This Solicitation opportunity from Florida was posted on June 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2025 St. Joseph Peninsula Beach Renourishment And Coastal Structures Project

Closed
2425-23State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica Public Works Engineering Division. The project involves comprehensive upgrades and improvements to the San Vicente and Mt. Olivette reservoirs, with an estimated contract value of $27,344,000. Bidders are required to hold a Class A General Engineering license. The scope of work includes civil, structural, and electrical improvements, such as the installation of flexible expansion joints, meter and valve vaults, and concrete-lined swales, as well as cathodic corrosion protection and SCADA integration. The contract specifies a performance period of 730 calendar days, though the sample contract mentions substantial completion within 520 calendar days from the Notice to Proceed. Bids must be submitted electronically via the OpenGov portal by November 5, 2026, at 3:00 pm. Key requirements include the provision of Labor and Material Payment and Performance Bonds for 100% of the contract sum, compliance with prevailing wages, and adherence to the Santa Monica Living Wage Ordinance. Liquidated damages for delays are set at $13,200 per day. The project is subject to rigorous inspection standards, including ASTM and CBC requirements, with the Prime Contractor responsible for contracting and billing Enterprise Automation for specific integration services.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 13 hours ago

DEADLINE

in 8 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 20 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The contract involves a comprehensive beach renourishment project along 1.1 miles of the Gulf County shoreline at St. Joseph Peninsula, Florida. The scope includes the placement of approximately 830,000 cubic yards of beach-compatible sand sourced from an offshore borrow area, with the aim of restoring and enhancing the existing beach and partially rebuilding the dunes. Additionally, the project entails constructing eight submerged breakwaters between designated points to provide coastal protection. An ecological component involves the supply and planting of around 118,000 native dune plants to support dune stabilization and habitat restoration. The work is scheduled to be completed within 180 calendar days from the Notice to Proceed, expected around December 1st, with a target completion date of May 1, 2025. The project is valued between $15 million and $25 million and is managed by Gulf County, Florida. The primary point of contact is Joseph Morrow, who can be reached via email. The project emphasizes timely execution, environmental restoration, and coastal protection, aligning with Gulf County’s broader coastal management and resilience efforts. Interested parties can find additional details and bidding information through the Gulf County website.

General Info

Documents

1

Informal Bid Request 2425-23 Wedgewood Grass Greens Replacement

PDF, High priority: read this firstinformal-bid-request
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jan 30, 2025 to Jul 17, 2025. The notice title changed. NAICS code removed. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Gulf County
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → Gulf County
Office AddressN/A
Contacts
Joseph Morrow

Full Description

Show more
The WORK consists of the placement of approximately 830,000 cubic yards of beach compatible sand obtained from an offshore borrow area located offshore of St. Joseph Peninsula, Gulf County, Florida to renourish 1.1 miles of beach which includes the partial replacement of the dune. The beach fill will be placed between DEP Monuments R-100 to R-105.8 (~1.1 miles). The WORK also includes the construction of eight (8) submerged breakwaters between DEP R-101 and R-105. The WORK shall additionally include the supply and installation of approximately 118,000 native dune plants. The WORK will be completed and ready for final payment within 180 calendar days after the date of Notice to PROCEED (anticipated by December 1st) as indicated in the AGREEMENT. It is the goal to have the project completed by May 1, 2025.

More opportunities from Florida → Gulf County

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS