Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Illinois was posted on September 22, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2020 Districtwide Demolitions at Blackwell and Warrenville Grove

Closed
ITB-Z-021-038-0-2020/CWState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 7 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves the demolition and site restoration of two specific locations within DuPage County Forest Preserves, namely Blackwell Forest Preserve and Warrenville Grove Forest Preserve, as detailed in the project drawings prepared by the Forest Preserve District of DuPage County. The scope of work includes demolishing existing structures and foundations, removing foundations and base stones, and abandoning and demolishing utilities as depicted in the plans. After demolition, the sites will be backfilled with clean fill material, covered with a 6-inch layer of topsoil, and seeded to promote vegetation growth. Erosion control blankets will be installed to stabilize the disturbed areas and prevent erosion during the restoration process. The project was publicly solicited under the title "2020 Districtwide Demolitions at Blackwell and Warrenville Grove" with a solicitation number ITB-Z-021-038-0-2020/CW. It was posted on September 22, 2020, with a response deadline of October 6, 2020. The contract falls under the NAICS code 238910, which pertains to site preparation contractors, and is managed by the Forest Preserve District of DuPage County in Illinois. The project aims to responsibly decommission existing structures and restore the sites to a natural state, ensuring environmental stability and safety following demolition activities.

General Info

Agency

Illinois → Forest Preserve District of DuPage County

Place of Performance

IL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois → Forest Preserve District of DuPage County
ContactsNo contacts available
OfficeN/A
Organization / Agency
Illinois → Forest Preserve District of DuPage County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The work to be done for this project, shown on the Drawings entitled, “Home Demolition and Site Restoration at Blackwell Forest Preserve, 28 W 415 Mack Road West Chicago, IL” and “Home Demolition and Site Restoration at Warrenville Grove Forest Preserve, 28 W 140 Main Street Warrenville, IL” prepared by the Forest Preserve District of DuPage County dated 9/15/2020, consists of demolishing district structures and foundation, removing foundations and base stone. Utilities will be abandoned and demolished as shown on plans and the former building site will then be backfilled with clean fill and 6” of topsoil, seeded and stabilized with erosion control blanket.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS