Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity was posted on June 13, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

19 - LONG LEAD TIME MATERIAL AND DETAIL DESIGN AND CONSTRUCTION OF LPD 31 AMPHIBIOUS TRANSPORT DOCK SHIP

Closed
N00024-19-R-2424Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation is soliciting proposals for the complete repower of a 30 foot Munson landing craft. The selected contractor will be responsible for the decommissioning and removal of two existing Honda BF250A outboard engines and the procurement and installation of two new Honda BF250D Drive-by-Wire outboards. The scope of work is divided into six phases, encompassing structural transom inspections, the installation of Honda iST electronic control heads at dual helm stations, integration with the SeaStar Power Assist steering system, and a comprehensive fuel system overhaul using USCG Type A1-15 lines. The project concludes with NMEA 2000 network integration, digital gauge installation, and a minimum two hour sea trial to validate performance and safety protocols. To ensure factory warranty coverage, the contractor must maintain active Honda Marine Authorized Dealer or Service Center status. The vessel will be delivered via trailer to the contractor facility, which must provide a secure, fenced yard or indoor shop. Award evaluation is based on a weighted criteria of cost, technical expertise, and TERO status, with a preference for Colville Business Enterprises. Proposals must be submitted in PDF format by November 13, 2026. Final contracts are subject to tribal appropriation and may require a performance bond for values exceeding 100,000 dollars or a 25 percent retainage.
Confederated Tribes of the Colville Reservation

POSTED

about 8 hours ago

DEADLINE

in 24 days
NAICS: 336611
New
Federal
USCGC CROCODILE DD2 FY27 #1 MDE W5
Solicitation # 70Z08027PBPLCROCODILE
The Department of Homeland Security, through the U.S. Coast Guard Surface Forces Logistics Center, has issued a Sources Sought Notice under solicitation number 70Z08027PBPLCROCODILE to conduct market research for drydock and dockside repairs to the USCGC CROCODILE (WPB-87369). This notice is intended to identify capable sources, determine the availability of suitable commercial items, and understand current commercial practices to inform future competition and set-aside decisions. The anticipated scope of work includes 34 specific items, such as Main Diesel Engine W-5 maintenance, propulsion shaft and rudder assembly renewal, 100 percent underwater body and hull plating preservation, tank cleaning, and the provision of drydocking and sea trial support. The anticipated period of performance is 63 calendar days, scheduled from April 20, 2027, to June 22, 2027. All work is to be performed at the contractor's facility with no geographical restrictions. Interested firms under NAICS code 336611, which has a size standard of 1,300 employees, must submit capability statements, business size certifications, and past performance information by October 21, 2026. This notice does not constitute a formal solicitation or an obligation for the government to take further action, and potential offerors are advised to monitor Sam.gov for any future solicitations.
CG-SEA-C21

POSTED

about 11 hours ago

DEADLINE

in about 16 hours

General Info

Agency

N/A

NAICS

336611 - Ship Building and Repairing

Place of Performance

1000 Access Road, PASCAGOULA, MS, 39567, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Presolicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Anthony C. O'RourkeContracting Officer
Troy BalkContract Specialist

Full Description

Show more
The Naval Sea Systems Command intends to issue solicitation N00024-19-R-2424 to Huntington Ingalls Incorporated, acting through its Ingalls Shipbuilding division (HII), 1000 Access Road, Pascagoula, MS 39567 for Long Lead Time Material (LLTM) for LPD 31 and a follow-on solicitation for the Detail Design and Construction (DD&C) of the LPD 31 Amphibious Transport Dock Ship. The LX(R) requirement that was developed to replace the retiring LSD 41/49 Class amphibious ships will be fulfilled with a SAN ANTONIO Class Flight II. LPD 30 is designated as the lead ship, and LPD 31 will be the second Flight II ship. As the designer, builder, and life cycle engineering and support provider of the entire SAN ANTONIO Class Flight I and the lead Flight II ship, HII is the only source with the requisite knowledge and experience required to construct LPD 31. Pursuing an alternate source through competition would result in significant duplication of costs and unacceptable delays due to the loss of design expertise and production efficiencies achieved on the previous 14 ships that cannot be recovered on the second planned ship of LPD 17 Flight II. No other vendor possesses the requisite facilities and qualified cadre of engineers, designers, and a construction workforce that can design, plan, construct, test, and deliver current and future amphibious ships. The primary purposes of the notice are to improve small business access to acquisition information and enhance competition by identifying subcontracting opportunities. The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source under authority of FAR 6.302-1. This notice of intent is not a request for competitive proposals. However, all responsible sources may submit a capability statement, proposal, or quotation within fifteen days after date of publication of this synopsis, which shall be considered by the Government. The Government will not reimburse respondents for any questions submitted or information provided because of this notice. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS