Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on August 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

18" Corrugated Steel Pipe Supply and Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to provide structural repairs and planned maintenance for Blackpool Tower, with an estimated total value of 4,000,000 GBP including VAT. The project is divided into three phases: a Winter Works package from November 2026 to March 2027 during operational closure, a Summer Works package from April 2027 to November 2027 during the operating season, and ongoing ad-hoc maintenance beyond November 2027 based on annual surveys. The initial period of performance runs from November 30, 2026, to November 29, 2027, with a possible one-year extension to November 29, 2028. The contract is an open competition with award criteria weighted at 50 percent Quality, 40 percent Price, and 10 percent Social Value. Mandatory requirements include IRATA level 3 qualified supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or Institution of Structural Engineers. Suppliers must maintain insurance coverage of 10 million GBP for Employer's Liability and Public Liability, and 5 million GBP for Professional Indemnity. All work must adhere to strict technical and safety standards, including BS EN 1090 Execution Class 3 for steel structures, CDM 2015, and the Work at Height Regulations 2005. The deadline for tender submissions is November 20, 2026.
Blackpool Borough Council

POSTED

about 4 hours ago

DEADLINE

in 23 days
NAICS: 238120
New
SLED
Corpyard Phase II Connex Structural Anchoring & Welding: (Rebid)
Solicitation # 26-091-ITB
The City of West Sacramento has issued solicitation 26-091-ITB for the Corpyard Phase II project, which requires the structural anchoring and welding of 14 existing shipping containers to a cement-treated asphalt surface. The scope of work includes container pre-checks, drilling and hole cleaning, the installation of Bolthold asphalt substrate, bolting down ASTMA36 plates using epoxied steel rods, and performing AWS welding to secure the plates to the container framing. To prevent corrosion, the contractor must apply a zinc-rich cold galvanizing rust-inhibiting coating. All work must be performed by a licensed contractor holding a current California C-51 or C-60 license and must adhere to PSE stamped drawings, structural calculations, and standards including ASCE 7-22, CBC 2022, and AISC 360-16. Final acceptance is contingent upon a successful inspection by the City's Building department. The estimated project value is 35,000 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. Bids must be submitted electronically via the OpenGov portal by November 10, 2026, at 1:00 pm, and must include a bid security of at least 10 percent of the total bid price. The successful bidder is required to provide performance and payment bonds equal to 100 percent of the contract price and must comply with California prevailing wage requirements and DIR registration. Additionally, the contractor must utilize the Virtual Project Manager system for submittals and maintain comprehensive insurance coverage, including Commercial General Liability and Workers Compensation. As a federal-aid construction project, the contract mandates strict adherence to FHWA-1273 provisions, including nondiscrimination and equal employment opportunity policies.
Capital Projects - Construction

POSTED

about 9 hours ago

DEADLINE

in 13 days
NAICS: 238120
New
SLED
EVA DELL BARRIER ACCESS GATES
Solicitation # MS27-052
The City of Victorville is soliciting bids under solicitation number MS27-052 for the fabrication and installation of four steel barrier access gates at Eva Dell Park. The project aims to enhance security and access control through the installation of one 31-foot gate, one 35-foot gate, and two 37-foot gates. All gates must be constructed using Schedule 40 steel pipe and include necessary structural framing, support posts, hinges, locking hardware, hold-open mechanisms, and concrete footings. Contractors are required to field-verify all measurements and coordinate final configurations and protective finishes with the City prior to fabrication. The project is funded by the Community Development Block Grant program and requires compliance with the Build America, Buy America Act, the Davis-Bacon Act, and California state prevailing wage laws. The contract will be awarded to the lowest responsive and responsible bidder based on the total summation of all individual line items. Bidders must submit their proposals electronically via the City's eProcurement Portal by December 3, 2026, at 3:00 pm. Required submission materials include a bid bond of 10 percent of the total bid price, a non-collusion declaration, and various certifications regarding labor and federal compliance. The successful contractor must provide faithful performance and payment bonds for 100 percent of the bid price and maintain workers compensation insurance per California state law. The City encourages participation from small, minority, and women-owned businesses.
City of Victorville

POSTED

about 13 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This subcontract opportunity with the State of California Department of Transportation involves the supply and installation of 110 linear feet of 18-inch diameter corrugated steel pipe. The project is specifically designed for drainage or culvert applications within a highway environment and is categorized under NAICS code 238120. The solicitation was posted on August 3, 2026, with a response deadline of September 2, 2026. Performance of the work will take place in California, specifically within the 94965 zip code area.

General Info

Caltrans subcontract for installing 110 feet of corrugated steel pipe in California.

Documents

This scope was carved out of 04-3AA504.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction On State Highway In Marin County Near Muir Beach At Green Gulch

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and install 110 linear feet of 18-inch diameter corrugated steel pipe for drainage or culvert applications in highway environment.

More opportunities from California → STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Santa Barbara County Near Santa Ynez From 0.1 Mile North Of Route 246 To 0.1 Mile South Of Route 246
Solicitation # 05-1R5704
Solicitation 05-1R5704 is a unit price basis construction project issued by the California Department of Transportation for upgrades to State Highway 154 in Santa Barbara County, specifically from 0.1 mile north to 0.1 mile south of Route 246. The estimated project cost is 820,000 dollars, with a required completion timeframe of 50 working days. The scope of work includes installing lighting, striping, and signage upgrades, as well as micro-surfacing, tack coat application, and extensive pavement delineation. Additional technical requirements involve the installation of Cast-In-Drilled-Hole concrete piles, modifications to flashing beacon systems, and the implementation of erosion control measures such as hydroseed and compost application. The project mandates comprehensive temporary traffic control, including the use of portable radar speed feedback signs and portable changeable message signs. Contractors must adhere to Buy America/Build America standards and provide Environmental Product Declarations for concrete and hot mix asphalt. Labor must be compensated according to the higher of the California DIR general prevailing wage rates or the U.S. Secretary of Labor federal minimum wage rates. Bids must be submitted electronically via the Bid Express website by 2:00 p.m. on November 19, 2026, and must include bidder security equal to at least 10 percent of the bid. Quality control personnel are required to hold ACI Concrete Field-Testing Technician Grade 1 certification, and all survey coordinates must meet specific North American Datum and Vertical Datum accuracy standards.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 22 days
View Details
NAICS: 237310
SLED
Bridge Overlay, Approach Slab, Joint Seal, HMA, And Cold Plane Construction On State Highway In Merced County At Various Locations
Solicitation # 10-1T2904
Contract 10-1T2904 is a solicitation by the California Department of Transportation for bridge overlay, approach slab, joint seal, hot mix asphalt (HMA), and cold plane construction at various locations in Merced County, specifically along Routes 99, 152, and 165. The project has an estimated cost of 2,220,000 dollars and a completion timeframe of 75 working days. Key technical requirements include the application of polyester concrete overlay, the use of PG 64-10 asphalt binder for Type A HMA, and strict adherence to 2025 Standard Specifications and Plans. The scope also involves specialized handling and labeling of asbestos-containing materials in compliance with California Code of Regulations. Bids must be submitted on a unit price basis by November 10, 2026, and must include bidder's security of at least 10 percent. Eligible bidders must hold a Class A license or a combination of Class C-8 and C-12 licenses. The contract establishes a 5 percent Small Business Enterprise (SBE) participation goal and a 3 percent Disabled Veteran Business Enterprise (DVBE) goal, with specific preferences available for contractors committing to 25 percent SBE participation. Additional requirements include the payment of prevailing wages, the submission of a Public Safety Plan, and the procurement of an encroachment permit from the City of Atwater. Quality control requires personnel to hold ACI Concrete Field-Testing Technician Grade 1 certification.
Highway, Street, and Bridge Construction

POSTED

9 days ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS