder document detailing licensing, experience, and key personnel. Award evaluation is based on bid price, technical data, and the qualifications of the proposed project manager, superintendent, and site safety representative. The contract requires performance and payment bonds, adherence to specific ASTM quality standards, and the provision of record drawings upon completion. Payment is processed 30 days after an application for payment is recommended for approval by the Board of Trustees.
General Info
Agency
Place of Performance
UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The work includes installing approximately 500 linear feet of 18-inch sanitary sewer pipeline, 3 sanitary sewer manholes, a 434-foot-long guided bore (36-inch minimum casing) crossing under the Mountain View Corridor, and associated items to construct the new sewer lines.
More opportunities from Utah
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
