Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

15200 Through 15244 West Sunset Boulevard

Forecast
BPW-2026-0271State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves a voluntary streetscape initiative along Sunset Boulevard in the Pacific Palisades neighborhood of Los Angeles, specifically between Monument Street and Strathmore Avenue, aimed at repairing sidewalks on both sides of the roadway within Council District 11. As part of the improvements, nine trees will be removed, including four Indian Laurel Fig trees, one Goldenrain tree, two Chinese Flame trees, one African Fern pine, and one Carrotwood tree. To mitigate environmental impact, a 2:1 replacement ratio is mandated, requiring that for every tree removed, two new trees be planted in its place. The work is being managed by the City of Los Angeles, with primary contact information provided through Hector Banuelos, Department Manager, and is forecasted to be posted on June 1, 2026. The project area is located in the 90272 ZIP code, and all activities are confined to this specific corridor within the community.

General Info

Sunset Boulevard streetscape project removes nine trees, replaces with 18 new ones, City of Los Angeles manages, starts June 1, 2026.

Agency

California → City of Los Angeles

Place of Performance

15200 Through 15244 Sunset Blvd., Pacific Palisades, CA, Los Angeles, CA, 90272

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts
Hector BanuelosDepartment Manager

Full Description

Show more
The project consists of a voluntary streetscape project including sidewalk repair on both sides of Sunset Boulevard from Monument Street to Strathmore Avenue within the Pacific Palisades Community in Council District 11. The project also proposes the removal of nine (9) trees which includes four (4)Indian Laurel Fig trees (Ficus microcarpa), one (1) Goldenrain (Koelreuteria paniculata), two (2) Chinese Flame (Koelreuteria Bipinatta), one (1) African Fern pine (Afrocarpus falcatus), and (1) one Carrotwood (Cupania anacardioides) tree. Tree replacements at a 2:1 ratio are required.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil and utility construction services, including underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, shoring, subsurface investigation, and site clearing. Additional requirements include surface improvements like asphalt paving, traffic signals, and landscaping, along with environmental support services such as storm water pollution prevention (SWPPP) and quality control. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must hold a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Certified DBE, MBE, WBE, or OBE firms must provide certification from an approved agency prior to the bid opening. Quotes will be considered from bidders who can maintain labor harmony on the project. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237310
New
SLED
803_2027 PLANT MIX - PRIMARY
Solicitation # CM827PMA129935
The Virginia Department of Transportation (VDOT) is soliciting bids for contract CM827PMA129935, titled 2027 Plant Mix - Primary, which involves the production and placement of Thin Hot-Mix Asphalt Concrete Overlay (THMACO) and Balanced Mix Design (BMD) surface asphalt concrete across various locations, specifically including Route 42. The scope of work includes the application of tack coat, sinusoidal asphalt rumble strips, and pavement markings, as well as flexible pavement planing. Contractors must be prequalified to bid and are required to submit a Job Mix Formula (JMF) for approval at least two weeks prior to production. Key technical requirements include meeting Performance + Volumetric Optimized criteria for specific mix types and ensuring a minimum film thickness of 9 microns. The contract is subject to several federal and state regulations, including the Davis-Bacon Act, the Buy America Act, and the Build America, Buy America Act (BABA). Contractors must comply with non-discrimination and equal opportunity provisions and are encouraged to partner with Small, Women-owned, and Minority-owned (SWaM) businesses. Administrative requirements include the use of a VDOT-approved inventory tracking system and the submission of performance test results via the PLAID website within 48 hours of sampling. Payment is structured through monthly progress estimates based on the contractor's name, with interest accruing at one percent per month. Liquidated damages for violations of the Contract Work Hours and Safety Standards Act are set at $33 as of January 15, 2025.
Virginia Department of Transportation

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
756_2027 PLANT MIX - INTERSTATE
Solicitation # IFB-131583
The Virginia Department of Transportation has issued solicitation IFB-131583 (Contract ID CM727PMD129554) for the 2027 Plant Mix - Interstate project. The scope of work focuses on the production and placement of Thin Hot-Mix Asphalt Concrete Overlay (THMACO) on Route 66 in Fauquier County. Key activities include preparing the pavement surface by removing debris and markings, filling irregularities deeper than one inch, and applying a tack coat of asphalt emulsion. The project requires the use of asphalt concrete mixtures from plants conforming to Section 211, with specific deliverables including ignition furnace calibration data and aggregate property test results. Performance is scheduled for completion by November 19, 2027, with strict work hour windows: Monday through Thursday from 9 AM to 5 AM, Saturday from 7 PM to 10 AM, and Sunday from 8 PM to 10 AM. The contract includes a variety of materials, such as SM12.5A and SM12.5E maintenance asphalt, IM19.OA maintenance asphalt, sinusoidal asphalt rumble strips, and temporary pavement markings. Quality acceptance is managed by the Engineer, who monitors binder content and nuclear density; corrective action is mandatory if density results fall outside the 98% to 102% range of the target control strip density. Administrative requirements include prequalification and electronic bid submission via Bidx by December 16, 2026. The contract is subject to the Davis-Bacon Act, including specific paid sick leave mandates, and adheres to Buy America and BABA requirements. Contractors must provide performance and payment bonds and certify compliance regarding debarment, suspension, and non-discrimination laws. All materials must be stored according to manufacturer instructions, and specific branding and certification standards apply to timber piles and material shipments.
Virginia Department of Transportation

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS