Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Defense was posted on May 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

16--WHEEL,LANDING GEAR, IN REPAIR/MODIFICATION OF

Closed
N0038326QHA56Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract pertains to the repair and modification of landing gear wheels for F/A-18 aircraft, specifically addressing the Nose Landing Gear (NSN 1630-01-265-3659, Part Number 2606071-5) and Main Landing Gear (NSN 1630-01-265-3660, Part Number 2609545-2). The work must be performed in accordance with established Government Furnished Information, including technical manuals such as A1-421AA-130-000 and A1-421AA-130-100, and must comply with FAA and industry standards, including the use of SAE-AS22759 wire in lieu of the prohibited MIL-W-81381. The contractor, RUAG Australia Pty Ltd, is responsible for all tooling, test equipment, and manufacturing aids required to complete repairs, and must adhere to strict quality assurance protocols, including a First Article Inspection process managed by DCMA and reviewed by FRCSW, which requires detailed documentation and photographic evidence of critical repair steps before final approval. The contract mandates a defined Repair Turnaround Time measured from physical receipt of the asset at the contractor’s facility, as recorded in the Commercial Asset Visibility system, with throughput requirements to be specified by the contractor for each NSN. All repairs require final Government inspection and acceptance. Compliance with Buy American, Equal Opportunity, and Security Prohibition clauses is required, along with mandatory use of Workflow Pro and adherence to warranty provisions offering one year of coverage following detection of defects. The contract also incorporates special provisions for national defense priority ratings and prohibits the use of outdated materials or methods. Solicitation number N0038326QHA56 was posted on May 28, 2026, with a submission deadline of June 29, 2026, and performance will be coordinated through the Naval Supply Systems Command Weapon Systems Support office in Philadelphia, Pennsylvania.

General Info

Repair or modification of eight landing gear wheels, sole-source, engineering-approved, FOB origin delivery.

Agency

Department Of Defense → Navsup Weapon Systems SupportView Agency

NAICS

336413 - Other Aircraft Parts and Auxiliary Equipment ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support
View Agency Profile
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
CONTACT INFORMATION|4|N722.28|B4H|771-229-0553|ABRIANNA.SALEH.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE ADN RECEIVING REPORTS COMBO||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|1 YEAR|45 DAYS OF DISCOVER OF DEFECT||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Required RTAT: (xx) days after reciept of asset Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initialdelivery commencesX/month (contractor fill in #). A throughput of 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS FRCSW will delegate the First Article Inspection to the DCMA for processes check FRCSW will review all of the FAT paperwork upon receipt from the completed DCMA witnessed inspection. The repair awardee will need to send FRCSW a copy of the paperwork and pictures of the part before and after identified critical processes/steps. FRCSW will create a list of processes after which they will require a report with pictures to be sent to FRCSW before final FAT approval. Note, FRCSW would look for a FAT part(s) that would have all of the critical processes. It could be more than 1 part for the inspection. 4. QUALITY ASSURANCE The overhaul facility address for RUAG is: RUAG Australia Pty Ltd, 836 Mountain Highway Bayswater, Victoria, 3153, Australia Compliance to the following publications: APPLICABLE PART NUMBERS: NSN:1630-01-265-3659 Part Number: 2606071-5 (Nose Landing Gear) NSN:1630-01-265-3660 Part Number: 2609545-2 (Main Landing Gear) REPAIR MANUAL/PROCEDURES/TECHNICAL DATA:Overhaul IAW with the following Government Furnished Information (GFI) Technical Data: F/A-18A-D Intermediate and Depot level maintenance with illustrated parts breakdown tired Main Landing Gear Wheel A1-421AA-130-000/Release 15 Feb 2014 F/A-18A-D Intermediate and Depot level maintenance with illustrated parts breakbreak down tired Main Landing Gear Wheel A1-421AA-130-000/Release 15 Feb 2014 F/A-18A-D Intermediate and Depot level maintenance with illustrated parts breakdown tired Nose Landing Gear Wheel A1-421AA-130-100/Change 1/Release 1 Aug 2017 ANALYSIS PROCEDURES AND REFERENCES: Requests for repair deviation will be submitted to the FST for review IAW the following GFI and Paragraph 3.3.5: Request for Deviation. NAVAIR PUBLICATION: NAVAIR NI Structures Standard Operating Procedure, SOP F18 AG-002-11, Rev A with amendments 1 and 2. METHODOLOGY REFERENCES MACAIR- Report Number 339, Structures Handbook, dated 1 June 1973 MACAIR-Report 338, Structural Analysis Bulletins, dated 1 June 1973 MDC-8500 DEPOT Fatigue Information Report, dated 14 July 1986 F/A-18 Hornet Fatigue Analysis Procedure Manual (FAPM), REV D,dated 21 February 2014. FRCSW will delegate the First Article Inspection to the DCMA for processes check FRCSW will review all of the FAT paperwork upon receipt from the completed DCMA witnessed inspection. The repair awardee will need to send FRCSW a copy of the paperwork and pictures of the part before and after identified critical processes/steps. FRCSW will create a list of processes after which they will require a report with pictures to be sent to FRCSW before final FAT approval. Note, FRCSW would look for a FAT part(s) that would have all of the critical processes. It could be more than 1 part for the inspection. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS