Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Colorado was posted on October 7, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2024 Bridge Rail Replacement Project Design

Closed
91050-1State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
Field coordinator services
Solicitation # RFP 25048
The British Columbia Hydro and Power Authority (BC Hydro) is soliciting proposals under RFP 25048 for Field Coordinator Services to support the installation of new substation and generation equipment, station one-line updates, and substation capital projects within the Lower Mainland and Bridge River region. The selected consultant will provide an expert in electric utility commissioning procedures responsible for verifying that all required tests are performed and signing the Construction Notification of Energization (CNE) to confirm equipment is ready for initial energization. The contract is expected to run from approximately December 2026 to December 2028, with an optional one-year extension for a total duration of three years. Compensation is based on time spent by personnel, and all invoicing must be processed through the Ariba system with a 30-day payment term. Proposals must be submitted by November 16, 2026, via the BC Bid e-service or physical delivery to the Burnaby, BC bid station. Evaluation is based on the highest weighting of criteria, including mandatory compliance with the Freedom of Information and Protection of Privacy Act (FOIPPA). Proponents must provide comprehensive documentation, including health, safety, and cybersecurity questionnaires, as well as relationship disclosure statements. Key requirements include strict adherence to environmental packaging standards, such as the use of PVC-free and recyclable materials, and the assignment of qualified personnel who cannot be changed without prior approval from BC Hydro. The award process allows BC Hydro to reject any proposal that presents a material risk regarding financial resources, safety records, or cybersecurity.
British Columbia Hydro and Power Authority

POSTED

about 22 hours ago

DEADLINE

in 23 days
NAICS: 541330
New
International
Village of Valemount Engineering for Accessiblity Impromvements at Cranberry Marsh
Solicitation # 2480-95-26
The Village of Valemount is seeking proposals under solicitation 2480-95-26 for engineering services to implement accessibility improvements at the Cranberry Marsh Boardwalk in British Columbia. The objective is to develop a shovel-ready planning package that includes a preferred concept plan, concept design drawings, and a Class C cost estimate. Additionally, the selected proponent must provide documentation and recommendations to support future grant applications, specifically for SHORE Stream 2. The total available budget for this project is up to 55,000 dollars, excluding GST, which must cover all professional fees, travel, and disbursements. The project must be completed by April 30, 2027, with a start date to be negotiated. All work must strictly adhere to the DWB Environmental Management Plan, requiring a qualified Environmental Monitor for sensitive phases and ensuring machinery is clean and leak-free to protect the wetland. Technical specifications require compliance with CAN/CSA-56-06 for design, CSA164 for galvanizing, and CSA G40.21M for structural steel. Proponents must submit a fixed-fee budget by phase, a work program, and a letter of introduction. This process is a request for proposals rather than a formal tender, and the Village reserves the right to negotiate a separate contract independently of the RFP process.
Village of Valemount

POSTED

about 23 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The 2024 Bridge Rail Replacement Project in Greenwood Village, Colorado, involves the design and planning for replacing bridge rails on Green Oaks Drive over the High Line Canal and Orchard Road over Greenwood Gulch, following recent infrastructure evaluations by the Colorado Department of Transportation. The project aims to address safety concerns identified in the biennial assessments, ensuring the structural integrity and safety of these key crossings. The contract, with a budget ranging from $500,000 to $2 million, is open for responses until October 25, 2024, and is managed by the City of Greenwood Village, a local government organization under the NAICS code 541330, which pertains to engineering services. Interested firms or individuals can contact Adam Koester via email for further details or to submit proposals. The project is part of the city’s ongoing efforts to maintain and upgrade its transportation infrastructure, emphasizing safety and compliance with state assessments. The solicitation is publicly available through the designated bidding platform, providing an opportunity for qualified design professionals to contribute to this critical infrastructure improvement initiative.

General Info

Place of Performance

CO, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → City of Greenwood Village
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
**91050-1 - Design Project for the 2024 Bridge Rail Replacement.** This project is located in Greenwood Village, Arapahoe County, Colorado, United States. Every two years, the City receives an evaluation from the CDOT Bridge Unit concerning the state of its infrastructure. The latest assessment highlighted concerns regarding the bridge on Green Oaks Drive over the High Line Canal and the bridge on Orchard Road over Greenwood Gulch... (additional details not provided).

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS