Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 28, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2023-36 Marin City Donahue Street Portable Pump Station Project

Closed
35699State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Marin City Donahue Street Portable Pump Station Project, identified as County Project No. 2023-36, involves the installation of stormwater management improvements in Marin City, California. The scope of work includes the construction of two temporary wet wells, a new catch basin, and the replacement of an existing drainage inlet with a larger structure. These components will be connected by new storm drain piping. The project utilizes two County-purchased trailer-mounted pumps to move stormwater via 8-inch DIP intake piping and 12-inch HDPE force mains to an existing Pond outlet structure. Additional site work includes installing a gravel pad, replacing concrete curb and gutter, road resurfacing, and restoring pavement markings. The engineer's estimate for the project is 1,400,000 dollars. A mandatory pre-bid meeting was scheduled for June 25, 2024, at the southeast corner of the Marin Gateway Shopping Center. Bids are due by July 10, 2024, with the bid opening taking place via Zoom at 2:00 PM on that date. Paper bids must be delivered to the Director of Public Works at the Marin County Civic Center in San Rafael. Dave Bracken serves as the primary project contact for this solicitation.

General Info

Stormwater pump station installation in Marin City estimated at 1.4 million dollars.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 43 days
  • 26_1123 – Hanska-MNOpen now, due in 3 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → County of Marin
Contacts1 person available
OfficeN/A

Full Description

Show more
Project Name: MARIN CITY DONAHUE STREET PORTABLE PUMP STATION PROJECT County Project No. 2023-36
Project Contact & Email: Dave Bracken Sign up to see this detail
Project Description: Improvements for this project will generally include two temporary wet wells with two trailer mounted pumps, a new catch basin and replacing an existing drainage inlet with a larger catch basin structure. New storm drain pipe will connect the new catch basin, replaced drainage inlet and two wet well structures. The two trailer-mounted pumps will be purchased by the County prior to construction and will pump stormwater out of the wet wells via 8-inch DIP intake piping and discharge flow via 12-inch HDPE force mains into the existing Pond outlet structure located on the east side of the Pond, approximately 1,200 feet to the north. The proposed force main alignments is field fit and will run above grade and in parallel north around the Gateway Shopping Center parking lot (behind the back of curb as to not obstruct business operations) and continue north along the muscle wall east of the Pond, then west to discharge through the hatch on the Pond outlet structure. The improvements also include replacing sections of existing concrete curb and gutter with new concrete curb and gutter, a new gravel pad, road resurfacing and pavement markings/striping restoration. The work will take place on local (residential) roads in Marin City in the landscaped area north of the Drake Avenue and Donahue Street intersection.
Engineer's Estimate: $1,400.000
Bid Opening Date & Time (On Zoom): July 10, 2024 at 2:00 PM
Zoom Link for bid opening:https://us04web.zoom.us/j/76661709181?pwd=xanyaPPaq4foOYAa8H2PG6qJCpJIyQ.1 Zoom ID & Password:766 6170 9181, Password: DPW2024
A mandatory pre-bid meeting is scheduled for 1:00 p.m. on June 25, 2024 for this project. The pre-bid meeting location is the southeast corner of the Marin Gateway Shopping Center located in Marin City, CA.
If submitting a paper bid it needs to be addressed to the Director of Public Works and delivered to: Marin County Civic Center - Department of Public Works 3501 Civic Center Drive, Suite 304 San Rafael, CA 94903

More opportunities from California → County of Marin

Same awarding agency

NAICS: 541330
SLED
Building Permit Plan Review Service
Solicitation # 2911
The County of Marin Community Development Agency, Building and Safety Division, is soliciting proposals for as-needed building permit plan review overflow assistance. The scope of work includes technical plan reviews for single-family and multifamily dwellings, commercial tenant improvements, and new or remodeled commercial buildings. Selected vendors must ensure complex project reviews are completed within fifteen business days and demonstrate the ability to use ProjectDox software for digital reviews. All work must comply with the California Building Standards Code (Title 24, CCR), AB 2234 timelines, and current state and local building codes. The contract is intended for an initial three-year term, with the possibility of two one-year extensions and further extensions if authorized by FEMA through CalOES. Award decisions will be based on the most advantageous proposal, with a 5.0 percent preference for local county businesses and another 5.0 percent for contractors certifying that at least 50 percent of their workforce are Marin County residents, capped at a total of 10.0 percent. Proposals must be submitted by November 27, 2026, via Bid Express or email. Administrative requirements include a pass/fail verification for debarment and suspension, as well as a pass/fail evaluation for interviews and demonstrations. The contractor must maintain a documented quality assurance and quality control program and provide a certificate of liability insurance naming the County of Marin as an additional insured. Invoicing is conducted on a net 30 basis via postal mail, and the County will withhold 7 percent from payments to non-resident California vendors. Final authority regarding code interpretation and document compliance remains with the County Building Official.
Engineering Services

POSTED

13 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS