Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Minnesota was posted on April 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2025 Concourse E and F Bridge Heating and Cooling System Replacement

Closed
Solicitation054State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
DEMOLITION OF THE CAMP HILL SQUARE APARTMENTS
Solicitation # 2027-RFP-033
Solicitation 2027-RFP-033 is a request for proposals issued by the Housing Opportunities Commission of Montgomery County for the demolition and waste removal of the Camp Hill Square Apartments in Gaithersburg, Maryland. The project scope involves the demolition of five apartment buildings containing 51 vacant units and a management office, including the removal of all above-grade structures, slabs, foundation walls, footers, and side wall walkways. Additionally, the contractor is responsible for removing above-grade utilities, capping or abandoning underground utilities, and clearing dumped materials and interior fencing at the neighboring Emory Grove Village parcel. The selected firm will be tasked with procuring all necessary Montgomery County demolition and raze permits, managing the removal of hazardous materials such as asbestos, and stabilizing the property according to the approved Sediment Control Plan. The contract features an initial performance period of four months from the Notice to Proceed. Proposals are due by October 30, 2026, via the OpenGov Procurement Portal and are evaluated based on schedule (20%), price (15%), and MFD participation. Key compliance requirements include adherence to Davis-Bacon and Maryland Prevailing Wage Laws, mandatory background screenings for all personnel, and participation in the HOC Works Program. Awardees must provide 100% payment and performance bonds, proof of insurance, and execute HUD certifications regarding debarment and suspension. HOC will retain 5% of payments until final acceptance, with liquidated damages of up to 1,000 dollars per day for incomplete work.
Real Estate

POSTED

about 3 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

This contract involves a comprehensive overhaul of the heating and cooling infrastructure for Concourse E and F, including the replacement of high-pressure steam service to Concourse E with the abandonment of the existing steam lines in place. It encompasses expanding an existing fire protection system, removing outdated hydronic heating components, and installing new forced air conditioning systems to improve climate control. The project also includes replacing heat exchangers and hydronic pumps, installing new area drains, and reinforcing the structural integrity of existing concrete floor slabs through structural reinforcement, concrete coring, and shaft wall construction. Additionally, the scope covers lighting upgrades, selective demolition of existing architectural features, and repairs to fireproofing, plaster, gypsum board, and acoustic ceiling panels. The project is managed by the Airport Development organization in Minnesota, with a contract value estimated between five and fifteen million dollars, and responses are due by May 13, 2025.

General Info

Place of Performance

MN, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMinnesota → Airport Development
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Replacement of high pressure steam service to Concourse E with abandonment of old steam lines in place, expansion of an existing fire protection system, removal of old hydronic heating and installation of new forced air conditioning systems, replacement of heat exchangers and hydronic heating system pumps and associated new area drains, structural reinforcement of existing composite concrete floor slabs, concrete coring and shaft wall construction, lighting replacement, architectural selective demolition and repair of existing plaster on wire lath fire proofing, gypsum board, and acoustic panel ceilings.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS