Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2025 Pavement Improvements

Closed
2025 Pavement ImprovementsState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The contract titled "2025 Pavement Improvements" involves a comprehensive scope of work primarily focused on roadway maintenance and enhancements within California, specifically for the City of Salinas. The work includes mobilization, disposal of materials, and the excavation and repair of various pavement surfaces such as Hot Mix Asphalt (HMA), aggregate base, and rubberized HMA overlays. Additionally, the project encompasses crack treatment, installation of roadside signs and posts, pavement markings and striping, erosion and sediment control measures, and traffic control to ensure safety and compliance throughout the project duration. All work must adhere to the plans and special provisions outlined in the contract, including incidental and restorative improvements. The solicitation was posted on April 25, 2025, with a response deadline of May 23, 2025. The project has a contract value estimated between $500,000 and $2,000,000, and is managed by the California organization under the NAICS code 237310, which pertains to highway, street, and bridge construction. The contract aims to improve pavement conditions and roadway infrastructure, requiring qualified contractors to execute a range of construction activities efficiently and in accordance with specified standards. Interested vendors can find additional details and submit proposals through the provided online portal.

General Info

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Salinas
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Salinas
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
In general, the work shall include, but is not limited to: mobilization; disposal of material; dig out and repair HMA pavement, aggregate base repair, RHMA-G and Type A HMA pavement overlay, crack treatment, installation of roadside signs and posts, pavement markings and striping, erosion and sediment control, traffic control, and all incidental and appurtenant improvements and restorations specified on the Plans and herein these Special Provisions.

More opportunities from California → City of Salinas

Same awarding agency

NAICS: 237310
SLED
2026 Citywide Sidewalk Repair Project
Solicitation # 9720
The 2026 Citywide Sidewalk Repair Project (CIP No. 9720) is a solicitation by the City of Salinas, California, for the comprehensive repair of citywide sidewalks. The scope of work includes the demolition and removal of curbs, gutters, driveway approaches, and cross gutters, as well as the disposal of existing trees and stumps. All construction must adhere to the 2008 City of Salinas Standard Specifications and the 2008 ADA Standards for Accessible Design and Build. The project is divided into two primary deliverables: Base Bid No. 1, which must be completed within 155 working days, and Base Bid No. 2, which must be completed within 25 working days. These timelines exclude a 15-calendar-day period for material submittals and a 180-calendar-day plant establishment and maintenance period. The contract will be awarded to the lowest responsive and responsible bidder based on the total of Base Bid No. 1-2 (Items 1-38). To be considered valid, bidders must submit all required City of Salinas forms, provide proof of active contractor licensing, and submit a bid bond equal to 10% of the bid amount. Post-award requirements include the provision of performance and payment bonds, as well as adherence to prevailing wage rates as determined by the Director of the DIR. Bids must be submitted electronically via the PlanetBids website by 2:00 PM PST on November 23, 2026. Project administration is led by Project Manager Victoria Gutierrez and City Engineer Adriana Robles, P.E., with final acceptance contingent upon a review following the 180-day plant maintenance period.
Highway, Street, and Bridge Construction

POSTED

18 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS