Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

150MM Flow CB Watermain Replacement Works Along Inglewood Dr, Palgrave Cr & Sutherland Ave, City of Brampton, Project 26-1340B

Active
2026-320TInternational

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Region of Peel is soliciting bids for Project 26-1340B, which involves the supply and installation of a 150 mm diameter PVC watermain in the City of Brampton. The scope of work covers approximately 1,635 meters of replacement across Inglewood Drive, Palgrave Crescent, and Sutherland Avenue. Construction will primarily utilize the open cut method, though water services will be installed via trenchless methods to protect local trees. Key technical requirements include the installation of bentonite trench plugs every 75 meters, live tapping of a 300 mm watermain, and strict adherence to hydrostatic testing at 1035 kPa. The project must be completed by September 30, 2027, with work maintained on a continuous basis. This unit price contract will be awarded to the lowest-priced compliant bidder who passes a mandatory minimum domestic content check and possesses a valid Occupational Health and Safety Management System certification. Bidders must provide a digital bid bond of 300,000 dollars and an agreement to bond from an Ontario-permitted company with an A.M. Best rating of B+ or better. Submissions must be made electronically by October 30, 2026. The contract is governed by the Ontario Provincial Standards General Conditions of Contract and the Regional Municipality of Peel Supplemental General Conditions, with payment issued via Electronic Funds Transfer.

General Info

Bids for installing 1,635 meters of PVC watermain in Brampton by September 2027.

Documents

5

2026-320T: 150MM Flow CB Watermain Replacement Works - City of Brampton

PDF, High priority: read this firstrfb
High

Arborist Report and Tree Protection Plan - Project No. 26-1340

PDF, High priority: read this firstspecifications
High

Regional Municipality of Peel Approved Products List – Linear Water

PDF, High priority: read this firstspecifications
High

Supplemental General Conditions Vol. 2.1

PDF, High priority: read this firstcontract-document
High

OPSS.MUNI 100 General Conditions of Contract

PDF, Low prioritycontract-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyRegion of Peel
ContactsNo contacts available
OfficeCAN
Organization / AgencyRegion of Peel
Office AddressCAN
ContactsNo contact information available

Full Description

Show more
150MM Flow CB Watermain Replacement Works Along Inglewood Dr, Palgrave Cr & Sutherland Ave, City of Brampton, Project 26-1340B.The bid document will be posted https://peelregion.bidsandtenders.ca when available. This procurement is issued in accordance with the terms of the Comprehensive Economic and Trade Agreement (CETA), Canadian Free Trade Agreement (CFTA), and other applicable trade agreements.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves constructing 16,435 linear feet of new 20-inch ductile iron force main and performing extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional requirements include the installation of new gravity sewers, manholes, stormwater facilities, and site grading. The contract is a small business set-aside open to various SBA certifications, including VOSB, SDVOSB, WOSB, and HUBZone. Award will be granted to the responsible bidder submitting the lowest responsive bid, with evaluation focusing on qualifications, financial ability, and the submission of required MWBE documentation. Performance begins upon a Notice to Proceed, which is typically issued within 30 to 60 days of the bid opening. The contractor is required to provide performance and payment bonds, adhere to National Electric Code and NEMA standards, and ensure all materials are delivered and stored according to strict manufacturer and safety specifications. Payment is processed via applications for payment reviewed by the Engineer and is due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details

More opportunities from Region of Peel

Same awarding agency

NAICS: 236118
New
International
ESTABLISHMENT OF A GENERAL CONTRACTOR FOR UNOCCUPIED UNIT TURN-OVER RENOVATIONS, REGION OF PEEL, ROSTER
Solicitation # 2026-526V
The Region of Peel, through the Peel Housing Corporation, is establishing a roster of qualified General Contractors to perform unoccupied unit turn-over renovations. The scope of work includes providing all labor, materials, and equipment for renovations, specifically focusing on the removal and replacement of kitchen upper and lower cabinetry and countertops, as well as the relocation of electrical and plumbing fixtures such as thermostats, receptacles, and appliances. All work must comply with the Ontario Building Code, the Residential Tenancy Act, and the Accessibility for Ontarians with Disabilities Act, with specific requirements for ADA-compliant range hoods and strict material safety standards for flammability and smoke spread. The selection process follows a staged evaluation based on a 100-point scale, consisting of a technical proposal worth 60 points and a financial proposal worth 40 points. Bidders must score at least 39 points on the technical evaluation, which assesses company profile, past project experience, and staffing capacity, to proceed to the financial stage. Only the seven highest-scoring technical bidders move forward, with the final selection potentially limited to three vendors. Awarded contractors must provide a renewable performance bond equal to 10% of the total contract value and maintain a WSIB Certificate of Clearance. Contract administration requires strict adherence to a structured work order timeline, including acknowledging requests within one business day and providing estimates within five business days of a site visit. Invoicing must be submitted in PDF format for each suite separately within 30 days of final acceptance and must be accompanied by a CCDC 9A statutory declaration. Quality control is paramount, with the first three completed suites subject to a joint review and a requirement for vendors to rectify deficiencies on a 24/7, 365-day basis.
Residential Remodelers

POSTED

about 20 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS