Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on July 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

145th AW - Powered Paragliding (PPG) Flight and Sustainment System

Closed
W50S87-26-Q-5004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336411
New
DIBBS
PARTS KIT, REGULATOR
Solicitation # SPE4A5-27-T-2030
Solicitation SPE4A5-27-T-2030 is issued by the DLA Weapons Support ASC Supplier Oper OEM Division for the procurement of eight Parts Kit, Regulators (NSN 1660-00-968-8648). This is a Navy Identified Critical Safety Item with a required delivery date of June 8, 2027, and a need ship date of April 6, 2027. The contract is designated as FOB Origin, with the place of delivery located at DLA Distribution Cherry Point in North Carolina. While the solicitation is not a small business set-aside, offerors are encouraged to provide quantity ranges in their quotes to accommodate volatile demand. All submissions must be made through the DIBBS portal, and items produced via additive manufacturing are ineligible for award. The contractor must adhere to strict quality and compliance standards, including a quality management system compliant with SAE AS9100 or an equivalent. Packaging must follow ASTM D3951 and RP001, while marking must comply with MIL-STD-129. The procurement is subject to domestic material restrictions, including the Buy American Act and the Berry Amendment. Key regulatory requirements include the use of the Wide Area WorkFlow system for invoicing, compliance with NIST SP 800-171 for cybersecurity, and adherence to FAR and DFARS clauses regarding trafficking in persons and hazardous material labeling. Inspection and acceptance will take place at the point of origin.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER OEM DIVISION

POSTED

about 12 hours ago

DEADLINE

in 8 days
NAICS: 336411
New
DIBBS
LINER, LATRINE
Solicitation # SPE8E8-27-T-0410
This solicitation, issued by DLA Troop Support Construction and Equipment, is for the procurement of two latrine liners under NSN 4510-01-204-1504. The contract is managed under the First Destination Transportation program with delivery and performance occurring at Robins AFB, Georgia. A critical requirement of this award is Government First Article Testing, which requires the contractor to deliver two units within 60 calendar days of the contract date for verification of all dimensional and material requirements. The final delivery period is set at 347 days, with a need ship date of April 26, 2027, and an original required delivery date of February 15, 2028. The procurement is subject to strict quality and regulatory standards, including ISO 9001:2015 compliance and adherence to STM22-006 and STM22-006/01 material certifications. Because the item contains technical data subject to ITAR or EAR export controls, access is limited to approved DLA contractors with US/Canada Joint Certification Program certification. Packaging must comply with ASTM D3951 and RP001, while marking and labeling must follow MIL-STD-129 and MIL-STD-130N. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and compliance with the Buy American Act and Berry Amendment. The solicitation incorporates a price evaluation preference for HUBZone small business concerns and requires a response deadline of November 9, 2026.
WARNER ROBINS

POSTED

about 12 hours ago

DEADLINE

in 12 days
NAICS: 336411
New
DIBBS
DIFFUSER, AIR, AIRCRA
Solicitation # SPE4A7-27-T-2263
Solicitation SPE4A7-27-T-2263, issued by the DLA Weapons Support ASC Supplier Oper AE and AF Div, is for the procurement of 17 aircraft air diffusers under NSN 1660011210606. This critical application item is identified as a commercial product, with Bell Helicopter Textron Inc. (CAGE 97499, P/N 206-070-475-5) and Globe Motors Inc. (CAGE 25140, P/N 19A2501) listed as sources. The requirement specifies a need ship date of November 15, 2026, and an original required delivery date of May 22, 2027, with a delivery timeframe of 9 days after receipt of order. Delivery is FOB Origin, with both inspection and acceptance occurring at the destination, DLA Distribution Cherry Point in North Carolina. The contract mandates strict adherence to quality and packaging standards, including MIL-STD-129 for marking and labeling, ASTM D3951 for packaging, and RP001 for palletization. Quality assurance will be managed via sampling methods such as MIL-STD-1916 or ASQ H1331, with a zero-nonconformance requirement for MIL-STD-105/ASQ Z1.4. Key regulatory requirements include CMMC Level 2 Self-Assessment, the Buy American Act, and the Berry Amendment. Payment and receiving reports must be processed electronically through the Wide Area WorkFlow (WAWF) system. The procurement is categorized under NAICS code 336411 and may be eligible for automated award or the HUBZone price evaluation preference.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 12 hours ago

DEADLINE

in 8 days
NAICS: 336411
New
DIBBS
ADAPTER, COMPRESSED GAS
Solicitation # SPE4A6-27-T-7404
Solicitation SPE4A6-27-T-7404 is a small business set-aside request for quotations issued by the DLA Weapons Support ASC Commodities Division for the procurement of compressed gas cylinder valve adapters, specifically identified as connector, oxygen hose to regulator, type I (NSN 1660-00-348-2162, Part Number MS22058-1). The requirement consists of multiple line items totaling 164 units, with delivery lead times of 151 days and shipments directed to DLA Distribution centers in San Diego, California; Cherry Point, North Carolina; and New Cumberland, Pennsylvania. As this is designated as a life support item and a Navy Identified Critical Safety Item, the government will only accept quotes from approved sources of supply or authorized dealers, and surplus materials or additive manufacturing processes are strictly prohibited. The contractor must adhere to rigorous quality and technical standards, including SAE AS9100 for manufacturers and AS9120 for distributors, and must maintain an approved JCP certification to access export-controlled data. Quality conformance is validated through mandatory production lot testing, with critical characteristics requiring an AQL of 0.04 and noncritical characteristics requiring an AQL of 0.10, both based on zero defects. Packaging and marking must comply with MIL-STD-2073-1E, MIL-STD-129, and SAE ARP1176, while palletization must follow RP001 requirements. Administrative requirements include electronic invoicing via Wide Area WorkFlow and compliance with the Buy American Act and DFARS cybersecurity standards.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

about 12 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

This solicitation, issued under number W50S87-26-Q-5004 by the 145th Airlift Wing of the North Carolina National Guard, seeks a firm-fixed-price contract for the procurement of two Rucksack/Backpack Powered Flight Systems, along with sustainment packages, training, and associated services for tactical military operations. The requirement is set aside for small businesses under NAICS code 336411 with a size standard of 1,350 employees, and compliance with FAR Part 12 for commercial items is mandatory. The core deliverables include two powered paragliding systems each featuring a pair of distinct paraglider wings—one sized between 23 to 25 square meters for standard operator weight and another between 26 to 28 square meters certified to carry an 80-pound integrated rucksack payload—both manufactured in solid, muted tactical colors such as grey, olive drab, or coyote brown with no large commercial logos visible during flight. Visual requirements are limited to externally visible components like the canopy, harness, and motor frame, excluding internal emergency equipment such as reserve parachutes. The system must operate effectively at altitudes up to 10,000 feet, feature a 140cm propeller, adjustable harness, and night-flight capability with NVG compatibility, and include an integrated engine shutoff and right-hand throttle control. The solicitation has been amended to extend the quote submission deadline from July 24 to July 31, 2026, to accommodate the forthcoming addition of technical specifications for a parachute component not originally included. All other terms and conditions remain unchanged. Offers must be submitted via the Request for Quote process, with respondents required to be registered and active in SAM.gov. Evaluation will follow a best-value trade-off approach, prioritizing past performance as a pass/fail gatekeeper, followed by an assessment of technical acceptability and price competitiveness. Delivery is FOB destination to New London, North Carolina, with inspection and acceptance performed by the government upon receipt. The contract includes mandatory clauses related to cybersecurity, supply chain security, labor standards, whistleblower protections, and procurement restrictions concerning foreign entities, including prohibitions on products from China’s Xinjiang region, Kaspersky Lab, ByteDance applications, and inverted domestic corporations. A wage determination for North Carolina (2015-5897, Rev. 4) applies to all labor, and

General Info

Small business set-aside for PPG flight systems, training, and sustainment in New London, NC, due July 24, 2026.

NAICS

336411 - Aircraft Manufacturing

Place of Performance

New London, NC, 28127, USA

Set-Aside

SBA

Documents

3

W50S87-26-Q-5004 Powered Paragliding Flight and Sustainment System RFQ

PDF, High priority: read this firstrfq
High

W50S87-26-Q-5004 Powered Paragliding Flight and Sustainment System RFQ

PDF, High priority: read this firstrfq
High

Wage Determination No. 2015-5897 for North Carolina Stanly County

PDF, High priority: read this firstwage-determination
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Jul 24, 2026 to Jul 31, 2026. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7NS Uspfo Activity Ncang 145
Contacts2 people available
OfficeCHARLOTTE, NC, 28208-3866, USA
Office AddressCHARLOTTE, NC, 28208-3866, USA

Full Description

Show more

The purpose of this amendment is to add the following to the technical proposal section of the attached FAR Part 12 Synopsitation:


Primary Flight Canopies (Paragliders):
The system must include two (2) distinct primary paraglider wings per set to support varied operational weight profiles:


  • Unburdened/Agile Wing: One (1) wing sized approximately 23 to 25 square meters, optimized for standard operator weight without heavy payloads ("slick" flight).
  • Heavy Payload Wing: One (1) wing of a larger size, approximately 26 to 28 square meters, certified to safely lift, maneuver, and land the operator plus a minimum 80 lb integrated rucksack payload.
  • Visual Signature: Both wings must be manufactured in a solid, muted tactical color (e.g., grey, olive drab, or coyote brown) and feature no large, high-visibility commercial logos.

"Tactical color and low-visibility logo requirements apply only to components externally visible during standard flight operations (e.g., primary glider canopy, harness, and motor frame). These visual requirements do not apply to internal emergency equipment, such as the reserve parachute canopy."


Except as provided herein, all other terms and conditions of the solicitation remain unchanged and in full force and effect.


The purpose of this amendment is to extend the due date for receipt of quotes and notify vendors of an upcoming addition to the requirement specifications.


Specifically, this amendment makes the following changes:


  1. Extension of Quote Due Date: The deadline for receipt of quotes is hereby extended.


    • Previous Due Date: Friday, July 24, 2026, 10:00AM EST

    • New Due Date: Friday, July 31, 2026, 10:00AM EST

  2. Addition of Specifications (Forthcoming): This extension is granted to allow the Government sufficient time to incorporate additional specifications for a parachute that was not included in the original solicitation document. An additional amendment providing these specifications will be issued shortly.


Except as provided herein, all other terms and conditions of the solicitation remain unchanged and in full force and effect.


This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Subject solicitation is issued as a Request for Quote outlined below.  This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.


FUNDING: Funds are not presently available for this solicitation. No award will be made unless funds become available to make payment under an order. The government reserves the right to cancel this solicitation at any time without any obligation to the offeror by the government.


SAM REGISTRATION: Vendors must be registered and active in SAM.gov at the time of quotation/offer submission AND at the time of award (FAR 52.204-7).


SMALL BUSINESS


North American Industry Classification System (NAICS) code: 336411


Size Standard: 1,350 employees


The Contractor shall provide all personnel, materials, supervision, and services necessary to provide the following:


Place of Delivery/Performance: New London, NC (City/State)


Applicable Wage Determination 2015-5897, Revision 4


Line Item 0001 - Rucksack/Backpack Powered Flight System - Qty: 2 / Unit: Ea - Unit Price________; Extended Price_________


Line Item 0002 - Sustainment and Spare Parts Package - Qty: 2 / Unit: Ea - Unit Price_________; Extended Price__________


Line Item 0003 - Basic Flight Operations Training Course (2 students) - Qty: 1 / Unit: Job - Unit Price__________; Extended Price_______


Line Item 0004 - Maintenance Technician Training Course (2 students) - Qty: 1 / Unit: Job - Unit Price _________; Extended Price_______ 

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS