Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on March 8, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

16S Nozzle Contour Study

Closed
FA9101-18-R-0045Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Fire Alarm engineering for Lewis County
Solicitation # 2026-RFQ-040
Lewis County is soliciting qualifications under solicitation 2026-RFQ-040 for a professional engineering firm to provide comprehensive design and engineering services for fire alarm systems. The project encompasses several County-owned facilities, including the IT Building, Historic Courthouse, Health Building, and Lewis County Jail. The selected firm will be responsible for conducting on-site evaluations to determine the remaining useful life of existing systems, assessing code compliance with NFPA 72, IBC, and IFC standards, and developing bid-ready construction drawings and technical specifications. All designs must be stamped by a licensed electrical engineer familiar with Washington State fire alarm requirements and must integrate smoothly with existing infrastructure to ensure standardized maintenance and operations. Proposals are due by November 10, 2026, via the OpenGov platform and will be evaluated by a committee of at least three County employees using a points-based system. The evaluation criteria are equally weighted at 20 percent each across four categories: firm qualifications (including NICET certifications and licensed engineer availability), responsiveness and capacity to begin work within 30 days, regulatory compliance and permitting records, and the clarity and detail of blueprint designs. Applicants must provide a statement of qualifications, three public agency references from the last five years, and resumes of key personnel. The contract is administered by Matt Patana, Capital Infrastructure Specialist, based in Chehalis, Washington.
Capital Infrastructure

POSTED

about 15 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
International
Provision of Consulting Services for Regional Basement Flooding Mitigation Program Strategic Plan
Solicitation # P-1353-26
The Region of Halton is soliciting proposals for a consulting firm to conduct a comprehensive review of its existing Basement Flooding Mitigation Program and develop a three-year Strategic Plan. The primary objectives are to reduce basement flooding risks, enhance wastewater system resilience, and decrease wet-weather flows. The project is expected to be completed within nine months of kick-off and includes key deliverables such as a current-state assessment report, a prioritization framework for initiatives, a final strategic plan with an implementation roadmap, and a performance measurement and reporting framework. The selected consultant must provide a Project Manager with PMP certification or equivalent credentials. The contract will be awarded based on a scoring system where the technical proposal accounts for 80 points and the cost proposal accounts for 20 points. Proponents must achieve a minimum technical score of 70% to be considered for award and may be invited to a 30-minute presentation. Mandatory submission requirements include a technical proposal, a signed Vendor Code of Conduct Acknowledgement Form, and a cost proposal submitted via the online bidding system by November 12, 2026. The agreement is governed by a modified Standard Agreement and Supplementary Conditions, requiring the consultant to maintain specific insurance coverages: 5 million dollars for Commercial General Liability, 2 million dollars for Automobile Liability, and 2 million dollars for Professional Liability. Additionally, the consultant must provide a WSIB clearance certificate upon award and with every monthly electronic invoice. All produced materials remain the sole property of the Region of Halton, and deliverables must comply with the Ontario Building Code and the Accessibility for Ontarians with Disabilities Act.
Region of Halton

POSTED

about 17 hours ago

DEADLINE

in 23 days
NAICS: 541330
New
SLED
REQUEST FOR PROPOSAL (RFP) STAR Centre Energy Modernization Project Energy Audit
Solicitation # BPM059233
The City of Havre de Grace is seeking proposals for a comprehensive energy audit of the STAR Centre, the city's largest public building, as the first phase of an Energy Modernization effort. This grant-funded project, supported by the Maryland Energy Administration Local Government Energy Modernization Program Grant 52-600796, requires a contractor to perform an ASHRAE Level 1 walkthrough Energy Audit. The scope includes documenting baseline operating conditions, analyzing utility billing data, evaluating eligibility for utility rebates, and providing a detailed report of energy efficiency measures for lighting, HVAC, and building envelope weatherization. Additionally, the contractor must develop a Monitoring Based Commissioning Plan (MBCx) to support future energy management and continuous performance monitoring. The contract will be awarded based on the best value to the city, considering the technical approach, cost factor, and the bidder's experience. Eligible offerors must be established businesses with at least five years of industry experience and must be in good standing with the State of Maryland, Harford County, and the City of Havre de Grace. Required submission documents include a Maryland Business License, a Certificate of Good Standing, an IRS W-9, and evidence of insurance covering General Liability, Workers' Compensation, and Errors and Omissions. Proposals must be submitted electronically via Beacon Bid by November 23, 2026. The selected vendor must be able to complete the audit and deliverables within a 60-day period, with a final project completion deadline of February 5, 2027. Payment will be made upon the successful completion of services, with the possibility of progress payments based on a satisfactory schedule.
City of Havre de Grace

POSTED

about 17 hours ago

DEADLINE

in about 1 month

General Info

Agency

N/A

NAICS

541330 - Engineering Services

Place of Performance

ARNOLD AFB, TN, 37127, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

special-notice

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts

Full Description

Show more
REQUEST FOR INFORMATION (RFI) FA9101-18-R-0045, Supply Flow Quality and Increased Mach Number Design and Analysis for Arnold Engineering Development Complex (AEDC) Wind Tunnel 16S 26 February 2018 THIS ANNOUNCEMENT IS NOT A NOTICE OF SOLICITATION ISSUANCE. THIS IS A REQUEST FOR INFORMATION (RFI) FOR PLANNING PURPOSES ONLY. This RFI is ISSUED for the purpose of developing a viable solicitation that will best communicate the Government's requirements to industry. Response to this RFI is strictly voluntary and will not affect any firm's ability to submit an offer if, or when, a solicitation is released. The requested information is for planning purposes only and does NOT constitute a commitment, implied or otherwise, that a procurement action will be issued. No entitlement to payment by the Government of direct or indirect costs or charges will arise as a result of the submission of information in response to this RFI. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations. Formal notices will be on posted on the Federal Business Opportunities (FBO) website, http://www.fbo.gov/ . GENERAL INFORMATION: The Air Force Arnold Engineering Development Complex (AEDC) is in the process of determining the acquisition strategy for the design and analysis of improved nozzle contours for improved flow quality as well as design and analysis for increasing the Mach number capability to Mach 6 from Mach 4.75. System Description: Supersonic Wind Tunnel 16S AEDC's Propulsion Wind Tunnel (PWT) Tunnel 16S is continuous flow, variable density, wind tunnel with Mach number range of 1.5 to 4.75. Maximum stagnation pressure varies with Mach number to a maximum of approximately 1 atm. Maximum stagnation temperature is approximately 600 degF. Tunnel 16S has a 2-D flexible Laval nozzle that is approximately 100 feet long and has a square 16 foot by 16 foot exit. The nozzle contour is set with two rows (top and bottom) of 27 jack station on each side (east and west) for a total of 108 jacks). In addition at station 0 there are a total 8 additional slope jacks. Each flexible wall consist of six sections 8 feet wide that are joined together so that the total is 16 feet in height. The four sections of plate are jointed together with pin lap joints. The lap joints have a lower working stress than the continuous section of the plates, thus limiting the amount of curvature the nozzle contour can have in lap joint regions. Nozzle flexible plate that is in the throat section contains a pre-bend to accommodate the higher curvature required in this region. Two of the limiting factors of the nozzle contours exceeding Mach number of 4.75 are the limited travel capability of the nozzle's downstream hinge (jack station 7) and the non-operability of slope jacks at station 0. It was discovered in the 1960s as the nozzle contour approaches Mach number 5.0 the downstream hinges did not extend sufficiently. Modifications to this hinge were designed and built circa 1970, but never installed. This hardware remains in storage at AEDC. The station 0 slope jacks have been practically non-operational since IOC (1960). These slope jacks have been in a locked positon since the 1960s. Program Description The AEDC 16S Improved Flow Quality and Extended Mach Number Project has been initiated and is funded by the United States Air Force Test Investment Planning and Programming (TIPP) process. This RFI covers the analysis and design of improved nozzle contours and improvements to existing nozzle structure to support increased Mach number service. The primary objectives of this program are: - 1. Conduct an aerodynamic analysis to design new nozzle contours. The new contours shall be designed to meet the flow requirements shown in Table 1. The contractor shall submit a final report which includes nozzle contour points on the air side surface at the jack locations, jack pin positions, jack lengths, jack loads, tape indicator lengths, indicator tape readout, station zero angle. - 2. A trade study shall be conducted of, at least, the following nozzle design approaches. Others may be included with prior Government approval : - a. Sivells, J. C., "A Computer Program for the Aerodynamic Design of Axisymmetric and Planar Nozzles for Supersonic and Hypersonic Wind Tunnels." AEDC-TR-78-63, December 1978. - b. Evvard, J. and Marcus, L. "Achievement of Continuous Wall Curvature in Design of Two-Dimensional Symmetrical Supersonic Nozzles." NACA TN-2616, January 1952. - c. Korte, J., "CAN-DO, CFD-Based Aerodynamic Nozzle Design & Optimization Program for Supersonic/Hypersonic Wind Tunnels." AIAA 92-4009, July 1992. - d. Varner, M., "Application of Optimization Principles to Flexible Wall Nozzle Design - A Case Study." AIAA 86-0775. - e. Current state of the art CFD optimized contours The trade study shall include cost, schedule, and accuracy of the approach. The trade study shall include engineering judgment and citation of research into the potential approaches to determine the top two approaches. The contractor shall utilize the top two approaches to characterize the Mach 1.6 and 4.0 contours in order to show the expected difference in flow quality. TABLE 1 - FLOW QUALITY REQUIREMENTS Required for Temperatures from 120F to 650F Spatial Mach Uniformity Spatial Flow Angle Uniformity, deg 1.5 ? M ? 3 0.2%, 0.4% 0.05, 0.1 3 < M ? 6 0.5%, 1% 0.1, 0.2 - 3. Create a nozzle contour design tool capable of fully characterizing the aerodynamic contour jack points, optimizing the contour as required by the chosen method, and verifying that the contour will meet the stated flow quality criteria. The tool shall also be capable of providing preliminary plate stress analysis as an optimization tool such that each preliminary contour is not required to undergo a detailed FEA (Finite Element Analysis). The contour design tool shall not require the Government to procure additional software and Government purpose data rights shall be given along with the tool. Detailed instructions on the use of the design tool shall be provided to the Government. - 4. Review the existing design to allow the nozzle to move up to the Mach 6 contour. This shall include the suitability of the redesigned downstream gate, the suitability of the current actuators for length and load rating of the existing design to allow the nozzle to move up to the Mach 6 contour. - 5. Review the station zero slope jack design. This shall include necessity of moving the slope jacks for both flow quality downstream of the nozzle exit plane and plate stress up to Mach 6. A trade study shall be conducted between repairing the current system vs a re-design. - 6. Perform design and analysis on any portion of the plate system which must be redesigned to allow Mach 6 operation. This may include but is not limited to, increased jack lengths, improvements to the downstream gate, and improvements to the station zero jack assembly. - 7. Conduct a thermal analysis of the nozzle and fixed walls to determine the effectiveness and need for the strip heaters which were installed to prevent high thermal stresses during hot operation. This analysis may require incorporation with the aerodynamic model to determine if plate jack length adjustments must be made to meet flow quality requirements at high temperatures. This analysis shall be incorporated with the structural analysis to determine plate thermal stresses. - 8. Conduct a structural analysis of the nozzle including plate stress analysis, determination of expected jack loads, and confirmation of the suitability of the plate protection system. The plate protection system study shall include validation of the current system settings and that the system protects from a runaway condition of up to 3 sequential jacks. The plate protection system limits are particularly important regarding the protection of the nozzle plate vertical lap joints as these joints potentially limit plate contours particularly at high Mach numbers. PURPOSE: AEDC intends to use the information gathered from this effort to begin to assess capabilities and interests in all aspects of the work to be performed, in order to begin formulating an acquisition strategy for a potential follow-on contract(s). In order for AEDC to begin its assessment, please respond to as many of the following questions as you can/or are applicable to your company: - 1. Complete Table 2 on the following page for each Attachment 1 Work Breakdown Structure (WBS) Element in accordance with the following instructions: - a. Capable - Does your company have the capability to perform the design and analysis for AEDC? If you have only a partial capability, indicate the extent of the capability. List any capabilities which you would team with an outside contractor. - b. Interested - Is your company interested in potentially competing for the entire scope of this effort or a portion thereof? - c. Total Experience - How many years has your company performed this type of work? - d. Government experience - How many years has your company performed this type of work on a Government contract? - e. Minimum Contract Length - To be worthwhile to your company, what is the minimum contract length you would recommend? Table 2 - WBS for Improved Flow Quality and Increased Mach Number Operation WBS Element Capable In total or in part? Interested In total or in part? Total Experience Gov't Experience (contracts) Recommended Contract Type Minimum Contract Length 1. Aerodynamic Analysis 1.1 Supersonic Mach Number Contour Generation 1.2 Familiarity with the approaches requested 1.3 Ability to verify flow quality of proposed contours 1.4 Ability to produce a design tool for generating contours 1.5 Tooling Fabrication for Composite Structure Manufacturing 2. Mechanical Design 2.1 Structural Design 2.2 Mechanism Design 3.1 Thermal Analysis 3.1 Thermal Analysis 3.2 Combined Thermal/Structural Analysis 4. Structural Analysis 4.1 Structural Analysis of flexible nozzle plates 4.2 Structural Analysis of mechanisms - 2. Please describe any involvement your company may have had in contracts similar in nature to the areas in which you have expressed an interest. - 3. When you respond to this RFI, please identify the North American Industry Classification System (NAICS) code you think is appropriate for the areas in which you have expressed an interest. - 4. How many employees does your company have? - 5. Attached is the current AEDC Organizational Conflict of Interest (OCI) clause for your reference (Attachment 2). - a. Please comment on any issues/concerns/challenges you have with the current wording of the clause. - b. What should the Government be considering in terms of possible changes to this clause? - 6. What topics would you like to have discussed in future Government/contractor meetings? Please include the following with your response: Name and address of firm Point of contact and telephone number Average annual revenue for the past three years and number of employees Business size (per question 12) Affiliate information: Parent company Joint venture partners Potential teaming partners Please submit any additional comments or suggestions that you would like to share with us regarding this acquisition. Email your responses to the Contract Specialist, Ms. Stacey Lamb at stacey.lamb.1@us.af.mil and the Contracting Officer, Mr. Adam Foret, at adam.foret.1@us.af.mil by close of business on 5 April 2018. Please note that official information regarding this acquisition will be provided by the Contracting Officer. Any information received from other sources should not be relied upon as official. Any questions/comments received from industry will NOT be posted on public web sites. Further information and descriptions of AEDC facilities may be found on our web site www.arnold.af.mil by following the link in the center of the page under Spotlights to the Test Facilities Guide.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS