Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

2025 Road Repair and Accountability Act (RRAA) Project 2

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 2025 Road Repair and Accountability Act (RRAA) Project 2 is a forecast infrastructure initiative managed by the County of Tulare in California. The project focuses on repairing asphalt materials across six specific road segments located in the unincorporated communities of Plainview, Pixley, Tipton, Ducor, and Seville. The scope of work includes performing isolated pavement repairs, installing new asphalt surfacing, and adding a thin course of granular material to roadway shoulders for leveling to minimize drop-off heights. Additionally, all newly surfaced roadways will receive new traffic stripes and pavement markings. The project is designed to improve public safety and transportation infrastructure without adding any additional roadway capacity. Construction is anticipated to begin between the first and second quarters of 2026. The project is classified under NAICS code 237310 and has been declared exempt from certain environmental review requirements under the California Environmental Quality Act (CEQA) and Government Code Section 6103. Key administrative personnel include Project Engineer Claudia Sanchez, Environmental Planner Jessica Wills, and Chief Planner Gary Mills, with the Resource Management Agency serving as the lead agency. The specific work locations include segments of Road 196, Road 152, Avenue 152, Thompson Road, Avenue 56, and Road 156.

General Info

Tulare County road repairs in five communities starting Q1/Q2 2026 for public safety.

Agency

California → Tulare County

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Tulare County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Tulare County
Office AddressN/A
Contacts
Jessica WillsEnvironmental Planner
Claudia SanchezProject Engineer

Full Description

Show more
The Project consists of repairing asphalt materials on multiple segments of existing County roads. The work includes a combination of isolated pavement repairs followed by the installation of new asphalt surfacing. All projects will include corrective work (adding a thin course of granular material for leveling to minimize drop-off heights for overlays) to be performed on the shoulders of the roadways. No additional roadway capacity is added. Furthermore, all newly surfaced roadways will receive new traffic stripes and pavement markings. Efficient and responsive improvements and maintenance of the County road network will enhance the safety and security of the public by improving the access of pedestrians and the transportation infrastructure for the general population throughout the region. Construction is anticipated to begin during the first quarter through the second quarter of 2026. The Project will benefit users of the roadways.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. The project is located in California and encompasses a broad range of civil infrastructure and site work. Key scopes of work include underground utilities such as tunneling, boring, jacking, micro tunneling, and cathodic protection; site preparation involving land surveying, site clearing, shoring, and subsurface investigation; and surface improvements including asphalt paving, traffic signals, lighting, and landscaping. Required materials include ready mix supply, precast concrete, manhole materials, and valves. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Additionally, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected electronic system. The deadline for bid submission is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237310
New
SLED
KTA 8297
Solicitation # 8297
KTA Contract 8297, managed by the Kansas Turnpike Authority, involves the installation of an Ultrathin Bonded Asphalt Surfacing (UBAS) overlay on I-35, including interchanges, from mile marker 112 to 132 in Lyon County. The scope of work encompasses UBAS, commercial grade asphalt patching and surfacing, patching of the I-35 mainline, and the milling and inlaying of the outside shoulder. Key deliverables include the installation of specific pavement markings, such as 12-inch white chevron lines and 6-inch yellow edge lines, and the implementation of comprehensive work zone traffic control. Performance is scheduled in phases, with asphalt patching and commercial grade paving starting no earlier than April 12, 2027, and UBAS and remaining work commencing after May 31, 2027. The contract will be awarded to the lowest responsible bidder based on the summation of unit prices multiplied by approximate quantities. Bidders must provide a statement of financial condition unless pre-qualified by the Kansas Department of Transportation or the Authority, and must submit a bid bond of 5 percent of the bid. The contractor is required to provide certificates of insurance for Workers' Compensation, Employer's Liability, and Comprehensive Public Liability and Property Damage Insurance. All work must adhere to the 2015 Standard Specifications for State Road and Bridge Construction and KDOT Construction Manual standards, with strict prohibitions against making turnarounds through the barrier wall.
Kansas Turnpike Authority

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 237310
New
SLED
KTA 8289
Solicitation # 8289
The Kansas Turnpike Authority solicitation 8289 is for a roadwork project on I-335 in Shawnee County, spanning from mile marker 183.5 to 194.5. The scope of work includes pavement patching, the application of Type A Ultrathin Bonded Asphalt Surface (UBAS) on eastbound and westbound mainline lanes, and a 2-inch cold mill and 2-inch inlay on the shoulders. The contractor is also responsible for installing all mainline permanent pavement markings. All work must adhere to the 2015 Edition of the Standard Specifications for State Road and Bridge Construction published by the Kansas Department of Transportation, with specific asphalt mix requirements of SM-12.5A or SR-12.5A and binder grades of PG 64-28 and PG 70-28. The project is scheduled to begin no earlier than March 15, 2027, with a final completion date for minor clean-up work of November 19, 2027. Quality control and testing must be performed by an independent laboratory approved by the Director of Engineering, while the Authority handles batch plant inspection. Financial terms include a 5% retainage from the total work completed until contract and bond provisions are met. The contractor must maintain specific insurance coverages, including 1 million dollars for general and automobile liability and statutory worker's compensation. Strict safety protocols are in place, including a prohibition on turnarounds through barrier walls; violations will result in immediate work suspension without extensions to completion deadlines. The Kansas Turnpike Authority is tax-exempt under K.S.A. 79-3606(d).
Kansas Turnpike Authority

POSTED

1 day ago

DEADLINE

in 2 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS