Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on August 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2025 AC Water Main Replacement

Closed
2026-AFB-030State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
2025 CDBG- No. 25p-y-095-1-6798
Solicitation # 25P-Y-095-1-6798
Solicitation 25P-Y-095-1-6798 is a request for sealed bids from the McIntosh County Board of Commissioners for water system improvements in Georgia. The scope of work includes the construction of approximately 8,956 linear feet of 6-inch C900 Class 150 PVC water main, the installation of seven 6-inch mechanical joint ductile iron gate valves, twelve 3-way fire hydrant assemblies, and two connections to existing water mains. Additionally, the project requires the installation of a new 5,000-gallon hydropneumatic tank, 40 square yards of Class A pavement removal and replacement, and all necessary erosion control and appurtenances. All work must be completed within 60 consecutive calendar days from the date of the notice to proceed. This is a Section 3 Covered Contract under the HUD Act of 1968, and bidders must provide Section 3 documentation prior to the notice of award. The project also mandates compliance with the Build America, Buy America (BABA) Act. Bids must be submitted on the provided proposal forms and accompanied by a bidder's bond for 10 percent of the bid amount. Successful bidders will be required to furnish payment and performance bonds along with insurance certificates. The deadline for submission is 1:00 PM local time on December 1, 2026, at the McIntosh County Commissioners Office in Darien, Georgia.
Mcintosh County Board of Commissioners

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The City of Mercer Island is soliciting bids for the 2025 AC Water Main Replacement project, identified as solicitation 2026-AFB-030. The project involves replacing approximately 5,700 linear feet of asbestos cement water main with ductile iron pipe, including the installation of fire hydrant assemblies, water services, connections, and associated roadway restoration. This initiative aims to eliminate the risk of catastrophic system failure and remove the remaining 4% of AC mains in the city's water system, which will subsequently end the requirement to report AC main information to the Washington State Department of Health. The engineer's estimated cost for the project is 4,425,000 dollars. Bids are due by September 17, 2026, and a mandatory pre-bid meeting is scheduled for September 2, 2026. The selected contractor must commence work within ten days of the Notice to Proceed and adhere to strict quality and safety standards, including OSHA/WISHA requirements. Key contractual obligations include providing performance and payment bonds equal to 100% of the contract amount and a bid deposit of 5% of the total bid price. Additionally, the contractor must comply with apprenticeship utilization goals, submitting a detailed plan and weekly certified payroll. The project is located in Mercer Island, Washington, and is managed by the Public Works department.

General Info

Mercer Island seeks bids for 2025 AC water main replacement costing 4,425,000 dollars.

Documents

13

2026 AFB030 - 2025 AC Water Main Replacement

PDF, High priority: read this first68 pages · ifb
High

2026-AFB-030 2025 AC Water Main Replacement

PDF, High priority: read this firstifb
High

2026-AFB-030 2025 AC Water Main Replacement

PDF, High priority: read this firstifb
High

2026-AFB-030: 2025 AC Water Main Replacement

PDF, High priority: read this firstifb
High

City of Mercer Island 2025 AC Water Main Replacement Project Bid Set

PDF, High priority: read this firstbid-set-plans
High

City of Mercer Island Apprentice Utilization Plan Instructions and Forms

PDF, High priority: read this first5 pages · apprentice-utilization-plan
High

Specifications.pdf - Special Provisions and Bid Item Schedule

PDF, High priority: read this firstspecifications
High

Certificate of Insurance for Sewer Pump Station Generator Replacement Bid No. 24-26

PDF, Low priority1 page · certificate-of-insurance
Low

City of Mercer Island 2025 AC Water Main Replacement Public Works Contract

PDF, Low priority11 pages · contract-document
Low

IRS Form W-9 Request for Taxpayer Identification Number and Certification March 2024

PDF, Low priority6 pages · tax-form
Low

Payment Bond for City of Mercer Island Construction Project

PDF, Low priority2 pages · payment-bond
Low

Performance Bond for City of Mercer Island Project

PDF, Low priority2 pages · performance-bond
Low

Retainage Agreement for Contract

PDF, Low priority2 pages · contract-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Public Works
Contacts1 person available
OfficeMercer Island, WA, 98040, USA
Organization / AgencyWashington → Public Works
Office AddressMercer Island, WA, 98040, USA
Contacts
Lauren KumleUtilities Engineer

Interested Companies (25)

Fury Site WorksNorth Bend, WA
Advanced Government ServicesTacoma, WA
ConstructconnectCincinnati, OH

See All 25 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The AC replacement program reduces the potential for catastrophic system failure, unexpected service disruptions, and large damage claims to the City. Additionally, the City is currently required to report AC main information to the Washington State Department of Health. Once the existing five miles of AC main, which account for only 4% of the City's water system, are fully removed, that reporting requirement will end. This project furthers goals outlined in the City's Water System Plan, ensuring necessary improvements so the City remains at the forefront in providing high-quality water service to its current and future customers.

More opportunities from Washington → Public Works

Same awarding agency

NAICS: 237310
New
SLED
Pedestrian Crossing Safety Improvements (FHWA)
Solicitation # 2025-041
The Pedestrian Crossing Safety Improvements project (PW# 2025-041 / HSIP-000S(708)) is a federally funded infrastructure initiative managed by the Seattle Department of Transportation. The project focuses on enhancing pedestrian safety across eight specific locations in Seattle, including intersections at 15th Ave S and Lander St, 33rd Ave S and Myrtle Pl, Renton Ave S and Holden St, 55th Ave S and Renton Ave S, Rainier Ave S and S Byron St, Rainier Ave S and S Findlay St, Rainier Ave S and S Mead St, and Beacon Ave S and S Webster St. The scope of work encompasses sidewalk and pavement removal and restoration, the installation of pedestrian islands, curbs, curb ramps, drainage structures, and pipes, as well as clearing, grubbing, landscaping, and the installation of RRFB and traffic signals, signing, channelization, electrical work, and rebar. The engineer's estimate for the project is between $3,250,000 and $3,350,000. The contract is awarded to the apparent low bidder who meets all mandatory responsibility criteria, with a tie-breaker based on the highest percentage of recycled materials proposed. Performance must be completed within 120 working days from the Notice to Proceed. Funding is provided by the HSIP FHWA Grant and the Transportation Levy Fund, requiring compliance with Federal Prevailing Wage Rates, Buy America standards, and Federal Small Business Enterprise (FSBE) goals. Bidders must provide a bid guaranty of five percent of the total bid and certify compliance with equal opportunity and non-discrimination laws. The project is subject to rigorous inspection by the Engineer to determine substantial completion, which requires the owner to have full operational and safety use of the facilities.
Highway, Street, and Bridge Construction

POSTED

about 17 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
1st Ave NE Shared Use Path - N 120th to N 130th
Solicitation # PW#2026-005
The City of Seattle Public Works department is soliciting bids for the 1st Ave NE Shared Use Path project, located between N 120th and N 130th Streets, adjacent to North Acres Park and near James Baldwin Elementary School. The scope of work is divided into a base bid, which includes pavement removal, roadway paving, sidewalks, curb ramps, storm drains, landscaping, channelization, and signage, and additive work consisting of electrical installations, foundations, and pedestrian lighting. The project requires a performance period of 120 working days for the base bid or 140 working days if additive work is included. Bids must be submitted electronically via the OpenGov portal by October 28, 2026. The contract will be awarded to the apparent low bidder who meets strict responsibility criteria, including possession of a Seattle Business License, registration on the OpenGov portal, and compliance with fair labor standards and social equity requirements. Bidders must provide a bid guaranty of five percent of the total bid and are required to submit a WMBE Inclusion Plan and a Social Equity Plan. Post-award performance will be evaluated based on workforce requirements, priority hire projections, and apprenticeship utilization. The contractor is responsible for all labor, materials, and equipment, ensuring all work meets City of Seattle Standard Specifications and ADA compliance for curb ramps. Payment is contingent upon the submission of signed statements certifying that prevailing wages have been paid.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 6 hours
View Details
NAICS: 236220
New
SLED
Dahl Restroom Renovation
Solicitation # 2025-068
Solicitation PW#2025-068 is for the renovation of a fire-damaged Parks storage and restroom building located at 7700 25th Ave NE, Seattle, WA. The scope of work includes replacing fire-damaged structural timber frames, installing shear walls, replacing the roof, and removing an existing stone chimney. Interior improvements involve converting the facility into two single-occupancy restrooms with entirely new electrical and plumbing systems. Additionally, the project requires accessibility site improvements, including the revision of accessible parking stalls, sidewalks, and the pathway leading to the restrooms. The engineer's base estimate for the project is $968,676.00. The contract will be awarded to the responsible bidder providing the lowest responsive bid, with evaluation based on mandatory responsibility criteria and supplemental factors such as labor standards compliance, equal benefits declarations, and apprentice utilization. Bidders must submit their proposals electronically via OpenGov by November 4, 2026. Key requirements include a bid guaranty of five percent of the total bid, adherence to prevailing wage rates, and compliance with ADA standards. The contractor is subject to liquidated damages of $1,000.00 per working day for delays beyond the substantial completion date. All work is subject to inspection and final approval by the Engineer.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 7 days
View Details
NAICS: 562991
New
SLED
Stormwater Filter Facility Maintenance
Solicitation # 2026-GEN-013
The City of Washougal is soliciting bids for the inspection and maintenance of stormwater filter cartridge facilities, including filter catch basins, manholes, and vaults. The scope of work comprises a base bid for 23 City-maintained facilities containing up to 134 cartridges and an optional alternate bid for up to 10 HOA-maintained facilities containing up to 63 cartridges. Key responsibilities include facility inspections, replacement of cartridges based on Ecology TAPE guidance, vacuum cleaning of facility floors, implementation of traffic control plans for specific high-traffic areas, and the proper hauling and disposal of all waste materials. All work must be documented via Survey123 and completed within 90 calendar days of the notice to proceed, with a final completion deadline of March 15, 2027. Bids must be submitted electronically via the OpenGov portal by November 5, 2026, at 2:00 p.m. PT. Requirements for bidders include the submission of a Bid Bond, E-Verify Declaration, Wage Compliance, and Non-Collusion forms, as well as acknowledgment of Addendum No. 1. The project mandates the payment of prevailing wages and requires the contractor to provide performance and payment bonds for the full contract amount. Payment will be made via checks within 30 days of approved progress payment requests, with a 5 percent retention held during the progress of the work. Partial funding for this project is provided through the Washington State Department of Ecology.
Septic Tank and Related Services

POSTED

7 days ago

DEADLINE

in 8 days
View Details
NAICS: 237310
SLED
Roosevelt Way Preservation (FHWA)
Solicitation # 2025-074
The Roosevelt Way Preservation Project (Solicitation 2025-074) is a federally funded infrastructure initiative managed by the City of Seattle Department of Transportation. The project focuses on roadway improvements along Roosevelt Way NE from NE 92nd Street to Pinehurst Way NE, and Pinehurst Way NE from Roosevelt Way NE to 15th Avenue NE. The scope of work includes planing asphalt overlay, removing and replacing select concrete panels and base repair, and performing an intersection realignment at NE 113th Street. Additional requirements include the installation of curb bulbs at NE 114th and 115th Streets, ADA-compliant curb ramps, sidewalk restoration, channelization, signing, concrete bike barriers, traffic signals, landscaping, and storm drainage. The engineer's estimate for the project is between $12,500,000 and $12,800,000, with a physical completion timeline of 250 working days from the Notice to Proceed. Bids for the project open on November 4, 2026, and must be submitted via the OpenGov portal or in hard copy. The contract mandates a 13% Frontline Small Business Enterprise (FSBE) goal and requires strict adherence to the Buy America Act, Title VI of the Civil Rights Act of 1964, and various state and federal wage and labor laws. Bidders must provide a bid guaranty of 5% of the total bid and maintain a valid Seattle Business License and UBI number. Performance and payment bonds are required to protect claims under Washington state law. Quality control is the sole responsibility of the contractor, with specific inspection requirements for shelter footings by KC Metro and strict compliance with Department of Ecology and EPA water quality standards.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 7 days
View Details
NAICS: 541330
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Engineering Services

POSTED

8 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS