18th Green Bridge Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project entails the removal of the existing failed pedestrian bridge on the Tahoe Donner Golf Course’s 18th green and the installation of a new bridge to safely cross Trout Creek. Alongside the bridge replacement, comprehensive erosion control measures will be implemented along both banks of the creek to stabilize the deteriorated stream banks and mitigate further environmental impact from ongoing erosion. The work is designed to restore functional access for pedestrians while addressing ecological concerns tied to creek bank degradation. The project is forecasted by the Regional Water Quality Control Board, Region 6 – South Lake Tahoe, under the California state authority, with the performance location in Truckee, California, zip code 96161. The primary point of contact for inquiries is Meghan Walsh, Engineering Geologist, who can be reached via phone or email for further details. The project was posted on September 2, 2025, and is part of broader efforts to improve infrastructure and environmental resilience in the area.
General Info
Agency
NAICS
Place of Performance
12850 Northwoods Blvd., Truckee, CA, 96161Set-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
