Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Kansas was posted on October 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

14th Avenue Bridge Replacement - Utilities

Closed
577State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 213111
New
SLED
ODNR, Division of Oil & Gas – OWP – Federal Project –Scioto 3F - 2 Wells
Solicitation # SRC0000042633
The Ohio Department of Natural Resources, Division of Oil and Gas Resources Management, is soliciting bids for the Scioto 3F Project to plug and plate two orphan wells, Oertels Corner #1 and Romanello #1, located in Jefferson Township, Scioto County. The scope of work encompasses mobilization, well site development, drilling or cleaning out and plugging of the wells, decommissioning and disposal of all casing and production equipment, and full restoration of disturbed areas. Key technical deliverables include the installation of cement plugs from 210 feet to within 30 inches of ground level and the maintenance of strict well control throughout the process. Work must be performed in accordance with Ohio Revised Code 1509 and Ohio Administrative Code Chapters 1501:9-11 and 1501:9-12. As a federally funded project, contractors must comply with Davis-Bacon prevailing wage requirements and Buy America sourcing mandates for iron, steel, and manufactured construction materials. Eligible bidders must be active on CSP900922 (DAS Index No. MAC110), attend the mandatory pre-bid meeting on November 4, 2026, and be in good standing with the agency. The contract will be awarded to the lowest responsive and responsible bidder based on submissions via OhioBuys. Performance must begin within three months of the contract end date and be completed by May 1, 2027, or five months after the effective date, whichever is sooner. Invoicing is managed through the Orphan Well Project Management Contractor Portal and requires supporting documentation, including payroll reports for federal compliance.
Dnr900200 Oil And Gas Dnrfra

POSTED

5 days ago

DEADLINE

in 22 days

AI Contract Overview

Show more

This project involves the replacement of water lines near 14th Street and 2nd Street, as well as a force main replacement near Beta Road, in Dodge City, Kansas. The work includes installing both regular and restrained joint piping, with over 700 linear feet of directional drilling required to traverse beneath the Arkansas River and cross levees. Casing will be necessary for two of the pipeline replacements to ensure stability and safety during construction. All three projects are designed to improve the water infrastructure in the area, with particular attention to crossing significant geographical features such as the river and levees. Bidding documents, including detailed drawings and project manuals, are available from Drexel Technologies and can be accessed online. The contract solicitation, posted on October 20, 2025, with a response deadline of November 6, 2025, is managed by Dodge City under the Kansas State Local Economic Development (SLED) organization. The project is estimated to cost between $500,000 and $1,500,000 and falls under the NAICS code 213111, which pertains to water and sewer line construction. Interested contractors can find additional information and submit their bids through the city’s designated bidding portal.

General Info

Place of Performance

KS, USA

Set-Aside

NONE

Documents

24

Addendum 1 for ITB 25-045 South Palafox Pedestrian Improvements

PDF, High priority: read this firstamendment
High

Addendum 2 for ITB 25-045 South Palafox Pedestrian Improvements

PDF, High priority: read this firstamendment
High

Addendum No. 4 - Lift Stations Package (Project No. 46S003-46S13-0553-46320)

PDF, High priority: read this firstamendment
High

Basin 2/3 Lift Stations Package - Q&A Notice 1

PDF, High priority: read this firstq-and-a
High

Bid Form - Rebid Heavy Fleet Surplus Sale

PDF, High priority: read this firstrfb
High

Bid No. 25-045 South Palafox Place Pedestrian Improvements Project Manual

PDF, High priority: read this firstitb
High

City of Minot Broadway Circle RFP

PDF, High priority: read this firstrfp
High

City of San Mateo Project No. 46S003-46S13-0553-46320 - Lift Stations Package

PDF, High priority: read this firstitb
High

ITB-25042 Palafox Pedestrian Improvements Construction Documents

PDF, High priority: read this firstitb
High

ITB-25042 Palafox Pedestrian Improvements Utility and Construction Notes

PDF, High priority: read this firstitb
High

Jefferson County Heavy Fleet Surplus Sale 2025

PDF, High priority: read this firstifb
High

Lift Stations Package (46S003-46S13-0553-46320) - Addendum No. 3

PDF, High priority: read this firstamendment
High

Lift Stations Package - Sewer Map 535 - Addendum 4

PDF, High priority: read this first1 page · amendment
High

Lift Stations Package - Sewer Map 556 - Addendum 4

PDF, High priority: read this first1 page · amendment
High

Lift Stations Package - Sewer Map 557 - Addendum 4

PDF, High priority: read this first1 page · amendment
High

Project 46S003-46S13-0553-46320 - Addendum No. 2

PDF, High priority: read this firstamendment
High

Project 46S003-46S13-0553-46320 Lift Stations Package - Addendum No. 1

PDF, High priority: read this firstamendment
High

RFQ 577 Price Sheet - Triple Axle Tilt Deck Trailer

DOCX, High priority: read this firstprice-sheet
High

RFQ #577 - Triple Axle Tilt Deck Equipment Trailer

PDF, High priority: read this firstrfq
High

State of Idaho Contract Terms and Conditions 2024

PDF, High priority: read this first20 pages · contract-terms-and-conditions
High

City of San Mateo - Lift Stations Package

DOCX, Low priorityspecial-notice
Low

City of San Mateo - Lift Stations Package Plan Holders List

PDF, Low priorityother
Low

Lift Stations Package - Pre-bid Meeting Attendees

PDF, Low priorityindustry-day
Low

RFQ 577 Attachment 3 Signature Page - Triple Axle Tilt Deck Trailer

DOCX, Low prioritysignature-page
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

7 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Oct 8, 2019 to Oct 24, 2024. The notice title changed. NAICS code added: 336991. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Oct 24, 2024 to Aug 2, 2024. The notice title changed. NAICS code changed from 336991 to 336212. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Aug 2, 2024 to Mar 7, 2025. The notice title changed. NAICS code changed from 336212 to 624221. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Mar 7, 2025 to Jun 2, 2025. The notice title changed. NAICS code removed. The notice description changed.

Notice updated

Response deadline changed from Jun 2, 2025 to Aug 26, 2025. The notice title changed. NAICS code added: 532412. The notice description changed.

Notice updated

Response deadline changed from Aug 26, 2025 to Sep 10, 2025. The notice title changed. NAICS code changed from 532412 to 541211. The notice description changed.

Notice updated

Response deadline changed from Sep 10, 2025 to Nov 6, 2025. The notice title changed. NAICS code changed from 541211 to 213111. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKansas → Dodge City
ContactsNo contacts available
OfficeN/A
Organization / AgencyKansas → Dodge City
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This project consists of replacement of water lines near 14th St and 2nd St as well as a Force Main Replacement near Beta Rd. Piping will include both regular and restrained joint. There will be over 700 L.F. of directional drilling. All three projects will go under the Arkansas River and cross the levees, and casing will be required for two of the replacements.The bidding documents consisting of the drawings and project manual may be examined and obtained from Drexel Technologies at https://www.drexeltech.com/ .***See attachment for full description

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS