Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

1U060 STA-33 Pavement and Shoulder Work

Forecast
1U060State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation (Caltrans), District 10, is proposing a maintenance project titled 1U060 STA-33 Pavement and Shoulder Work located in Stanislaus County. The project focuses on State Route 33 at two specific locations, from Postmiles 7.17/12.4 and 13.78/14.7, within the cities of Patterson and Crows Landing. The primary objective is to repair failing or damaged pavement and facilities to prevent further deterioration and extend the highway's service life. The scope of work includes edge-to-edge Partial Depth Recycling (PDR) topped with a Rubberized Hot-Mix Asphalt-Gap Graded overlay cap, as well as the placement of shoulder backing to replenish existing shoulders and eliminate drop-offs. All activities will be conducted within the Caltrans Right of Way. The project is classified as a forecast under NAICS code 237310 and has been determined to be categorically exempt under CEQA Section 15301 and NEPA regulations, with no significant environmental impacts anticipated. Key compliance requirements include following Caltrans Standard Special Provisions 7-1.02K(6)(j)(iii) for earth material containing lead and SSP 36-4 for the removal of traffic striping and pavement markings. Strict protocols are in place for the discovery of cultural resources or human remains, requiring immediate work stoppage within a 60-foot radius and notification of the Engineer or County Coroner. Maria Garcia Lopez serves as the primary environmental point of contact for the project.

General Info

Caltrans District 10 pavement and shoulder repairs on State Route 33, Stanislaus County.

Agency

California → Caltrans, District 10 - Stockton

Place of Performance

Patterson, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 10 - Stockton
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 10 - Stockton
Office AddressN/A

Full Description

Show more
The California Department of Transportation (Caltrans) proposes a maintenance project in Stanislaus County, on State Route (SR) 33 at 2 locations from Postmiles (PM) 7.17/12.4 and 13.78/14.7. The scope of work consists of Partial Depth Recycling (PDR) from edge-to-edge pavement and Rubberized Hot-Mix Asphalt-Gap Graded overlay cap on top of the PDR. The project will also place shoulder backing along the edge of pavement to replenish existing shoulder and eliminate drop-off as needed. All work will be done within Caltrans Right of Way. The purpose of this project is to repair areas of failing or damaged pavement and facilities. The project is needed to prevent further deterioration of the paved highway surface and extend the service life of SR 33.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Opportunity to quote asphalt repairs_Laura Street Sewer Improvements Project
Solicitation # opportunity-quote-asphalt-repairslaura-street-sewer-improvements-project
D.R. Phillips, LLC is soliciting quotes from qualified asphalt paving contractors for the Laura Street Sewer Improvements project located in Robbinsville, North Carolina. This request is specifically for bidding purposes to help the prime contractor prepare their project bid. The scope of work includes asphalt pavement replacement, restoration, milling, removal, and the placement of surface and binder courses. Additionally, contractors will be responsible for pavement patching, trench restoration, hauling, compaction, and the application of tack coats, along with other incidental asphalt-related tasks necessary for project completion. Interested parties must submit their proposals by November 27, 2026. Submissions should include company contact information, itemized pricing for the asphalt work, equipment and workforce availability, and evidence of relevant experience with municipal sewer, utility, and roadway restoration projects. While all contractors are encouraged to apply, there is a strong emphasis on participation from SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses, as well as DBE and MBE certified firms. Project plans and specifications are available upon request, and a quick payment agreement will be included.
D.R. Phillips, LLC

POSTED

about 7 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 23 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS