Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

18th Green Bridge Improvements

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project entails the removal of the existing failed pedestrian bridge on the Tahoe Donner Golf Course’s 18th green and the installation of a new bridge to safely cross Trout Creek. Alongside the bridge replacement, comprehensive erosion control measures will be implemented along both banks of the creek to stabilize the deteriorated stream banks and mitigate further environmental impact from ongoing erosion. The work is designed to restore functional access for pedestrians while addressing ecological concerns tied to creek bank degradation. The project is forecasted by the Regional Water Quality Control Board, Region 6 – South Lake Tahoe, under the California state authority, with the performance location in Truckee, California, zip code 96161. The primary point of contact for inquiries is Meghan Walsh, Engineering Geologist, who can be reached via phone or email for further details. The project was posted on September 2, 2025, and is part of broader efforts to improve infrastructure and environmental resilience in the area.

General Info

Remove failed pedestrian bridge, install new one over Trout Creek, implement erosion control on both banks in Truckee, California.

Agency

California → Regional Water Quality Control Board, Region 6 - South Lake Tahoe

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

12850 Northwoods Blvd., Truckee, CA, 96161

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 6 - South Lake Tahoe
Contacts1 person available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 6 - South Lake Tahoe
Office AddressN/A
Contacts
Meghan WalshEngineering Geologist

Full Description

Show more
The purpose of this Project is to remove components of an existing failed pedestrian bridge and install a new pedestrian bridge on the Tahoe Donner Golf Course’s 18th green, in order to cross Trout Creek. Additionally, the Project proposes to stabilize the creek banks which have been impacted by erosion through the installation of erosion control measures along each bank of the creek.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS