Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Pennsylvania was posted on May 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hallowell Street Reconstruction

Closed
Conshohocken Borough, Montgomery CountyState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Borough of Conshohocken is undertaking a comprehensive roadway rehabilitation project along Hallowell Street, specifically between 7th Avenue and 11th Avenue, with partial funding from the Pennsylvania Department of Economic Development’s Multimodal Transportation Grant Program. The work involves resurfacing the roadway and regrading the intersections at 8th and 9th Avenues. Key construction components include roadway resurfacing, drainage improvements, removal and replacement of subsurface drainage pipes with asphalt swales, and full-depth reconstruction of affected intersections. The project also features the installation of new ADA-compliant curb ramps, concrete driveway aprons, pavement milling and overlay resurfacing, asphalt base repairs, new pavement markings, and necessary incidental restorations. The solicitation for this contract is issued by Montgomery County, Pennsylvania, with a posting date of May 22, 2026, and a response deadline of June 12, 2026. The project aims to enhance the infrastructure and safety of Hallowell Street and its intersections while ensuring compliance with accessibility standards. The work will be performed within Montgomery County, with the details and submission information accessible through the specified bid platform.

General Info

Roadway rehabilitation on Hallowell Street, including resurfacing, drainage, ADA ramps, funded by state grant.

Agency

Pennsylvania → Montgomery County

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

Montgomery County, PA, USA

Set-Aside

NONE

Documents

(54)

Notice to Bidders - Hallowell Street Reconstruction, Borough of Conshohocken

PDFnotice-to-bidders

Appendix A Davis-Bacon Wage Determination PA20260004

PDFwage-determination

List of Drawings for Project

PDFlist-of-drawings

2023 CDBG Curb Ramp Installation - Phase 2 Advertisement for Bids

PDFadvertisement-for-bids

Bidder's Acknowledgement Form for 2023 CDBG Curb Ramp Installation - Phase 2

PDFbidder-acknowledgement-form

04. Information for Bidders.pdf

PDF

Contractor's Affidavit for 2023 CDBG Curb Ramp Installation - Phase 2

PDFcontractor-affidavit

2023 CDBG Curb Ramp Installation - Phase 2 Project Manual

PDFproject-manual

Agreement of Surety Company for 2023 CDBG Curb Ramp Installation - Phase 2

PDFagreement-of-surety

Doc 00 01 15-02 Borough of Conshohocken Typical Details

PDFspecifications

06. General Conditions.pdf

PDF

Restoration of Paved Surfaces Section 32 12 23

PDFspecifications

Appendix D General Federal and State Requirements

PDFsow

Portland Cement Concrete Paving Specifications

PDFspecifications

General Conditions for Hallowell Street Reconstruction Contract

PDFgeneral-conditions

2023 CDBG Curb Ramp Installation Phase 2 Agreement

PDFcontract-document

Doc 00 21 13 - Instructions to Bidders

PDFinstructions-to-bidders

Hallowell Street Reconstruction Project Plans

PDFproject-plans

Contractor's Release of Liens for 2023 CDBG Curb Ramp Installation - Phase 2

PDFcontractor-release-of-liens

Doc 00 45 19 Non-Collusion Affidavit

PDFnon-collusion-affidavit

Appendix C MBE-WBE Solicitation Form and Contractor List

PDFmbe-wbe-solicitation-form

CONSHOHOCKEN BOROUGH 2023 CDBG Curb Ramp Installation - Phase 2 Table of Contents

PDFtable-of-contents

Contract Closeout Procedures Section 01 70 00

PDFsow

DCED Multimodal Transportation Fund Grant Contract C000096634

PDFcontract-document

Performance Bond Document 00 61 13.13

PDFperformance-bond

Supplementary Conditions 00 73 00 for 2023 CDBG Curb Ramp Installation – Phase 2

PDFsupplementary-conditions

Maintenance Bond for 2023 CDBG Curb Ramp Installation - Phase 2

PDFmaintenance-bond

Doc 00 72 00 - Standard General Conditions of the Construction Contract

PDFgeneral-conditions

Bid Form Document 00 41 00

PDFbid-form

07. Technical Specifications - Hallowell Street Rehabilitation Project

PDFtechnical-specifications

Proposal Section for Hallowell Street Reconstruction PA460213T003

PDFproposal-section

Bid Bond Document 00 43 13

PDFbid-bond

Maintenance Bond for 2023 CDBG Curb Ramp Installation - Phase 2

PDFmaintenance-bond

02. Notice to Bidders.pdf

PDF

01. Signed Cover Sheet.pdf

PDF

Instructions for Electronic Bidding - Doc 00 21 13.1

PDFinstructions-for-electronic-bidding

03. Proposal Section.pdf

PDF

Consent of Surety to Final Payment for 2023 CDBG Curb Ramp Installation - Phase 2

PDFconsent-of-surety

05. Wage Rate Determination.pdf

PDF

Wage Rate Determination for Hallowell Street Reconstruction Project 26-04673

PDFwage-determination

Section 32 92 00 Finish Grading and Seeding Supplementary Conditions

PDFspecifications

Specifications for Hallowell Street Reconstruction Montgomery County

PDFspecifications

Section 32 17 26 ADA Detectable Warning Surface Specifications

PDFspecifications

Bidder Qualification Statement for 2023 CDBG Curb Ramp Installation - Phase 2

PDFbidder-qualification-statement

Payment Bond Document 00 61 13.16

PDFpayment-bond

Doc 00 01 15-03 Curb Ramp Design Plans

PDFother

Appendix B Public Works Employment Verification Form

PDFpublic-works-employment-verification-form

07. Technical Specifications.pdf

PDF

Information for Bidders - Hallowell Street Reconstruction

PDFinformation-for-bidders

Certificate of Insurance for 2023 CDBG Curb Ramp Installation - Phase 2

PDFcertificate-of-insurance

Section 32 17 23.33 Hot Thermoplastic Pavement Markings

PDFspecifications

08. Project Plans (18 Sheets).pdf

PDF

Contractor's Release of Liens for 2023 CDBG Curb Ramp Installation - Phase 2

PDFcontractor-release-of-liens

Doc 00 01 15-01 Curb Ramp Location Map

PDFlocation-map

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Montgomery County
ContactsNo contacts available
OfficeMontgomery County, PA, USA
Organization / Agency
Pennsylvania → Montgomery County
Office AddressMontgomery County, PA, USA
ContactsNo contact information available

Interested Companies (83)

Show more
KOG International
Lenhart Contractors
Gov Alpha
Brooklyn, NY

See All 83 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Borough of Conshohocken is performing roadway rehabilitation along Hallowell Street between 7th Avenue and 11th Avenue. A portion of the funding for this project will be provided by the Pennsylvania Department of Economic Development (DCED) Multimodal Transportation (MTF) Grant Program. The project will consist of roadway resurfacing and the re-grading of the intersections of Hallowell Street, 8th Avenue, and 9th Avenue. The full scope of construction items includes roadway resurfacing and intersection drainage improvements along Hallowell Street, the removal of subsurface drainage pipes and their replacement with asphalt swales to convey water through the intersections, which will include the full depth reconstruction of the affected intersections. The project also includes construction of new ADA compliant curb ramps, concrete driveway aprons, pavement mill and overlay resurfacing, asphalt pavement base repairs, installation of new pavement markings, and incidental restorations.