Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

140th COS Advantor upgrade requirement

Active
W50S8B-26-F-A022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → W7NP Uspfo Activity Njang 108View Agency

NAICS

334290 - Other Communications Equipment ManufacturingView NAICS

Place of Performance

0, NJ, 08641, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

special-notice

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7NP Uspfo Activity Njang 108
Contacts1 person available
OfficeJB MDL, NJ, 08641-5309, USA
Organization / Agency
Department Of Defense → W7NP Uspfo Activity Njang 108
View Agency Profile
Office AddressJB MDL, NJ, 08641-5309, USA

Full Description

Show more

This is a Notice of Intent to Sole Source and not a Request for Quotation.


The 108TH Wing intends to award a sole-source, firm-fixed-price contract to Advantor Systems Corporation, CAGE# 1S063, for the upgrade and integration of an Intrusion Detection System (IDS) and Access Control System (ACS) for the Alert Area in Building 3322, for their Cyber Operations Squadron.


This action is being conducted under the authority of RFO FAR 6.103-1: Only one responsible source and no other supplies or services will satisfy agency requirements,10 U.S.C 3204(a)(1)


The 108th is required to procure sole source to Advantor. Per AFI 31-101: The Advantor Alarm System is the only alarm/security system that the 87th SFS can use to monitor IDS Alarm Activity on JB MDL. In addition: A. AFI 31-101 prohibits the tenant (108th Security Forces) from monitoring two separate IDS alarm systems simultaneously and all the existing infrastructure is already Advantor. B. The Existing IBDSS-East IDS Maintenance Contract managed by the AFSFC is for Advantor only, this includes having Advantor certified technicians on site for repairs and inspections. Advantor Alarm Panels are the only brand compatible with the JB MDL Advantor IBDSS Servers that are in use at JB MDL.


Similar Contracts

Same NAICS industry code

NAICS: 334290
New
DIBBS
PLATE, MOUNTING
Solicitation # SPE4A6-26-T-14RN
The contract concerns the procurement of a single mounting plate identified by NSN 5895017012637 and part number 12272-3317-01 from L3HARRIS GLOBAL COMMUNICATIONS, INC., with a unit price of $1.00 and a total contract value of $1.00. Delivery is mandated within five days after award, with FOB origin terms, and must be shipped by the fastest traceable means excluding parcel post to an address in Vancouver, WA. The item is subject to stringent packaging and marking requirements per MIL-STD-2073-1E and MIL-STD-129, including standardized barcoding, unit container specifications, intermediate container codes, and a pack code of U. Preservation methods require cleaning and drying with no preservation or cushioning materials applied. Palletization must conform to DLA’s RP001 packaging requirements, and physical item marking must follow RQ017 standards. Inspection and acceptance occur at the destination, with sampling governed by MIL-STD-1916 or ASQ H1331 Table 1, enforcing zero non-conformances for acceptance unless otherwise specified, and assigning verification levels of VII, IV, and II to critical, major, and minor attributes. Technical and quality compliance is enforced through referenced DLA Master List requirements including RA001, RC001, RQ011, and RQ017. The contract incorporates a comprehensive suite of FAR and DFARS clauses, including those addressing equal opportunity, trafficking in persons, employment eligibility, sustainable products, hazardous material identification, cybersecurity safeguards, subcontracting, inspection of supplies, and prohibitions on certain foreign-sourced defense equipment and chemicals. Payment must be processed through Wide Area WorkFlow, and all offerors must provide a UEI and CAGE code. The solicitation is subject to automated award under a likely Lowest Price Technically Acceptable methodology, with no options, modifications, or pricing alternatives present. All proposals must be submitted electronically via DIBBS by the deadline of August 17, 2026, and the contract references overarching compliance with the DLA Master Solicitation Revision 105.
ASC COMMODITIES DIVISION

POSTED

about 17 hours ago

DEADLINE

in 5 days
View Details
NAICS: 334290
New
DIBBS
PANEL, CONTROL, ELECT
Solicitation # SPE4A7-26-R-0777
DLA Aviation is conducting market research through a Sources Sought notice for the new manufacture of an electrical control panel, identified by NSN 5895-01-584-9094 and part number 160305-1. The procurement is intended to result in an unrestricted Indefinite Quantity Contract with a five-year base period. The scope of work includes the procurement of component parts, manufacturing, inspection, testing, preservation, packaging, and shipping. The estimated annual demand is 10 units, with delivery orders ranging from a minimum of 5 to a maximum of 10 units. This is a critical application item, and the contract will be subject to the Supplier Performance Risk System, where price, past performance, and delivery will be equally weighted in the award decision. Interested parties must be registered in the System for Award Management (SAM) to participate. While the current notice is for market research purposes to determine the procurement method, the anticipated solicitation will require written quotes and may necessitate certified cost and pricing data. The delivery schedule is set at 115 days after receipt of order (DARO) with FOB Origin and destination inspection/acceptance. Potential suppliers are requested to submit capability statements and organizational details via email to Montana Kipp by August 18, 2026. The final solicitation is expected to be issued around September 3, 2026, with a closing date of October 5, 2026.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 334290
New
Federal
Phillips Target Range Rebuild
Solicitation # W911SF26Q014
Solicitation W911SF26Q014 is a non-personal services, Firm Fixed Price contract set aside for SBA Certified Women-Owned Small Businesses under NAICS 334290. The project involves the rebuild of two live-fire turning target control systems, consisting of eight turning targets across four lanes, at Phillips Range in Fort Benning, Georgia. The contractor is responsible for providing all labor, materials, and supervision to remove obsolete controls, wiring, and electrical hardware, and to design, fabricate, install, and program new systems to restore full range operability for Army marksmanship training. The technical scope requires the delivery of two remotely operated systems controlled by a Programmable Logic Controller with custom ladder logic, including a 4-button remote for Barricade configurations and an 8-button remote for Practical configurations, both with a minimum wireless range of 300 feet. All work must comply with the National Electrical Code, UFC standards, and Army range safety regulations including AR 385-63, TC 3-20.0, and TC 3-20.40. The contractor must provide a Project Lead and a certified Electrical/Controls Engineer. The period of performance is 120 calendar days from the Notice to Proceed, with an anticipated materials lead time of four to eight weeks. Final acceptance is contingent upon a successful on-site demonstration to the Contracting Officer's Representative, and invoicing is processed through WAWF within 10 days of completion.
W6QM Micc-Ft Benning

POSTED

about 22 hours ago

DEADLINE

in 7 days
View Details