Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Maine was posted on May 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2025-033 Rosedale St., Marston St., & Lincoln Dr. Water Main Replacement & Road Rehab

Closed
2025-033State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 12 hours ago

DEADLINE

in 8 days

General Info

Place of Performance

ME, USA

Set-Aside

NONE

Documents

3

Bid 2025-033: Rosedale, Marston & Lincoln Water Main and Road Rehab

PDF, High priority: read this firstrfb
High

Bid No. 2025-033: Rosedale, Marston, Lincoln Dr Water Main and Road Rehab

PDF, High priority: read this firstifb
High

Bid No. 2025-033: Rosedale, Marston, Lincoln Dr Water Main and Road Rehab Plans

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMaine → City of Lewiston
Contacts1 person available
OfficeN/A
Organization / AgencyMaine → City of Lewiston
Office AddressN/A
Contacts
Christine WebberContact

Full Description

Show more
The work for the ROSEDALE STREET, MARSTON STREET & LINCOLN DRIVE WATER MAIN REPLACEMENT & ROAD REHAB consist of, but not be limited to, the complete and satisfactory construction of installation of:- 700 CY Aggregate Base- 100 CY Aggregate Subbase- 900 Ton 19mm Hot Mix Asphalt- 700 12.5mm Hot Mix Asphalt- 170 Ton Hand Placed Pavement- 10 LF 2” Fusible HDPE Water Main- 980 LF 6” DI Water Main- 1,000 LF 8” DI Water Main- 12 LF 12” DI Water Main- 920 LF ¾” Water Services- 2 Hydrant Installations- 1 LS Furnish & Install Temporary Water Services- 57 VF 4’ Dia. Sanitary Manhole, Frame, Cover- 6 LF 6” Solid SDR35 PVC Pipe- 91 LF 8” Solid SDR35 PVC Pipe- 10 LF 12” Solid SDR35 PVC Pipe- 1,000 LF Slipform Concrete Curbing- 210 LF Vertical Granite CurbingWork within Rosedale Street will include new water main construction, miscellaneous sewer main work and full-width street re-paving. Work within Marston Street will include new water main construction followed by trench re-paving. Work within Lincoln Drive will include new water main construction, miscellaneous sewer main work and full width street re-paving.All work on this contract must be completed by no later than August 30, 2026.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS