Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

18th Avenue Reconstruction: Earl Street To Sierra Street

Closed
20260806026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The project involves comprehensive pavement rehabilitation along 18th Avenue in Kingsburg, California, from Earl Street to Sierra Street, with work encompassing asphalt concrete grinding and overlay, installation of pavement fabric, reconstruction of curb ramps, curb and gutter, and sidewalks, along with utility adjustments, pavement delineation and striping, replacement of drainage inlets, and restoration of traffic signal loop detectors as needed. All work must strictly adhere to the City of Kingsburg Standard Specifications, 2025 California Department of Transportation Standard Specifications and Standard Plans, the California Manual on Uniform Traffic Control Devices 2026, and referenced local standards such as ST-23 for sidewalks, ST-30 for curb, ST-31 for detectable warning surfaces, and W-9 for fire hydrant markers. Permanent pavement markings must be installed 21 to 30 days after placement of hot mix asphalt, and irrigation and landscaping must be maintained for one year following project completion. The place of performance is firmly established at the 18th Avenue corridor within Kingsburg’s 93631 zip code, and inspections and acceptance occur on-site, with the contractor bearing full responsibility for ensuring compliance. While the solicitation includes detailed technical requirements and referenced standards, it lacks federal acquisition regulation clauses, pricing information, contract value, period of performance dates, and formal sectioning for evaluation factors, packaging instructions, or certification requirements typically found in federal contracts. Proposals must be submitted by August 25, 2026, through the City of Kingsburg’s designated process, with the project engineer, Quinn Vosmera, serving as the primary point of contact. No formal attachments list, payment details, accounting codes, or contracting officer information are included, and the solicitation operates under municipal rather than federal procurement frameworks.

General Info

Pavement rehabilitation on 18th Avenue in Kingsburg includes asphalt overlay, curb ramps, drainage, striping, and compliance with state standards.

Place of Performance

Kingsburg, CA, 93631, USA

Set-Aside

NONE

Documents

2

18th Avenue Reconstruction Plans

PDF, High priority: read this firstspecifications
High

18th Avenue Reconstruction Specifications - STPL 5170(070)

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Kingsburg
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Quinn VosmeraProject Engineer

Full Description

Show more
Bid #STPL 5170(070): The project involves pavement rehabilitation along 18th Avenue from Earl Street to Sierra Street. Key work items include asphalt concrete grinding and overlay, installation of pavement fabric, reconstruction of curb ramps, curb and gutter, and sidewalks. The scope also covers utility adjustments, pavement delineation and striping, replacement of existing drainage inlets, and replacement of existing traffic signal loop detectors as needed. All work must comply with City of Kingsburg Standard Specifications, 2025 State of California Department of Transportation Standard Specifications, City of Kingsburg Standard Plans, California Manual on Uniform Traffic Control Devices 2026, and 2025 State of California Department of Transportation Standard Plans. The intent is to deliver a finished project to the highest industry standards.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS