Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on May 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

15108 DCSA Sources Sought Synopsis

Closed
15108Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Government is seeking information from qualified small businesses to manufacture Digital Computer System Assembly (DCSA) enclosures for the Common Munition Bit Reprogramming Equipment (CMBRE) system, specifically focusing on the fabrication of a DISPLAY WIRE CLAMSHELL, CONSOLIDATED STACK component made from AL 6061-T6 aluminum. This sources sought notice, issued under solicitation number 15108, is a market research tool designed to identify capable vendors and is not an invitation to bid or form a binding contract. Responses are due by June 8, 2026, at 10:00 a.m. Mountain Time and must be submitted as a single, three-page PDF email attachment to the designated contracting points of contact. The solicitation is a Total Small Business Set-Aside under FAR 19.5, requiring respondents to self-certify as a small business or eligible socioeconomic category including 8(a), HUBZone, SDVOSB, or WOSB, and to provide their CAGE code and Unique Entity ID. Performance will occur at Hill Air Force Base, Utah, with delivery required 11 weeks after receipt of order, though FOB terms are not specified. Manufacturing must comply with stringent military standards including MIL-DTL-5541 for chemical film, MIL-DTL-0053022 for epoxy primer, MIL-PRF-85285 for polyurethane coating, MIL-STD-130 for part marking and barcoding, and AWS D17.1 for welding. All components must undergo pressure testing per MIL-STD-108, be thoroughly cleaned of surface contaminants, and meet dimensional tolerances per ASME Y14.5-2000. Invoicing must be processed through Wide Area Workflow (WAWF), and export control provisions under ITAR and DOD Directive 5230.25 apply due to the sensitive nature of the CMBRE system. No pricing data, contract value, or formal evaluation factors are provided, as this notice is intended solely for market research purposes to inform a future solicitation.

General Info

DoD seeks small business for manufacturing DCSA enclosures for CMBRE prototype, response due June 8, 2026.

NAICS

541519 - Other Computer Related Services

Place of Performance

Hill Air Force Base, UT, 84056, USA

Set-Aside

SBA

Documents

7

201754322-47 BIOS Battery Bracket Drawing

PDF, High priority: read this firstspecifications
High

Atch 6 201754323-40 Technical Drawing and Specifications Rev 0.02

PDF, High priority: read this firstspecifications
High

Drawing 201754323-31 Display Wire Clamshell

PDF, High priority: read this firstspecifications
High

15108 DCSA Request for Information / Sources Sought Synopsis

PDF, Low prioritysources-sought
Low

Atch 2 201754322-37

PDF, Low priorityother
Low

Attachment 3 to Solicitation 201754322-40

PDF, Low priorityother
Low

DCSA Equipment List A15108 PR23416

PDF, Low priorityequipment-list
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8222 Afsc Ol H Pzie
Contacts2 people available
OfficeHILL AFB, UT, 84056-5805, USA
Office AddressHILL AFB, UT, 84056-5805, USA

Full Description

Show more

The Government requires manufacturing support to produce Digital Computer System Assembly (DCSA) enclosures. These fabricated parts will serve as the physical outer shell for an updated prototype of the Common Munition Bit Reprogramming Equipment (CMBRE) system.


See attachments for specifications.


In accordance with FAR 15.101(c)(3), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The Government will not reimburse respondents for any costs associated with submitting information in response to this notice.

More opportunities from Department Of Defense → FA8222 Afsc Ol H Pzie

Same awarding agency

NAICS: 238220
Federal
16292 Steam Boiler Replacement
Solicitation # FA822226Q3345
Solicitation FA8222-26-Q-3345 is a firm fixed price, total small business set-aside contract for the design and construction of a replacement heating system at Building 1515, Hill Air Force Base, Utah. The project objective is to transition the facility from an existing steam heat exchanger system to a more efficient, decentralized gas-fired hot water boiler system. The scope of work includes complete mechanical, electrical, and controls engineering, the demolition and disposal of existing steam systems, and the installation of high-efficiency boilers, such as the RBI Futera III, along with necessary piping and venting. The new system must be integrated into the facility's Direct Digital Control and Energy Management Control System via BACnet. The estimated project value is between 1 million and 5 million dollars. The period of performance is weather-dependent, with design and material acquisition required before the typical April-May steam shut-off, followed by a 60-day construction window. Award may be based on either Lowest Price Technically Acceptable or Best Value Trade-Off criteria, with the latter emphasizing technical soundness and a demonstrated history of similar design-build projects. Key requirements include the provision of a Utah-licensed Professional Engineer, adherence to Davis-Bacon Act wage determinations, and compliance with Hill AFB Installation Facilities Standards. Final acceptance is contingent upon successful system commissioning, delivery of as-built drawings, and the completion of operator training for government personnel.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

8 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS